Bricklaying in Sudbury

Obtain Bricklaying Prices in Sudbury

Home > General Building Projects > Bricklayers > Sudbury

Bricklaying in Sudbury

Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a solid wall with a couple of windows is put into the front or side of the home.

 

This solid wall requires foundations or lintel supports which might or might not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the exterior brickwork walls, they may require additional insulation. This is usually achieved by adding interior wall insulation like insulated plasterboard, or with the addition of an extra layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the home.

 

In contrast to lots of ideas, a bricklayer in fact does greater than laying of bricks. There's even more to being a bricklayer than you can possibly consider. A single bricklaying jobs needs a large array of abilities. Allow's take a look at these abilities!

  • Making use of damp resistant materials to seal foundations.
  • Spreading mortar in between joints and applying them to serve as a thick layer binding the bricks with each other in rows.
  • Reading and also working from specs in addition to plans.
  • Working with brick-cutting makers.
  • Taking charge and also caring for concrete blocks or bricks, clay bricks and also the likes.
  • Construction of scaffolding - based on possession of some licenses in some states.

This is not only an cosmetic choice, as matching existing brickwork could be a condition of planning permission or building regulations in your area. We will offer up to four Bricklayers pros in your area, who will certainly supply quotes for the work you want done. You'll receive a home visit from experts in Sudbury who'll help you to select the ideal Bricklayers for your house prior to carrying out the installment. Enter your postal code to start looking now.

Average Bricklayers cost in Sudbury

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Sudbury, as reported by local LeadsDoWork members.

Bricklayers installation cost in Sudbury 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in February 2025

Bricklayers Projects in Sudbury in January 2025

540

Requests for quotations in Sudbury in January 2025

0

Requests for Bricklayers quotations in Sudbury in January 2025. 0% change from December 2024.

0

Requests for Bricklayers quotations in Suffolk in January 2025. 0% change from December 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Sudbury January 2025

Sudbury

Sudbury is a little market community in the English county of Suffolk. It rests on the River Stour near the Essex boundary, as well as is 60 miles (97 km) north-east of London. According to the 2011 Census, the community has a long-term populace of 13,063. It is the largest town of Babergh area council, the city government area, and is stood for in the UK Parliament as component of the South Suffolk constituency. Sign of Sudbury as a settlement emerges from the end of the 8th century throughout the Anglo-Saxon period, and its market was initial established initially of the 11th century. Its fabric industries flourished over the course of the Late Middle Ages, the riches of which funded a lot of its structures as well as churches. The town came to be prominent for its art in the 18th century, being the birthplace of Thomas Gainsborough, whose landscapes used motivation to John Constable, an additional Suffolk painter of the bordering Stour Valley area. The 19th century observed the resulting the train with the opening of a station on the historical Stour Valley Railway, and Sudbury train station develops the existing terminus of the Gainsborough Line. During World War II, United States Army Airforce bombing planes functioned from RAF Sudbury. In the here and now day, Sudbury preserves its condition as a market town, holding a twice-weekly market in the community centre before the redundant St Peter's Church, which is currently a local community factor for occasions such as shows as well as exhibits. In sporting activity, the community has a semi-professional football club, A.F.C. Sudbury, which competes at the seventh degree of the football pyramid. For every one of your residence upgrades, make certain to use reliable professionals in Sudbury to make certain of quality.

Looking for Bricklayers in Sudbury?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Sudbury

29 Aug

Building work | Bricklaying

Sudbury - CO10

Enquiry from: John D

Start Date: Less than one month

I have a brick wall facing onto the road/pavement that needs replacing. I want to update it so the wall is higher than it was before but matches a neighbours wall. Are you the property owner: Owner of...

Post a similar request >

25 Oct

Building work | Bricklaying

Braintree - CM77

Enquiry from: Philip S

Start Date: Immediate

hi. we have a aluminium door and window frame sitting at ground level. consequently when it rains hard we get ingress. need the entire frame lifted by a brick or two to stop this. so remove frame. rem...

Post a similar request >

21 Jul

Building work | Bricklaying

Braintree - CM7

Enquiry from: Ammar C

Start Date: Immediate

Good Afternoon, We have a house located in Braintree. It’s garden wall is weakening. Bottom bricks of a wall are weakening most and making entire wall unstable. Currently a tenant is living in ...

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Sudbury

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Sudbury.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Placholder Image

Other Top Projects in Sudbury

Customer Reviews

Overall rating:


Sudbury Bricklayers installers are rated 5 out of 5 based on 2 reviews of 16 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Sudbury Bricklayers contractors
Garden wall construction with London Heather bricks in Crawley Published: 22/01/2025 Looking to complete a garden wall construction in Crawley? Learn about the materials, process, and cost-effective options for your bricklaying project. Read this article
Garden wall repair and repointing in West Bromwich Published: 23/11/2024 Repair of two garden walls and repointing of a third wall needed for a terrace home in West Bromwich. Includes supply of new bricks and waste removal. Learn more about the process and costs. Read this article
General maintenance and water damage repair in Downpatrick Published: 21/02/2025 Need general maintenance and water damage repair for an apartment in Downpatrick? Learn about the best repair methods and costs involved. Read this article

Are you a builder in Sudbury?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today