Bricklaying in Ealing

Discover Bricklaying Prices in Ealing

Home > General Building Projects > Bricklayers > Ealing

Bricklaying in Ealing

Extensions will usually demand brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a brick wall with a couple of windows is added to the front or side of the home.

 

This solid wall will need foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they may require supplemental insulation. This is usually achieved with the addition of interior wall insulation like insulated plasterboard, or by adding an additional layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbouring property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.

 

Contrary to lots of beliefs, a bricklayer actually does greater than laying of blocks. There's more to being a bricklayer than you can probably think of. A solitary bricklaying jobs requires a vast selection of abilities. Let's have a look at these abilities!

  • Using damp resistant materials to secure foundations.
  • Spreading mortar in between joints and using them to serve as a thick layer binding the blocks together in rows.
  • Reading and also working from requirements as well as strategies.
  • Working with brick-cutting makers.
  • Taking charge as well as taking care of concrete blocks or blocks, clay blocks and also the sort.
  • Building and construction of scaffolding - subject to belongings of some licenses in some states.

This is not only an aesthetic decision, as complementing existing brickwork might be a requirement of planning permission or building regulations in your area. We will supply approximately 4 Bricklayers pros locally, who will certainly offer quotations for the work you desire done. You'll get a home visit from experts in Ealing who'll aid you to choose the best Bricklayers for your home before carrying out the installment. Enter your postcode to begin searching now.

Average Bricklayers cost in Ealing

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Ealing, as reported by local LeadsDoWork members.

Bricklayers installation cost in Ealing 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in February 2025

Bricklayers Projects in Ealing in January 2025

0

Requests for quotations in Ealing in January 2025

0

Requests for Bricklayers quotations in Ealing in January 2025. 0% change from December 2024.

0

Requests for Bricklayers quotations in London County in January 2025. 0% change from December 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Ealing January 2025

Ealing

The London Borough of Ealing is a London Borough in west London, England, and forms a part of Outer London. The London borough was formed in 1965 by the merging the area of the Municipal Borough of Ealing, the Municipal Borough of Southall and also the Municipal Borough of Acton. The London Borough of Ealing borders the London Borough of Hillingdon to the west, the London Borough of Harrow as well as the London Borough of Brent to the north, the London Borough of Hammersmith and Fulham towards the east as well as the London Borough of Hounslow towards the south. It covers a total area of around 21.44 square miles.

As per population estimates from the middle of 2014, the borough includes a permanent population of around 342118 inhabitants. This makes it the 3rd biggest London Borough in population, and 11th biggest in size, covering part of west London and a small part of northwest London. Its administrative centre is Ealing Broadway. Other main centres include Acton, Greenford and Southall.

The town is served by numerous National Rail and London Underground stations. In addition to Brentford, the London Borough of Ealing is the setting for a lot of the action in Robert Rankin's trilogy comedic novels, The Brentford Trilogy, which presently contains six volumes. Ealing is also the primary setting for 'The Sarah Jane Adventures', being the place of Sarah Jane Smith's residence. Within the borough are two garden suburbs, Brentham Garden Suburb and Bedford Park.

Looking for Bricklayers in Ealing?

Get free quotes from local builders

Get free quotes

Bricklayers pros in Ealing

JM Fencing and Landscaping

89 review(s)
Based: in Farnham, GU10 1FD

Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening and Fencing. We pride ourselves in offering a prompt, efficient service and are always conscious of our customers needs. I alw...

Latest review

Sam L., RG14
5

Building work | Bricklaying in Newbury

Excellent - came on time, always very punctual. Did an excellent job, very tidy, cleaned up thoroughly afterwards. I wou...

Similar Customer Enquiries for Bricklayers in Ealing

21 Dec

Building work | Bricklaying

Southall - UB2

Enquiry from: Aurangzeb C

Start Date: Immediate

I have a brick wall to the side of my semi detached property "shared" with neighbor. It is approximately 8metres long and am looking for a rebuild of the wall or a portion to be rebuilt to a 1.5 metre...

Post a similar request >

09 Aug

Building work | Bricklaying

London - NW10

Enquiry from: James B

Start Date: 1 to 3 months

Great, so where are you looking to have the work done? Build Wall Supply skips in order to remove existing fencing. Approximately 40 meters long. Supply bricks and rest of the materials, Double brick...

