Bricklaying in Merton

Get Bricklaying Prices in Merton

Home > General Building Projects > Bricklayers > Merton

Bricklaying in Merton

Extensions will usually demand brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with a couple of windows is added to the front or side of your home.

 

This brick wall requires foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, so the new brickwork wall will need to take this into account. Depending on the current thickness of the exterior brickwork walls, they'll require extra insulation. This is usually achieved with the addition of internal wall insulation like insulated plasterboard, or with the addition of another layer of brickwork to create a cavity wall. These options are again dependent on the existing garage foundations. Furthermore, if the walls are shared with a neighbouring property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.

 

Unlike lots of beliefs, a bricklayer in fact does more than laying of blocks. There's more to being a bricklayer than you can possibly consider. A single bricklaying tasks requires a wide selection of skills. Allow's have a look at these abilities!

  • Using wet resistant materials to seal structures.
  • Spreading mortar between joints and also using them to act as a thick layer binding the blocks together in rows.
  • Checking out and functioning from specs along with strategies.
  • Dealing with brick-cutting makers.
  • Taking charge and also taking care of concrete blocks or bricks, clay bricks and the likes.
  • Building and construction of scaffolding - subject to ownership of some licenses in some states.

This is not simply an visual choice, as coordinating with existing brickwork is possibly a requirement of planning permission or building regulations in your area. We will supply approximately 4 Bricklayers pros in your area, who will certainly use quotations for the job you desire done. You'll obtain a property visit from specialists in Merton that'll assist you to choose the right Bricklayers for your home before performing the installation. Enter your postal code to begin searching currently.

Average Bricklayers cost in Merton

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Merton, as reported by local LeadsDoWork members.

Bricklayers installation cost in Merton 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in November 2024

Bricklayers Projects in Merton in October 2024

0

Requests for quotations in Merton in October 2024

0

Requests for Bricklayers quotations in Merton in October 2024. 0% change from September 2024.

0

Requests for Bricklayers quotations in London County in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Merton October 2024

Merton

The London Borough of Merton is a borough in south-west London, England. The borough was formed under the London Government Act 1963 in 1965 by the merger of the Municipal Borough of Mitcham, the Municipal Borough of Wimbledon and also the Merton and Morden Urban District, all formerly within Surrey. The borough derives its name from the historic parish of Merton, which was centred on the area now referred to as South Wimbledon. The local authority is Merton London Borough Council.

As outlined by population estimates made during 2014, the borough features a permanent population of about 203515 inhabitants. The borough is also served by numerous London Tramlink stops from Wimbledon, which goes to Croydon, New Addington, Elmers End and Beckenham. It is the only London Borough which has tube, rail and tram services.

The key industrial centres in Merton are Mitcham, Morden and Wimbledon, of which Wimbledon is the biggest. Other smaller sized centres consist of Raynes Park, Colliers Wood, South Wimbledon, Wimbledon Park and Pollards Hill. Every year, Wimbledon, one of the 4 tennis Grand Slam tournaments, is held at the All England Lawn Tennis and Croquet Club in Church Road Wimbledon. The occasion occurs over a fortnight at the end of June and start of July and it's the largest annual sporting occasion to take place in the United Kingdom, attracting over 200000 guests during the Wimbledon fortnight.

Looking for Bricklayers in Merton?

Get free quotes from local builders

Get free quotes

Bricklayers pros in Merton

JM Fencing and Landscaping

89 review(s)
Based: in Farnham, GU10 1FD

Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening and Fencing. We pride ourselves in offering a prompt, efficient service and are always conscious of our customers needs. I alw...

Latest review

Sam L., RG14
5

Building work | Bricklaying in Newbury

Excellent - came on time, always very punctual. Did an excellent job, very tidy, cleaned up thoroughly afterwards. I wou...

TC Construction

3 review(s)
Based: in Surrey, SM7 3HG

Are you looking for a driveway that offers something different? With expertise in high quality surfacing, TC Construction can help you get the look that you want. Domestic and commercial asphalting service With more than 30 years of experience,...

