J Alexander Building and Maintenance
Based: in Barking, IG11 9JNLatest review
G., IG6
Building work | Bricklaying in Ilford
He is very keen
Extensions will usually demand brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For most conversions, the garage door is infilled and a solid wall with one or two windows is put into the front or side of the home.
This solid wall will require foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the external brickwork walls, they might require extra insulation. Normally, this is done by adding internal wall insulation like insulated plasterboard, or with the addition of a supplementary layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if the walls are shared with a neighbour's property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.
As opposed to numerous beliefs, a bricklayer in fact does more than laying of bricks. There's even more to being a bricklayer than you can probably consider. A solitary bricklaying jobs requires a broad variety of skills. Allow's look at these abilities!
This is not simply an visual choice, as matching existing brickwork is potentially a condition of planning permission or building regulations in your area. We will offer approximately four Bricklayers pros in your area, that will provide quotes for the work you want done. You'll receive a property visit from professionals in Barkingside that'll help you to pick the right Bricklayers for your house before executing the installment. Enter your postal code to begin browsing currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Barkingside in December 2024
Requests for Bricklayers quotations in Barkingside in December 2024. 0% change from November 2024.
Requests for Bricklayers quotations in London County in December 2024. 0% change from November 2024.
Barkingside is a district of Ilford within the London Borough of Redbridge in north east London. It was a part of Essex until Redbridge was created in 1965. It is primarily known for Barnardo’s, the children’s charity, which was founded there in 1866. It continues to have its headquarters there. The oldest buildings in Barkingside are the Barnardo’s chapel, the London Underground station and Holy Trinity Church. Barkingside is a diverse district, with an unusually high population of London’s Jewish community.
Many of the buildings along the High Street are owned by Lord Alan Sugar, and there are numerous other amenities within the district. The Fullwell Cross Library is a Grade II listed building, fashioned in a distinctive circular shape. A leisure centre also holds the same name. Ken Aston Square was opened in 2014, named after a local head teacher and football referee, believed to have introduced red and yellow cards. Residents chose the name from a shortlist.
Redbridge FC play non-league football at the Oakside stadium, which is adjacent to Barkingside tube station. Barkingside Recreational Ground in Mossford Green is a well-liked open space with residents. Also, footballer Trevor Brooking who played for West Ham United and England attended Ilford County High School in the area. Scott Malvern, British Racing driver, also was born in Barkingside and attended Caterham High School, which is a sports academy attended by youth team players of West Ham.
He is very keen
Ilford - IG1
Enquiry from: Giuseppe B
Start Date: Immediate
repointing of first floor back facade of a standard terraced house. possibly some brick repair. repair of the 2 window sills if needed are you the property owner: owner of the property property type: ...
Ilford - IG1
Enquiry from: Justin W
Start Date: Immediate
repairs to damaged garden wall. are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: small job do you require the bricks to be ...
Ilford - IG2
Enquiry from: Christopher M
Start Date: Less than one month
Rebuild columns of gate and connect with railing Are you the property owner: Owner of the property Property Type: Terrace How much work would you say needs to be done: Small job Do you require the br...
Ilford - IG2
Enquiry from: A
Start Date: Immediate
3 pillows to build up and closing the garden wall, where now exist a little gate (about 300 bricks)
Ilford - IG6
Enquiry from: G
Start Date: Immediate
Rear Extension Brick work only, 2 Walls 6M X 2.5M 1 Wall 5.2M X 2.5M
London - SW6
Enquiry from: Emily S
Start Date: Immediate
repointing whole back side of victorian house, ***m, brick are you the property owner: owner of the property property type: terrace what type of work do you need to have done: brick work do you have t...
London - NW6
Enquiry from: Wael A
Start Date: Immediate
repointing of side wall of a victorian terrace and a chimney. are you the property owner: owner of the property property type: terrace what type of work do you need to have done: brick work do you ha...
London - N3
Enquiry from: Lee-Anne H
Start Date: Less than one month
render needs removing, brickwork underneath needs fixing and new render on top are you the property owner: owner of the property what type of work do you need to have done: brick work do you have the ...
London - SW6
Enquiry from: Shahida N
Start Date: Immediate
Re-pointing and repair gutter.
London - NW10
Enquiry from: James B
Start Date: 1 to 3 months
Great, so where are you looking to have the work done? Build Wall Supply skips in order to remove existing fencing. Approximately 40 meters long. Supply bricks and rest of the materials, Double brick...
Barnet - EN5
Enquiry from: Sam S
Start Date: Immediate
Customer made an online enquiry for Bricklaying via one of our websites. Confirmed via SMS/. Please call to arrange an appointment to quote.
London - NW11
Enquiry from: Hazel L
Start Date: Immediate
Rear garden - to build a wall with concrete slabs 12' long and 7' high. No need to paint the slabs.
London - N3
Enquiry from: Ervin H
Start Date: Immediate
home owner replace existing retaining wall 12m long approx supplied & fitted time scale- immediate please call to appoint *
London - N3
Enquiry from: H
Start Date: Immediate
Removal of existing wooden wall (close to collapse) which holds up a raised flower bed. Approx 1m tall and 6m long. Replace this wooden wall with a brick/block wall properly rendered and supported. E...
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Barkingside.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.
As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.
It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.
Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today