Bricklaying in Newham

Discover Bricklaying Prices in Newham

Home > General Building Projects > Bricklayers > Newham

Bricklaying in Newham

Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of the house.

 

This solid wall will require foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the exterior brickwork walls, they might require additional insulation. Normally, this is achieved with the addition of interior wall insulation like insulated plasterboard, or with the addition of another layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.

 

Contrary to many ideas, a bricklayer really does more than laying of bricks. There's more to being a bricklayer than you can probably think about. A single bricklaying projects calls for a large variety of abilities. Let's take a look at these abilities!

  • Using wet resistant materials to secure structures.
  • Spreading mortar in between joints as well as applying them to act as a thick layer binding the blocks together in rows.
  • Reading as well as working from specifications along with plans.
  • Working with brick-cutting makers.
  • Taking charge as well as taking care of concrete blocks or bricks, clay blocks and the sort.
  • Building of scaffolding - subject to ownership of some licenses in some states.

This is not just an cosmetic decision, as coordinating with existing brickwork is potentially a condition of planning permission or building regulations in your area. We will provide as much as 4 Bricklayers pros locally, who will offer quotes for the job you desire done. You'll obtain a home visit from experts in Newham that'll help you to select the right Bricklayers for your house before accomplishing the installation. Enter your postal code to start looking currently.

Average Bricklayers cost in Newham

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Newham, as reported by local LeadsDoWork members.

Bricklayers installation cost in Newham 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in April 2025

Bricklayers Projects in Newham in March 2025

0

Requests for quotations in Newham in March 2025

0

Requests for Bricklayers quotations in Newham in March 2025. 0% change from February 2025.

0

Requests for Bricklayers quotations in London County in March 2025. 0% change from February 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Newham March 2025

Newham

The London Borough of Newham is a London borough within east London. It's roughly 5 miles (8 km) east of the City of London, north of the River Thames. The borough was formed by merging the previous area of the Essex county borough of East Ham plus the county borough of West Ham as a borough of the newly formed Greater London, on 1 April 1965. Green Street and Boundary Road mark the former boundary between the two. North Woolwich also became a part of the borough, which was previously within the Metropolitan Borough of Woolwich, south of the River Thames within the County of London, in addition to a small area west of the River Roding which had previously been a part of the Municipal Borough of Barking.

The borough covers an overall area of 13.98 square miles. According to population estimates made during 2014, Newham is a borough with a permanent population of about 324322 inhabitant. In line with the 2011 Census, Newham has the youngest overall population in the nation. Transport in Newham is undergoing a significant upgrade, with the completed Docklands Light Railway and Jubilee Line Extension, and new or enhanced stations at Canning Town, West Ham and Stratford. The Docklands Light Railway was extended to serve London City Airport.

Newham was among the six host boroughs for the 2012 Summer Olympics and contains many of the Olympic Park which includes the Olympic Stadium.

Looking for Bricklayers in Newham?

Get free quotes from local builders

Get free quotes

Bricklayers pros in Newham

J Alexander Building and Maintenance

1 review(s)
Based: in Barking, IG11 9JN

Latest review

G., IG6
4

Building work | Bricklaying in Ilford

He is very keen

Similar Customer Enquiries for Bricklayers in Newham

08 Mar

Building work | Bricklaying

London - E16

Enquiry from: Suzy O

Start Date: Immediate

cracks in boundary brick wall needs fixing. are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job

Post a similar request >

30 Sep

Building work | Bricklaying

London - E3

Enquiry from: Christine L

Start Date: Immediate

small skip to remove brick planter, access is limited to 3m width

Post a similar request >

25 Oct

Building work | Bricklaying

Borehamwood - WD6

Enquiry from: Susan L

Start Date: 1 to 3 months

customer in borehamwood area has requested that we arrange quotes for their building maintenance project.mrs are considering various options and would like to discuss with a builder directly.please ca...

Post a similar request >

23 Feb

Building work | Bricklaying

Harrow - HA1

Enquiry from: Deanna H

Start Date: Immediate

I need the my front garden wall redone Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the bricks ...

Post a similar request >

29 Jan

Building work | Bricklaying

Edgware - HA8

Enquiry from: Alpa P

Start Date: Immediate

Property owner Please call to appoint

Post a similar request >

19 Aug

Building work | Bricklaying

London - W5

Enquiry from: Mike P

Start Date: 1 to 3 months

1) Removing and reseating the top 3 courses of bricks on the second floor wall tops which include some arched red brick window supports approx. 20 linear metres 2) Repointing to approximately 100sqm ...

Post a similar request >

10 Aug

Building work | Bricklaying

Harrow - HA3

Enquiry from: Tim O

Start Date: 1 to 3 months

Part of front wall of the property need rebuilding and gate replaced (insurances claim) Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs...

Post a similar request >

23 May

Building work | Bricklaying

Borehamwood - WD6

Enquiry from: Melvyn P

Start Date: Less than one month

To complete 3 walls with Brick Slips The walls are 2.4m x 3.6m,2.3m x 8.9m and 1.76m x 3m. Brick slips to be supplied. After completion, all 3 walls to be sealed Are you the property owner: Owner o...

Post a similar request >

13 Feb

Building work | Bricklaying

London - W13

Enquiry from: Gordhan N

Start Date: Immediate

single storey side extension and rear double storey extension

Post a similar request >

29 Sep

Building work | Bricklaying

Edgware - HA8

Enquiry from: Art H

Start Date: Immediate

Build 2 extension walls 100mm blocks on the flat 12.4 long x 2m high.(1000 blocks) 3 walls total 12.2 long by 2.7 high standard build (on edge) 330 blocks. Are you the property owner: Owner of th...

Post a similar request >

29 Mar

Building work | Bricklaying

London - W5

Enquiry from: C

Start Date: Immediate

rebuild low brick wall in front garden and make concrete stand for wheelie bins.

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Newham

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Newham.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

Placholder Image

Other Top Projects in Newham

Customer Reviews

Overall rating:


Newham Bricklayers installers are rated 4 out of 5 based on 10 reviews of 98 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Newham Bricklayers contractors

Are you a builder in Newham?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today