J Alexander Building and Maintenance
Based: in Barking, IG11 9JNLatest review
G., IG6
Building work | Bricklaying in Ilford
He is very keen
Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For some conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of the home.
This solid wall will demand foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the exterior brickwork walls, they will require supplemental insulation. This is usually done with the addition of internal wall insulation like insulated plasterboard, or with the addition of an additional layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. In addition, if any of the walls are shared with a neighbour's property, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.
Contrary to lots of ideas, a bricklayer actually does greater than laying of blocks. There's more to being a bricklayer than you can possibly think about. A single bricklaying tasks requires a large range of abilities. Allow's look at these abilities!
This is not just an aesthetic decision, as complementing existing brickwork could be a requirement of planning permission or building regulations in your area. We will offer approximately 4 Bricklayers pros in your area, that will certainly supply quotes for the job you want done. You'll obtain a property visit from professionals in Welling that'll assist you to choose the best Bricklayers for your house before executing the installment. Enter your postal code to start searching currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Welling in March 2025
Requests for Bricklayers quotations in Welling in March 2025. 0% change from February 2025.
Requests for Bricklayers quotations in Kent in March 2025. 0% change from February 2025.
The London borough district of Welling can be located on the way to the South East part of the capital and has recently been subject to a period of redevelopment and upgrade. This means that there is a collection of both contemporary and also traditional houses. For the home developments you may be looking at within the Welling region, make sure to only employ respected tradespeople to ensure a great finish.
He is very keen
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Welling.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.
Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!
• Using damp resistant materials to seal foundations.
• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.
• Reading and working from specifications as well as plans.
• Working with brick-cutting machines.
• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.
• Construction of scaffolding - subject to possession of some licenses in some states.
A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.
A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:
• Ability to work at heights and outdoors
• Enjoy practical work
• Technical aptitude
• Good hand-eye coordination
• Independent and yet a team player too
• Top physical fitness
• Attitude and attendance.
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today