Enquiry from: Gary M
Start Date: Immediate
Pointing of brick work on house
Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For many conversions, the garage door is infilled and a brick wall with one or two windows is put into the front or side of your home.
This brick wall will need foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, so the new brickwork wall should take this into account. Depending on the current thickness of the outer brickwork walls, they'll require extra insulation. This is usually done by adding interior wall insulation like insulated plasterboard, or with the addition of an additional layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. In addition, if any of the walls are shared with a neighbour, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the home.
Unlike lots of beliefs, a bricklayer really does greater than laying of bricks. There's more to being a bricklayer than you can probably consider. A single bricklaying jobs calls for a vast selection of skills. Allow's take a look at these abilities!
This is not only an cosmetic choice, as coordinating with existing brickwork is possibly a condition of planning permission or building regulations in your area. We will give up to 4 Bricklayers pros in your area, that will certainly provide quotations for the job you desire done. You'll get a property visit from professionals in County Londonderry that'll assist you to pick the right Bricklayers for your home prior to executing the setup. Enter your postal code to start searching currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in County Londonderry in October 2024
Requests for Bricklayers quotations in County Londonderry in October 2024. 0% change from September 2024.
Requests for Bricklayers quotations in Northern Ireland in October 2024. 0% change from September 2024.
Londonderry - BT48
Enquiry from: Gary M
Start Date: Immediate
Pointing of brick work on house
Londonderry - BT48
Enquiry from: Christie M
Start Date: Immediate
Small extension at 35 Lower Garden City around 500 soap bars
Coleraine - BT52
Enquiry from: Ryan M
Start Date: Immediate
Small skip please for brick rubble. Thanks
Answer a few quick questions, so we can match you with professionals who can help.
Get free, no-obligation quotes from 4 verified Builders working in County Londonderry.
Compare customer reviews, services and prices, and choose the right professional for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.
As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.
It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.
Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
We can help you get more Bricklayers work and boost your business.