Bricklaying in Halstead

Get Bricklaying Prices in Halstead

Home > General Building Projects > Bricklayers > Halstead

Bricklaying in Halstead

Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with a couple of windows is added to the front or side of your home.

 

This brick wall will need foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they will likely require extra insulation. This is usually achieved with the addition of interior wall insulation like insulated plasterboard, or with the addition of an extra layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. In addition, if the walls are shared with a neighbour, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the home.

 

Contrary to many beliefs, a bricklayer really does greater than laying of blocks. There's more to being a bricklayer than you can most likely think of. A single bricklaying jobs needs a vast range of skills. Let's take a look at these abilities!

  • Utilizing wet resistant materials to seal foundations.
  • Spreading out mortar between joints and applying them to function as a thick layer binding the bricks together in rows.
  • Checking out as well as functioning from specs as well as plans.
  • Collaborating with brick-cutting devices.
  • Taking charge and taking care of cement blocks or bricks, clay blocks as well as the likes.
  • Building and construction of scaffolding - based on belongings of some licenses in some states.

This is not merely an visual decision, as coordinating with existing brickwork might be a condition of planning permission or building regulations in your area. We will offer up to 4 Bricklayers pros locally, that will certainly offer quotations for the job you desire done. You'll receive a property visit from specialists in Halstead that'll assist you to select the appropriate Bricklayers for your house prior to accomplishing the setup. Enter your postal code to begin browsing currently.

Average Bricklayers cost in Halstead

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Halstead, as reported by local LeadsDoWork members.

Bricklayers installation cost in Halstead 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in April 2025

Bricklayers Projects in Halstead in March 2025

284

Requests for quotations in Halstead in March 2025

0

Requests for Bricklayers quotations in Halstead in March 2025. 0% change from February 2025.

0

Requests for Bricklayers quotations in Essex in March 2025. 0% change from February 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Halstead March 2025

Halstead

Halstead is a town and civil parish located in Braintree District of Essex in England. The town is in close proximity to Colchester and Sudbury, in the Colne Valley. In accordance with the 2011 Census, Halstead has a permanent population of 11906. The town initially developed on the hill to the north of the river. The name Halstead is said to have originated from the Old English 'hald' (sanctuary, shelter, healthy) and 'stede' (site, place or farm), meaning 'healthy farm' 'safe place' or 'place of shelter'. The historical core of Halstead can be viewed on a walk up the market hill. There are a number of social, cultural and leisure options in Halstead. A river walk goes through the town from east to west, and just outside the town is Broaks Wood, a popular space for strolling owned by the Forestry Commission. Halstead Public Gardens were established in 1900 and is noted for its botanic exhibitions. Townsford Mill that spans the river at the bottom of the town houses the Antiques Centre, with thousands of interesting pieces ranging from clothing to household items. A historical society consistently holds regular monthly conferences, and a town museum attached to the town council offices holds some historic artefacts and different things confined to local interest. The Empire Theatre in Butler Road hosts occasional bingo nights. Halstead is also the home of Hume's Bakery, which opened in 1960, and continues to trade at the same store. Halstead's most well known football club is Halstead Town F.C. The club plays in the 10th tier of the English football league system, in the Eastern Counties Football League Division One. The town is additionally home to a cricket club and a rugby club that play regularly. For all of your home improvements, make sure to identify reputable specialists in Halstead to make certain of quality.

Looking for Bricklayers in Halstead?

Get free quotes from local builders

Get free quotes

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Halstead

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Halstead.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

Placholder Image

Other Top Projects in Halstead

Customer Reviews

Overall rating:


Halstead Bricklayers installers are rated 5 out of 5 based on 2 reviews of 18 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Halstead Bricklayers contractors

Are you a builder in Halstead?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today