Building work | Bricklaying
Nottingham - NG13
Enquiry from: Ryan A
Start Date: Immediate
I’d like a quote to have a broken fence replaced with a brick wall / fence combo
Extensions will usually demand brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For many conversions, the garage door is infilled and a brick wall with a couple of windows is added to the front or side of your home.
This solid wall requires foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, so the new brickwork wall will need to take this into account. Depending on the current thickness of the external brickwork walls, they might require supplemental insulation. Normally, this is done by adding internal wall insulation like insulated plasterboard, or by adding an additional layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. In addition, if the walls are shared with a neighbouring property, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the house.
Unlike lots of ideas, a bricklayer actually does more than laying of bricks. There's more to being a bricklayer than you can possibly consider. A single bricklaying projects needs a wide variety of abilities. Let's take a look at these skills!
This is not simply an cosmetic decision, as matching existing brickwork is possibly a requirement of planning permission or building regulations in your area. We will provide approximately four Bricklayers pros locally, that will supply quotes for the work you desire done. You'll get a property visit from specialists in Nottingham who'll aid you to pick the best Bricklayers for your home before performing the installment. Enter your postal code to begin looking currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Nottingham in December 2024
Requests for Bricklayers quotations in Nottingham in December 2024. 0% change from November 2024.
Requests for Bricklayers quotations in Nottinghamshire in December 2024. 0% change from November 2024.
Nicknamed Queen of the Midlands, Nottingham houses in excess of 300,000 people, and is notorious by means of its connections to Robin Hood. Structures inside the city backtracks to 1100s and elaborate structures are on display from the 19th century. The city is divided up, with Georgian and Victorian eras seen to the west and modern developments to the east. Homeowners and landlords from Newcastle are in need of property upkeep work and our vetted contractors provide no cost rates.
Nottingham - NG13
Enquiry from: Ryan A
Start Date: Immediate
I’d like a quote to have a broken fence replaced with a brick wall / fence combo
Nottingham - NG6
Enquiry from: BRYAN D
Start Date: Immediate
BRICKWORK REPAIRS TO MY GARAGE AT THE FRONT.
Nottingham - NG8
Enquiry from: Jay J
Start Date: Immediate
spalled brick repair on the outside walls of the house are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: medium job do you re...
Nottingham - NG3
Enquiry from: Anish G
Start Date: Immediate
a bricklayer for one day. required to bring mortar we have some bricks need about another 40 bricks. to lay 2 rows of bricks one along the top of wall which has been reduced in height and the second a...
Nottingham - NG11
Enquiry from: Rachael K
Start Date: Less than one month
steal above french doors and single back door. brick lintel removed in-between doors. small interior wall knocked through. i already have a window guy that needs work done before fitting bifolds. than...
Nottingham - NG9
Enquiry from: Katherine T
Start Date: Immediate
i need some quality pointing to be done as a flat roofer has damaged some of my brickwork and it needs to be repaired and a few bricks relaid as some are loose or have come off the parapet wall (blue ...
Nottingham - NG8
Enquiry from: Sandra R
Start Date: 1 to 3 months
this house is suffering mining subsidence. there are cracks in various area that appear to be still moving as filled cracks have obviously separated again. i haven’t yet had a full structural survey...
Nottingham - NG9
Enquiry from: Colin B
Start Date: Immediate
dividing wall needs taking back to good and rebuilding. are you the property owner: owner of the property property type: other how much work would you say needs to be done: small job do you require th...
Nottingham - NG10
Enquiry from: Robert F
Start Date: Immediate
appx. 40ft brick wa*** high with capping for front garden. l shaped, against pavement at front and neighbour's garden on other side are you the property owner: owner of the property property type: ...
Nottingham - NG9
Enquiry from: Nachi A
Start Date: Immediate
boundary wall (double skin, 2m high), around 55 +/- 5 linear metre. for half, foundation already in place and for another half, a new foundation is needed. if interested, can construct porch, a path a...
Nottingham - NG15
Enquiry from: Samantha E
Start Date: 1 to 3 months
repointing entire house. detached cottage are you the property owner: owner of the property property type: detached what type of work do you need to have done: brick work do you have the materials you...
Nottingham - NG5
Enquiry from: Pauline R
Start Date: Immediate
repointing and small wall to be built property type: terrace do you require the bricks to be supplied too: yes are you the property owner: owner of the property how much work would you say needs to b...
Nottingham - NG2
Enquiry from: John K
Start Date: Immediate
block wall of approx. 120 blocks are you the property owner: owner of the property property type: detached do you require the bricks to be supplied too: yes how much work would you say needs to be do...
Nottingham - NG14
Enquiry from: Chris R
Start Date: Less than one month
repair to building foundation. not an extensive repair but access is difficult are you the property owner: owner of the property property type: semi detached what type of work do you need to have do...
Nottingham - NG2
Enquiry from: Peter H
Start Date: Immediate
one wall of our house - 1938 4 bed detached - needs repointing as it is getting quite damp. grateful if you could let us have a quote. are you the property owner: owner of the property property type...
Nottingham - NG2
Enquiry from: Julian J
Start Date: Immediate
our garden wall at rear on garden is in severe disrepair, a large section needs to be rebuilt due to tree root growing through. is this something you can help with? are you the property owner: owner o...
Nottingham - NG9
Enquiry from: Steve H
Start Date: Less than one month
I require 3 concrete blocked window frames re pointing. Remove old mortar (some already falling out ) and replace with new. One window on ground floor, two on first floor. May only need two sides of f...
Nottingham - NG9
Enquiry from: Andy W
Start Date: 1 to 3 months
Wall needs building at the front of property. Are you the property owner: Owner of the property Property Type: Terrace How much work would you say needs to be done: Small job Do you require the bricks...
Nottingham - NG12
Enquiry from: Martyn C
Start Date: 1 to 3 months
Looking to remove and replace sleepers with a stone or brick wall approx 2ft in height
Nottingham - NG5
Enquiry from: J
Start Date: Immediate
Build new 2 bedroom house
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Nottingham.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.
Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!
• Using damp resistant materials to seal foundations.
• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.
• Reading and working from specifications as well as plans.
• Working with brick-cutting machines.
• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.
• Construction of scaffolding - subject to possession of some licenses in some states.
A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.
A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:
• Ability to work at heights and outdoors
• Enjoy practical work
• Technical aptitude
• Good hand-eye coordination
• Independent and yet a team player too
• Top physical fitness
• Attitude and attendance.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today