Bricklaying in Newcastle Upon Tyne

Compare Bricklaying Prices in Newcastle Upon Tyne

Home > General Building Projects > Bricklayers > Newcastle Upon Tyne

Bricklaying in Newcastle Upon Tyne

Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For some conversions, the garage door is infilled and a solid wall with a couple of windows is put into the front or side of the home.

 

This brick wall requires foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the exterior brickwork walls, they will require supplemental insulation. Normally, this is done by adding internal wall insulation like insulated plasterboard, or by adding another layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.

 

Unlike lots of beliefs, a bricklayer actually does greater than laying of blocks. There's even more to being a bricklayer than you can possibly consider. A single bricklaying projects calls for a vast variety of skills. Allow's have a look at these skills!

  • Using moist resistant materials to seal foundations.
  • Spreading mortar in between joints as well as applying them to work as a thick layer binding the bricks together in rows.
  • Checking out and functioning from specs in addition to plans.
  • Dealing with brick-cutting makers.
  • Taking charge and also taking care of cement blocks or blocks, clay bricks and the likes.
  • Construction of scaffolding - based on ownership of some licenses in some states.

This is not simply an cosmetic decision, as complementing existing brickwork is potentially a condition of planning permission or building regulations in your area. We will supply as much as 4 Bricklayers pros in your area, who will provide quotes for the work you desire done. You'll obtain a property visit from specialists in Newcastle Upon Tyne who'll help you to select the appropriate Bricklayers for your residence prior to carrying out the installment. Enter your postal code to start browsing currently.

Average Bricklayers cost in Newcastle Upon Tyne

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Newcastle Upon Tyne, as reported by local LeadsDoWork members.

Bricklayers installation cost in Newcastle Upon Tyne 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in February 2025

Bricklayers Projects in Newcastle Upon Tyne in January 2025

6,045

Requests for quotations in Newcastle Upon Tyne in January 2025

0

Requests for Bricklayers quotations in Newcastle Upon Tyne in January 2025. 0% change from December 2024.

0

Requests for Bricklayers quotations in Tyne And Wear in January 2025. 0% change from December 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Newcastle Upon Tyne January 2025

The North East is the second smallest of England's nine zones and has the ninth greatest population, with approximately 2.5 million people. Nevertheless, the area features many of the UK's key counties including a small part of North Yorkshire, Tyne and Wear, Northumberland and County Durham. The region enjoys a low population density of 289 people per square kilometre, with the administrative headquarters in Newcastle. For all your household developments in North East England, making use of reliable professionals will ensure you get the best finish.

Looking for Bricklayers in Newcastle Upon Tyne?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Newcastle Upon Tyne

17 Oct

Building work | Bricklaying

Newcastle upon Tyne - NE2

Enquiry from: Philip T

Start Date: Immediate

2 storey new build 10m x14 m mainly block work, plus some face brickwork. looking for two gangs or a 4/2 for 5 weeks work are you the property owner: owner of the property property type: other how mu...

Post a similar request >

21 Feb

Building work | Bricklaying

Newcastle upon Tyne - NE3

Enquiry from: Stephen M

Start Date: Immediate

Bricklayers Lead Bricklayers Lead

to build a brick fence/wall (approx 7 x 11ft) with opening for doorway. located in the back lane this wall defines and secures my property. an existing up and over metal door needs to be dismantled ar...

Post a similar request >

04 Feb

Building work | Bricklaying

Newcastle upon Tyne - NE16

Enquiry from: Debra H

Start Date: Immediate

small garden wall approx 3/4 feet high by 12/15 feet long are you the property owner: owner of the property property type: detached how much work would you say needs to be done: small job do you requi...

Post a similar request >

21 Apr

Building work | Bricklaying

Newcastle upon Tyne - NE12

Enquiry from: Mark R

Start Date: Immediate

60sqm of bricks and blocks to lay are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to be sup...

Post a similar request >

04 Apr

Building work | Bricklaying

Newcastle upon Tyne - NE15

Enquiry from: Leo G

Start Date: Immediate

the front garden wall and wooden side fence needs knocking down with a new wall and fence built. a new metal front gate is also needed are you the property owner: owner of the property property type: ...

Post a similar request >

16 Jun

Building work | Bricklaying

Newcastle upon Tyne - NE3

Enquiry from: Mike B

Start Date: Less than one month

Remove garage door and build up opening in facing brick, including toothing out etc with UPVC window supplied. Labour only or labour and materials Are you the property owner: Relative of Owner Prop...

Post a similar request >

12 Feb

Building work | Bricklaying

Sunderland - SR3

Enquiry from: Heather F

Start Date: Immediate

Brick gatepost and approx 1.5m of brick wall knocked down by an accident. Need it rebuilt asap as House sale completion is next week

Post a similar request >

09 Dec

Building work | Bricklaying

Chester le Street - DH3

Enquiry from: John O

Start Date: 1 to 3 months

brick gatepost repair/rebuild are you the property owner: owner of the property property type: detached what type of work do you need to have done: brick work do you have the materials you need in or...

Post a similar request >

08 Jun

Building work | Bricklaying

Stanley - DH9

Enquiry from: Carl N

Start Date: Immediate

garden wall rebuild - 13ft x 9ft. supply of materials and removal of rubble. are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: me...

Post a similar request >

14 Feb

Building work | Bricklaying

Consett, Durham, Stanley - DH8

Enquiry from: Michael H

Start Date: Immediate

an external single-brick dividing wall separates the driveway of the property from the one next door, and it is attached inbetween the integral garages of both properties, of these two 'link-detached'...

Post a similar request >

22 Jan

Building work | Bricklaying

Washington - NE38

Enquiry from: John A

Start Date: Immediate

remove old boundary fencing, replace with brick pillers and partcial fence panels. are you the property owner: owner of the property property type: detached how much work would you say needs to be don...

Post a similar request >

23 Aug

Building work | Bricklaying

Washington - NE38

Enquiry from: Rita M

Start Date: Immediate

brickwork in arch over porch door has started to slip. porch is single storey with about 3 courses of brick over the arch and under a flat roof. i think the arch will need rebuilding. are you the prop...

Post a similar request >

09 Aug

Building work | Bricklaying

Chester le Street - DH3

Enquiry from: Sharon L

Start Date: Immediate

repair to internal bedroom wall are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: medium job do you require the bricks to be suppli...

Post a similar request >

14 Nov

Building work | Bricklaying

Seaham - SR7

Enquiry from: David T

Start Date: Immediate

Build a yard wall

Post a similar request >

14 Jul

Building work | Bricklaying

Sunderland - SR3

Enquiry from: Alan T

Start Date: Less than one month

Alteration to external and internal wall on kitchen and roof to change shape layout of kitchen Are you the property owner: Owner of the property Property Type: Terrace Do you require the bricks to be ...

Post a similar request >

14 Sep

Building work | Bricklaying

Seaham - SR7

Enquiry from: Andrew S

Start Date: Immediate

Damp course and chimney breast removed (chimney above roof already removed) and lintel required. Contact me ASAP please, as I would like to start ASAP also. Are you the property owner: Owner of t...

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Newcastle Upon Tyne

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Newcastle Upon Tyne.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Placholder Image

Other Top Projects in Newcastle Upon Tyne

Customer Reviews

Overall rating:


Newcastle Upon Tyne Bricklayers installers are rated 4.9 out of 5 based on 1 reviews of 7 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Newcastle Upon Tyne Bricklayers contractors

Are you a builder in Newcastle Upon Tyne?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today