Bricklaying in Chelmsford

Compare Bricklaying Prices in Chelmsford

Home > General Building Projects > Bricklayers > Chelmsford

Bricklaying in Chelmsford

Extensions will usually demand brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a brick wall with a couple of windows is put into the front or side of the house.

 

This brick wall requires foundations or lintel supports which might or might not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the outer brickwork walls, they'll require extra insulation. Normally, this is done with the addition of internal wall insulation like insulated plasterboard, or with the addition of another layer of brickwork to create a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the house.

 

As opposed to several ideas, a bricklayer actually does greater than laying of bricks. There's even more to being a bricklayer than you can probably think of. A single bricklaying tasks calls for a vast selection of abilities. Allow's look at these skills!

  • Utilizing wet resistant materials to seal foundations.
  • Spreading out mortar between joints as well as applying them to serve as a thick layer binding the bricks together in rows.
  • Checking out and also functioning from requirements as well as strategies.
  • Working with brick-cutting machines.
  • Taking charge and also caring for concrete blocks or bricks, clay blocks as well as the likes.
  • Building of scaffolding - based on belongings of some licenses in some states.

This is not merely an aesthetic choice, as complementing existing brickwork might be a condition of planning permission or building regulations in your area. We will offer approximately 4 Bricklayers pros locally, that will certainly supply quotes for the work you want done. You'll obtain a home visit from professionals in Chelmsford that'll help you to choose the ideal Bricklayers for your house before accomplishing the installment. Enter your postcode to start browsing currently.

Average Bricklayers cost in Chelmsford

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Chelmsford, as reported by local LeadsDoWork members.

Bricklayers installation cost in Chelmsford 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in November 2024

Bricklayers Projects in Chelmsford in October 2024

3,374

Requests for quotations in Chelmsford in October 2024

0

Requests for Bricklayers quotations in Chelmsford in October 2024. 0% change from September 2024.

0

Requests for Bricklayers quotations in Essex in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Chelmsford October 2024

Chelmsford

Chelmsford is among the UK's newest cities, just getting issued status in 2012 as part of the Queen's Diamond Jubilee festivities. Possessing a populace of just about 170,000 the Essex city was identified as the 8th finest place to live in the United Kingdom by Channel 4 programme Location, Location, Location. Look at quotations from trustworthy property improvement specialists in Chelmsford to ensure high quality.

Looking for Bricklayers in Chelmsford?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Chelmsford

23 May

Building work | Bricklaying

Chelmsford - CM3

Enquiry from: Alan B

Start Date: Immediate

two new brick walls approx five feet long by approx six feet high, and hang new iron gate to these walls , customer has got gate and fixing but bricks to be supplied ( i can get them delivered if pre...

Post a similar request >

12 May

Building work | Bricklaying

Chelmsford - CM1

Enquiry from: Kylie S

Start Date: Immediate

looking for a quotation to repoint brick walls to front and rear or property are you the property owner: owner of the property property type: detached how much work would you say needs to be done: med...

Post a similar request >

27 May

Building work | Bricklaying

Chelmsford - CM1

Enquiry from: Katherine T

Start Date: Immediate

brick up an in-set porchway and take out an internal, non load bearing wall to make the kitchen and utility room into one are you the property owner: owner of the property property type: terrace how m...

Post a similar request >

29 Oct

Building work | Bricklaying

Chelmsford - CM1

Enquiry from: LANA M

Start Date: Immediate

looking for someone to replace a damaged air brick at rear of first floor property property type: other how much work would you say needs to be done: minor works do you require the bricks to be suppli...

Post a similar request >

20 Feb

Building work | Bricklaying

Brentwood - CM13

Enquiry from: Tommy B

Start Date: Immediate

construction of a brickwork garden wall the length of approx. 12m are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do ...

Post a similar request >

25 Oct

Building work | Bricklaying

Sawbridgeworth - CM21

Enquiry from: JOSH R

Start Date: Less than one month

FOOTINGS TO BE DONE IN 9 INCH ENGINEERING BRICKWORK APPROXIMATELY 100 LINEAR METERS RANGING FROM 450 HEIGHT TO 1200 HEIGHT ,APPROXIMATELY 40 METERS AT 1200 ,20 METERS 500/700 , BALANCE IN 450/500 .

Post a similar request >

01 Sep

Building work | Bricklaying

Sawbridgeworth - CM21

Enquiry from: Josh R

Start Date: Immediate

set out and brick /block laying

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Chelmsford

Get free, no-obligation quotes from 4 verified Builders working in Chelmsford.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

Placholder Image

Other Top Projects in Chelmsford

Are you a builder in Chelmsford?

We can help you get more Bricklayers work and boost your business.

Join today