Building work | Bricklaying
Hockley - SS5
Enquiry from: Norman W
Start Date: Immediate
a brick wall needs to be taken down and put up again as van has hit it
Extensions will require brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For most conversions, the garage door is infilled and a brick wall with a couple of windows is put into the front or side of the home.
This solid wall will require foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, so the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they might require extra insulation. This is usually achieved by adding interior wall insulation like insulated plasterboard, or by adding an additional layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. In addition, if any of the walls are shared with a neighbouring property, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the home.
In contrast to several beliefs, a bricklayer in fact does more than laying of bricks. There's more to being a bricklayer than you can possibly consider. A single bricklaying projects requires a large array of skills. Allow's look at these abilities!
This is not merely an visual choice, as matching existing brickwork is possibly a requirement of planning permission or building regulations in your area. We will give up to 4 Bricklayers pros in your area, that will supply quotes for the work you want done. You'll get a home visit from specialists in Hockley who'll help you to pick the best Bricklayers for your house before performing the installation. Enter your postal code to start looking currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Hockley in March 2025
Requests for Bricklayers quotations in Hockley in March 2025. 0% change from February 2025.
Requests for Bricklayers quotations in Essex in March 2025. 0% change from February 2025.
Hockley is a large town and also civil parish in Essex in the East of England located between Chelmsford as well as Southend-on-Sea, or, extra particularly, between Rayleigh and also Rochford. It pertained to prestige during the coming of the train in the 1890s and also at the 2001 census had a population of 13,616 people, lowering to 9,616 at the 2011 Census, many of whom commute to London. The parish of Hockley itself has a population of 8,909 (2001 census), while the metropolitan area faces the neighbouring parish of Hawkwell. Hockley train station serves the village.
Hockley - SS5
Enquiry from: Norman W
Start Date: Immediate
a brick wall needs to be taken down and put up again as van has hit it
Chelmsford - CM1
Enquiry from: Kylie S
Start Date: Immediate
looking for a quotation to repoint brick walls to front and rear or property are you the property owner: owner of the property property type: detached how much work would you say needs to be done: med...
Brentwood - CM13
Enquiry from: Tommy B
Start Date: Immediate
construction of a brickwork garden wall the length of approx. 12m are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do ...
Chelmsford - CM1
Enquiry from: Katherine T
Start Date: Immediate
brick up an in-set porchway and take out an internal, non load bearing wall to make the kitchen and utility room into one are you the property owner: owner of the property property type: terrace how m...
Chelmsford - CM1
Enquiry from: LANA M
Start Date: Immediate
looking for someone to replace a damaged air brick at rear of first floor property property type: other how much work would you say needs to be done: minor works do you require the bricks to be suppli...
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Hockley.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.
As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.
It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.
Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today