Bricklaying in Consett

Request Bricklaying Prices in Consett

Home > General Building Projects > Bricklayers > Consett

Bricklaying in Consett

Extensions will usually demand brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For many conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of your home.

 

This solid wall will require foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they'll require extra insulation. Normally, this is done with the addition of internal wall insulation like insulated plasterboard, or by adding a supplementary layer of brickwork to create a cavity wall. These options are again reliant on the existing garage foundations. In addition, if any of the walls are shared with a neighbouring property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.

 

Contrary to numerous beliefs, a bricklayer in fact does more than laying of bricks. There's more to being a bricklayer than you can possibly think of. A single bricklaying tasks needs a vast selection of skills. Allow's look at these skills!

  • Making use of moist resistant materials to seal foundations.
  • Spreading mortar between joints and also using them to act as a thick layer binding the bricks with each other in rows.
  • Checking out as well as working from specs along with plans.
  • Working with brick-cutting machines.
  • Taking charge and also taking care of concrete blocks or blocks, clay bricks as well as the sort.
  • Construction of scaffolding - based on possession of some licenses in some states.

This is not just an visual decision, as complementing existing brickwork could be a condition of planning permission or building regulations in your area. We will offer approximately 4 Bricklayers pros in your area, who will certainly use quotes for the work you want done. You'll get a property visit from professionals in Consett who'll help you to select the appropriate Bricklayers for your home prior to performing the setup. Enter your postal code to start searching now.

Average Bricklayers cost in Consett

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Consett, as reported by local LeadsDoWork members.

Bricklayers installation cost in Consett 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in November 2024

Bricklayers Projects in Consett in October 2024

635

Requests for quotations in Consett in October 2024

0

Requests for Bricklayers quotations in Consett in October 2024. 0% change from September 2024.

0

Requests for Bricklayers quotations in County Durham in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Consett October 2024

Consett

Consett is really a town in the north west of County Durham, England, approximately 14 miles (23 km) southwest of Newcastle upon Tyne. It is actually home to 27,397.

Looking for Bricklayers in Consett?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Consett

14 Feb

Building work | Bricklaying

Consett, Durham, Stanley - DH8

Enquiry from: Michael H

Start Date: Immediate

Bricklayers Lead Bricklayers Lead Bricklayers Lead Bricklayers Lead

an external single-brick dividing wall separates the driveway of the property from the one next door, and it is attached inbetween the integral garages of both properties, of these two 'link-detached'...

Post a similar request >

09 Dec

Building work | Bricklaying

Chester le Street - DH3

Enquiry from: John O

Start Date: 1 to 3 months

brick gatepost repair/rebuild are you the property owner: owner of the property property type: detached what type of work do you need to have done: brick work do you have the materials you need in or...

Post a similar request >

08 Jun

Building work | Bricklaying

Stanley - DH9

Enquiry from: Carl N

Start Date: Immediate

garden wall rebuild - 13ft x 9ft. supply of materials and removal of rubble. are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: me...

Post a similar request >

10 Mar

Building work | Bricklaying

Crook - DL15

Enquiry from: Hazel W

Start Date: 1 to 3 months

probably wall ties and pointing on gable end, plastering of hallway and staircase and some worrying damp on internal wall are you the property owner: owner of the property property type: semi detache...

Post a similar request >

22 Jan

Building work | Bricklaying

Washington - NE38

Enquiry from: John A

Start Date: Immediate

Bricklayers Lead Bricklayers Lead Bricklayers Lead

remove old boundary fencing, replace with brick pillers and partcial fence panels. are you the property owner: owner of the property property type: detached how much work would you say needs to be don...

Post a similar request >

23 Aug

Building work | Bricklaying

Washington - NE38

Enquiry from: Rita M

Start Date: Immediate

brickwork in arch over porch door has started to slip. porch is single storey with about 3 courses of brick over the arch and under a flat roof. i think the arch will need rebuilding. are you the prop...

Post a similar request >

09 Aug

Building work | Bricklaying

Chester le Street - DH3

Enquiry from: Sharon L

Start Date: Immediate

repair to internal bedroom wall are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: medium job do you require the bricks to be suppli...

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Consett

Get free, no-obligation quotes from 4 verified Builders working in Consett.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

What is the ratio of sand and cement for bricklaying?

When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.

Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.

Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.

Placholder Image

Other Top Projects in Consett

Are you a builder in Consett?

We can help you get more Bricklayers work and boost your business.

Join today