Bricklaying in Haringey

Compare Bricklaying Prices in Haringey

Home > General Building Projects > Bricklayers > Haringey

Bricklaying in Haringey

Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of the property.

 

This brick wall will demand foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into account. Depending on the current thickness of the exterior brickwork walls, they may require additional insulation. This is usually achieved by adding interior wall insulation like insulated plasterboard, or by adding a supplementary layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if any of the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.

 

In contrast to lots of beliefs, a bricklayer actually does more than laying of bricks. There's more to being a bricklayer than you can probably think of. A solitary bricklaying projects needs a wide variety of abilities. Let's have a look at these skills!

  • Utilizing damp resistant materials to secure foundations.
  • Spreading out mortar between joints and also applying them to act as a thick layer binding the bricks with each other in rows.
  • Reading as well as functioning from specs in addition to plans.
  • Dealing with brick-cutting makers.
  • Taking charge and taking care of cement blocks or bricks, clay blocks and the likes.
  • Construction of scaffolding - subject to ownership of some licenses in some states.

This is not simply an cosmetic decision, as coordinating with existing brickwork is potentially a condition of planning permission or building regulations in your area. We will provide up to 4 Bricklayers pros in your area, who will supply quotations for the job you want done. You'll get a home visit from specialists in Haringey that'll help you to choose the best Bricklayers for your home before carrying out the setup. Enter your postcode to start searching currently.

Average Bricklayers cost in Haringey

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Haringey, as reported by local LeadsDoWork members.

Bricklayers installation cost in Haringey 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in September 2024

Bricklayers Projects in Haringey in August 2024

0

Requests for quotations in Haringey in August 2024

0

Requests for Bricklayers quotations in Haringey in August 2024. 0% change from July 2024.

0

Requests for Bricklayers quotations in London County in August 2024. 0% change from July 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Haringey August 2024

Haringey

The London Borough of Haringey is a London borough in North London, classified by some definitions as part of Inner London, and by others as part of Outer London. It was created in 1965 by the amalgamation of three former boroughs. It shares borders with six other London boroughs. Clockwise from the north, they are: Enfield, Waltham Forest, Hackney, Islington, Camden, and Barnet. Haringey covers an area of more than 11 square miles (28.5 km2). The local authority is Haringey London Borough Council.

Based on population estimates from the middle of 2014, Haringey features a permanent population of about 267541 inhabitants. There are about 97101 homes in Haringey. Approximately 55 per cent of residents in Haringey reside in flats, apartments or maisonettes. The borough is characterised by some extreme contrasts. Locations in the west, such as Highgate, Muswell Hill and Crouch End are amongst the most prosperous in the country. In the east of the borough, however, some wards are classified as being among the most deprived ten per cent inside the nation.

Haringey is also a borough of contrasts geographically. The borough contains big locations of green space, which make up more than 25 per cent of its total area. Some of the more familiar nearby landmarks consist of Alexandra Palace, Bruce Castle, Jacksons Lane, Highpoint I and II, and Tottenham Hotspur Football Club.

Looking for Bricklayers in Haringey?

Get free quotes from local builders

Get free quotes

Bricklayers pros in Haringey

JM Fencing and Landscaping

89 review(s)
Based: in Farnham, GU10 1FD

Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening and Fencing. We pride ourselves in offering a prompt, efficient service and are always conscious of our customers needs. I alw...

Latest review

Sam L., RG14
5

Building work | Bricklaying in Newbury

Excellent - came on time, always very punctual. Did an excellent job, very tidy, cleaned up thoroughly afterwards. I wou...

J Alexander Building and Maintenance

1 review(s)
Based: in Barking, IG11 9JN

Latest review

G., IG6
4

Building work | Bricklaying in Ilford

He is very keen

Similar Customer Enquiries for Bricklayers in Haringey

23 Sep

Building work | Bricklaying

London - N11

Enquiry from: Adam W

Start Date: 1 to 3 months

warwick crt, ***, is a block of flats with pointing requirement to grd/1st/2nd floors. scaffolding will be required to front, one flank wall and partial rear, there are fire escape landing and stairs ...

Post a similar request >

20 Mar

Building work | Bricklaying

London - N22

Enquiry from: G

Start Date: Immediate

Home Owner Front top windows replacement and Bay windows replacement. Brick work is needed in order to rebuild the original layouts of windows and bay : Enlarge top windows and recreate sash box. ...

Post a similar request >

19 Mar

Building work | Bricklaying

Rickmansworth - WD3

Enquiry from: Drew M

Start Date: Immediate

repair of the top level of a rendered brick wall that blew of in storm eunace. are you the property owner: owner of the property property type: semi detached how much work would you say needs to be do...

Post a similar request >

17 Sep

Building work | Bricklaying

Rickmansworth - WD3

Enquiry from: Rajesh S

Start Date: Immediate

move brick pillar on front wall to widen driveway entrance. front wall is small in height. need to put a slight edge block on grass to reflect the wider drive. are you the property owner: owner of th...

Post a similar request >

08 Feb

Building work | Bricklaying

Hayes - UB3

Enquiry from: Samarawickrama S

Start Date: Immediate

Homeowner Please contact to appoint

Post a similar request >

07 Jun

Building work | Bricklaying

Hayes - UB3

Enquiry from: Sylvia G

Start Date: Immediate

Driveway and front garden wall needs replacing. Current wall stood at about 36 inches with a London shape. Are you the property owner: Tenant (with permission) Property Type: Semi detached How much w...

Post a similar request >

30 Sep

Building work | Bricklaying

Rickmansworth - WD3

Enquiry from: Malcolm R

Start Date: Immediate

Bricklaying 3 small garden walls on existing foundations - all materials supplied and on site Wall 1 - Low (21"x9"x21 bricks) wall of 6 facing brick courses and two backing block courses plus a cappi...

Post a similar request >

07 Apr

Building work | Bricklaying

Northwood - HA6

Enquiry from: Deepa P

Start Date: Immediate

Wall to front of property call to appoint

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Haringey

Get free, no-obligation quotes from 4 verified Builders working in Haringey.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

What is the ratio of sand and cement for bricklaying?

When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.

Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.

Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Placholder Image

Other Top Projects in Haringey

Are you a builder in Haringey?

We can help you get more Bricklayers work and boost your business.

Join today