Post a similar request >

19 Aug

Building work | Bricklaying

London - W5

Enquiry from: Mike P

Start Date: 1 to 3 months

1) Removing and reseating the top 3 courses of bricks on the second floor wall tops which include some arched red brick window supports approx. 20 linear metres 2) Repointing to approximately 100sqm ...

Post a similar request >

13 Feb

Building work | Bricklaying

London - W13

Enquiry from: Gordhan N

Start Date: Immediate

single storey side extension and rear double storey extension

Post a similar request >

29 Mar

Building work | Bricklaying

London - W5

Enquiry from: C

Start Date: Immediate

rebuild low brick wall in front garden and make concrete stand for wheelie bins.

Post a similar request >

19 Mar

Building work | Bricklaying

Rickmansworth - WD3

Enquiry from: Drew M

Start Date: Immediate

repair of the top level of a rendered brick wall that blew of in storm eunace. are you the property owner: owner of the property property type: semi detached how much work would you say needs to be do...

Post a similar request >

25 Feb

Building work | Bricklaying

Windsor - SL4

Enquiry from: Richard C

Start Date: Immediate

Bricklayers Lead Bricklayers Lead

new garden wall required to replace garden fence. 23m long x 2.3m high. mini digger access. other side of wall can be plain, due adjacent to commercial building. are you the property owner: owner of ...

Post a similar request >

23 Nov

Building work | Bricklaying

Gerrards Cross - SL9

Enquiry from: Kay B

Start Date: Immediate

new brick built wall between back yard with neighbouring yard requires new sheet metal security gate (solid sheet not railing, and narrow about 600mm to 700mm wide) to conform with right of way. total...

Post a similar request >

01 Oct

Building work | Bricklaying

Staines-upon-Thames - TW19

Enquiry from: Monica F

Start Date: Immediate

erection of right-side neighbouring single brick wall partitioning. are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job do...

Post a similar request >

08 Sep

Building work | Bricklaying

Windsor - SL4

Enquiry from: Murray H

Start Date: Immediate

job 1. take down and remove existing wall. replace with. 9" brick wall 12 ft long 4 ft height 1 pier on end .topped with brick on edge. heather's. approx 900 bricks. lay on existing good footing. job...

Post a similar request >

05 May

Building work | Bricklaying

Chalfont St. Giles - HP8

Enquiry from: Angus M

Start Date: Immediate

we are the main contractor on the project to demolish and rebuild the above. we have a requirement for a blockwork contractor within the next 10 days we would like to it local are you the property ow...

Post a similar request >

10 Oct

Building work | Bricklaying

Slough - SL2

Enquiry from: Nina H

Start Date: Immediate

various brick work needed are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to be supplied to...

Post a similar request >

17 Sep

Building work | Bricklaying

Rickmansworth - WD3

Enquiry from: Rajesh S

Start Date: Immediate

move brick pillar on front wall to widen driveway entrance. front wall is small in height. need to put a slight edge block on grass to reflect the wider drive. are you the property owner: owner of th...

Post a similar request >

11 Aug

Building work | Bricklaying

Gerrards Cross - SL9

Enquiry from: Matt K

Start Date: Immediate

Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Medium job

Post a similar request >

30 Sep

Building work | Bricklaying

Rickmansworth - WD3

Enquiry from: Malcolm R

Start Date: Immediate

Bricklaying 3 small garden walls on existing foundations - all materials supplied and on site Wall 1 - Low (21"x9"x21 bricks) wall of 6 facing brick courses and two backing block courses plus a cappi...

Post a similar request >

01 Jun

Building work | Bricklaying

Egham - TW20

Enquiry from: C G

Start Date: 1 to 3 months

Taking down a chimney and side wall of a grade 2 listed building and rebuilding it with a double brick wall and lime rendering it after... Time scale: 1-3 months

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Ealing

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Ealing.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Placholder Image

Other Top Projects in Ealing

Customer Reviews

Overall rating:


Ealing Bricklayers installers are rated 4.2 out of 5 based on 19 reviews of 122 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Ealing Bricklayers contractors

Are you a builder in Ealing?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today