J Alexander Building and Maintenance
Based: in Barking, IG11 9JNLatest review
G., IG6
Building work | Bricklaying in Ilford
He is very keen
Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of the property.
This brick wall will need foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, so the new brickwork wall will need to take this into account. Depending on the current thickness of the external brickwork walls, they'll require supplemental insulation. Normally, this is achieved by adding internal wall insulation like insulated plasterboard, or by adding an extra layer of brickwork to create a cavity wall. These options are again dependent on the existing garage foundations. In addition, if the walls are shared with a neighbour's property, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.
Contrary to lots of ideas, a bricklayer in fact does greater than laying of blocks. There's even more to being a bricklayer than you can most likely consider. A solitary bricklaying jobs needs a broad array of abilities. Allow's take a look at these abilities!
This is not simply an aesthetic decision, as coordinating with existing brickwork could be a requirement of planning permission or building regulations in your area. We will give approximately four Bricklayers pros in your area, who will certainly offer quotes for the job you want done. You'll get a home visit from experts in Tower Hamlets who'll help you to choose the appropriate Bricklayers for your residence before performing the installment. Enter your postcode to start searching now.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Tower Hamlets in March 2025
Requests for Bricklayers quotations in Tower Hamlets in March 2025. 0% change from February 2025.
Requests for Bricklayers quotations in London County in March 2025. 0% change from February 2025.
The London Borough of Tower Hamlets is a London borough towards the east of the City of London and north of the River Thames. Covering a total area of approximately 7.63 square miles, it's in the eastern part of London and covers much of the conventional East End. The London Borough of Hackney lies to the north of the borough while the River Lea forms the boundary with the London Borough of Newham towards the east. Around the other side of the Thames is the London Borough of Southwark to the southwest, The London Borough of Lewisham towards the South, along with the Royal Borough of Greenwich to the southeast. The River Lea also forms the boundary between these parts of London historically in Middlesex, with these formerly in Essex.
In accordance with population estimates made in the middle of 2014, the borough features a permanent population of around 284015 individuals. It also contains a lot of the redeveloped Docklands region of London, including West India Docks and Canary Wharf.
The borough is also reasonably well-known for being home to the Women's Library in Aldgate, which is Great Britain's principal library and museum resource on women and the women's movement, particularly concentrating on Britain in the 19th and 20th centuries. Also, a part of the Queen Elizabeth Olympic Park is in Tower Hamlets.
He is very keen
London - E16
Enquiry from: Suzy O
Start Date: Immediate
cracks in boundary brick wall needs fixing. are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job
London - E4
Enquiry from: Mehmet N
Start Date: Immediate
to replace existing garden wall of 12m l by 2m h are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: medium job do you requir...
London - E3
Enquiry from: Christine L
Start Date: Immediate
small skip to remove brick planter, access is limited to 3m width
London - E9
Enquiry from: Ingrid K
Start Date: Less than one month
take down one course brick wall front 9ft X 2,5ft (245cm x 75cm) rebuild footingd for railings
London - E2
Enquiry from: Fabio P
Start Date: Immediate
building a reclaimed brick parting garden wall (19x5ft) Are you the property owner: Owner of the property Property Type: Terrace How much work would you say needs to be done: Medium job Do you requi...
Pinner - HA5
Enquiry from: V
Start Date: Immediate
walk in front garden and side of wall are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to be...
Hounslow - TW4
Enquiry from: Anthony B
Start Date: Immediate
rebuild wall which was blown down by last weekend’s storm. 6.5m long x 2.7m height two brick thick. are you the property owner: owner of the property property type: semi detached how much work would...
Hounslow - TW5
Enquiry from: Rizwan S
Start Date: Immediate
micro-digger hire for a day cost on it's own and also with operator. are you the property owner: owner of the property property type: semi detached what type of work do you need to have done: brick wo...
Hounslow - TW3
Enquiry from: Abubakar A
Start Date: Immediate
we're looking to take down fences and its foundation and replace it with brick wall. the garden is quite large so we need advise on best solution and quotes for completing the job. are you the proper...
Twickenham - TW2
Enquiry from: Jane M
Start Date: Immediate
front garden - wall on 3 sides & refuge collection area. paving - both from not and back garden are you the property owner: owner of the property property type: detached how much work would you say n...
Harrow - HA1
Enquiry from: Deanna H
Start Date: Immediate
I need the my front garden wall redone Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the bricks ...
Southall - UB2
Enquiry from: Aurangzeb C
Start Date: Immediate
I have a brick wall to the side of my semi detached property "shared" with neighbor. It is approximately 8metres long and am looking for a rebuild of the wall or a portion to be rebuilt to a 1.5 metre...
Hounslow - TW3
Enquiry from: Sandy A
Start Date: Immediate
I need somebrickwork a d rendering on the front of the dormer please
Harrow - HA2
Enquiry from: SAROJINI T
Start Date: Immediate
Customer visited the mydrivewayprices.co.uk site and submitted an enquiry. Property type: Semi detached, Property owner: Owner, Work description: bRICK LAYERS
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Tower Hamlets.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.
Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!
• Using damp resistant materials to seal foundations.
• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.
• Reading and working from specifications as well as plans.
• Working with brick-cutting machines.
• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.
• Construction of scaffolding - subject to possession of some licenses in some states.
A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.
A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:
• Ability to work at heights and outdoors
• Enjoy practical work
• Technical aptitude
• Good hand-eye coordination
• Independent and yet a team player too
• Top physical fitness
• Attitude and attendance.
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today