Bricklaying in Enfield

Obtain Bricklaying Prices in Enfield

Home > General Building Projects > Bricklayers > Enfield

Bricklaying in Enfield

Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of your home.

 

This solid wall will need foundations or lintel supports which might or might not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the outer brickwork walls, they will require additional insulation. This is usually done by adding interior wall insulation like insulated plasterboard, or by adding an additional layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. In addition, if the walls are shared with a neighbour's property, the brickwork will have to adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.

 

Contrary to numerous beliefs, a bricklayer really does greater than laying of bricks. There's more to being a bricklayer than you can possibly think about. A single bricklaying projects requires a vast range of skills. Let's look at these skills!

  • Making use of moist resistant materials to seal structures.
  • Spreading out mortar in between joints and using them to act as a thick layer binding the bricks together in rows.
  • Reviewing as well as functioning from specifications along with plans.
  • Working with brick-cutting devices.
  • Taking charge and also taking care of cement blocks or bricks, clay blocks and also the sort.
  • Building of scaffolding - based on belongings of some licenses in some states.

This is not merely an cosmetic choice, as complementing existing brickwork is potentially a requirement of planning permission or building regulations in your area. We will give as much as 4 Bricklayers pros locally, that will provide quotes for the job you want done. You'll receive a home visit from specialists in Enfield that'll aid you to pick the ideal Bricklayers for your home prior to accomplishing the installation. Enter your postcode to begin looking currently.

Average Bricklayers cost in Enfield

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Enfield, as reported by local LeadsDoWork members.

Bricklayers installation cost in Enfield 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in November 2024

Bricklayers Projects in Enfield in October 2024

10,238

Requests for quotations in Enfield in October 2024

0

Requests for Bricklayers quotations in Enfield in October 2024. 0% change from September 2024.

0

Requests for Bricklayers quotations in Middlesex in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Enfield October 2024

Enfield

The London Borough of Enfield is a London borough in north London with some districts inside the borough straddling north-east London, England. It borders the London Boroughs of Barnet (to the west), Haringey (to the south) and Waltham Forest (towards the south-east), the districts of Hertsmere (towards the north-west), Welwyn Hatfield and Broxbourne (both towards the north) in Hertfordshire, and Epping Forest (towards the east) in Essex. The local authority is Enfield Council. It covers a total area of 31.74 square miles.

In line with population estimates from the middle of 2014, the borough has a permanent population of about 324574 inhabitants. The armorial bearings of these three boroughs had been also merged. The heraldic beast on the shield of the Enfield coat of arms is identified in heraldry as an 'Enfield', or more colloquially as the 'Enfield beast', and it is made use of extensively as a logo representing Enfield, specifically by the borough council. The Borough's Civic Centre is located in Silver Street, Enfield Town and is the location of the Council. Enfield Town is also home to the nearby credit union, North London Credit Union.

In 2007, Enfield Town centre completed a major redevelopment project. An extension was added onto the current retail area with several new shops. As well as this, a major redevelopment of Edmonton Green, including the shopping centre, an adjacent municipal housing over a wide area, began in 1999 in order to provide new housing, health facilities, a new leisure centre, a supermarket, and lots of other civic features.

Looking for Bricklayers in Enfield?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Enfield

09 Jul

Building work | Bricklaying

Enfield - EN2

Enquiry from: George G

Start Date: Immediate

build a 3m high wall attached to back of house - foundations first, i install an aluminium veranda, then you infill with wall 3.9m long are you the property owner: owner of the property property type:...

Post a similar request >

20 Mar

Building work | Bricklaying

Enfield - EN2

Enquiry from: Tony B

Start Date: Immediate

a garden gate pillar has been knocked down. brickwork to be placed in matching old yellow stock bricks and the gate refitted to it. this is an insurance qoute. are you the property owner: owner of the...

Post a similar request >

10 Jun

Building work | Bricklaying

Pinner - HA5

Enquiry from: V

Start Date: Immediate

Bricklayers Lead

walk in front garden and side of wall are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to be...

Post a similar request >

23 Feb

Building work | Bricklaying

Harrow - HA1

Enquiry from: Deanna H

Start Date: Immediate

I need the my front garden wall redone Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the bricks ...

Post a similar request >

10 Aug

Building work | Bricklaying

Harrow - HA3

Enquiry from: Tim O

Start Date: 1 to 3 months

Part of front wall of the property need rebuilding and gate replaced (insurances claim) Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs...

Post a similar request >

13 Feb

Building work | Bricklaying

London - W13

Enquiry from: Gordhan N

Start Date: Immediate

single storey side extension and rear double storey extension

Post a similar request >

08 Feb

Building work | Bricklaying

Harrow - HA2

Enquiry from: SAROJINI T

Start Date: Immediate

Customer visited the mydrivewayprices.co.uk site and submitted an enquiry. Property type: Semi detached, Property owner: Owner, Work description: bRICK LAYERS

Post a similar request >

30 Dec

Building work | Bricklaying

Watford - WD25

Enquiry from: Maria M

Start Date: 1 to 3 months

30foot breeze block wall to build have blocks already Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Medium job Do you req...

Post a similar request >

16 Feb

Building work | Bricklaying

Watford - WD25

Enquiry from: John C

Start Date: Immediate

Extension around 110m2 of block required Please contact to appoint

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Enfield

Get free, no-obligation quotes from 4 verified Builders working in Enfield.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Do bricklayers need a license?

Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.

As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.

It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.

Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.

Placholder Image

Other Top Projects in Enfield

Are you a builder in Enfield?

We can help you get more Bricklayers work and boost your business.

Join today