Latest review

Brian C., KT4
4

Building work | Bricklaying in Worcester Park

They were quick to communicate and came to look at the job quickly which is great

Similar Customer Enquiries for Bricklayers in Merton

13 Oct

Building work | Bricklaying

London - SW19

Enquiry from: Rado P

Start Date: 1 to 3 months

100 sq m of weather struck pointing,the joints have been cleaned already at 20,30mm depth. what type of work do you need to have done: brick work are you the property owner: owner of the property do y...

Post a similar request >

21 Apr

Building work | Bricklaying

Sutton - SM3

Enquiry from: Saima R

Start Date: 1 to 3 months

customer in the sutton area made an enquiry a couple of projects including building maintenance.call anytime and arrange an appointment to discuss. below is some details about this project: are you th...

Post a similar request >

23 Mar

Building work | Bricklaying

London - SW16

Enquiry from: Mohamed H

Start Date: Immediate

removal of a load bearing wall to create a larger kitchen/diner and a 4m hole to be created in garden wall to accommodate bi fold doors. are you the property owner: owner of the property property type...

Post a similar request >

05 Dec

Building work | Bricklaying

Thornton Heath - CR7

Enquiry from: MYRNA K

Start Date: Immediate

are you the property owner: owner of the property property type: semi detached how many bedrooms do you have: 1-2 rooms other forms: building maintenance agreed to receive quotes for selected product...

Post a similar request >

27 May

Building work | Bricklaying

Sutton - SM3

Enquiry from: Paolo M

Start Date: 1 to 3 months

I am planning to build a brick workshop at the back of the garden of my new house in Cheam (SM3). The garden is quite long and about 6m wide so I believe that to avoid the need for planning permiss...

Post a similar request >

25 May

Building work | Bricklaying

London - SW16

Enquiry from: Justin P

Start Date: Immediate

Our front garden wall requires rebuilding, it is short 9” thick, we would like a quote for both of the following options; option 1 rebuilt, rendered, painted white with two sets of black railings in...

Post a similar request >

24 Feb

Building work | Bricklaying

Hounslow - TW4

Enquiry from: Anthony B

Start Date: Immediate

rebuild wall which was blown down by last weekend’s storm. 6.5m long x 2.7m height two brick thick. are you the property owner: owner of the property property type: semi detached how much work would...

Post a similar request >

03 Oct

Building work | Bricklaying

Hounslow - TW5

Enquiry from: Rizwan S

Start Date: Immediate

micro-digger hire for a day cost on it's own and also with operator. are you the property owner: owner of the property property type: semi detached what type of work do you need to have done: brick wo...

Post a similar request >

03 Sep

Building work | Bricklaying

Feltham - TW13

Enquiry from: Mario M

Start Date: Immediate

to build an extension 6m x 6m with a roof lantern and bi fold doors. are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: mediu...

Post a similar request >

21 Dec

Building work | Bricklaying

Southall - UB2

Enquiry from: Aurangzeb C

Start Date: Immediate

I have a brick wall to the side of my semi detached property "shared" with neighbor. It is approximately 8metres long and am looking for a rebuild of the wall or a portion to be rebuilt to a 1.5 metre...

Post a similar request >

08 Feb

Building work | Bricklaying

Hayes - UB3

Enquiry from: Samarawickrama S

Start Date: Immediate

Homeowner Please contact to appoint

Post a similar request >

07 Jun

Building work | Bricklaying

Hayes - UB3

Enquiry from: Sylvia G

Start Date: Immediate

Driveway and front garden wall needs replacing. Current wall stood at about 36 inches with a London shape. Are you the property owner: Tenant (with permission) Property Type: Semi detached How much w...

Post a similar request >

30 Jan

Building work | Bricklaying

Sunbury-on-Thames - TW16

Enquiry from: DOSKAR J

Start Date: 1 to 3 months

Build front wall and electric gate Are you the property owner: Owner of the property Property Type: Detached How much work would you say needs to be done: Medium job Do you require the bricks to be su...

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Merton

Get free, no-obligation quotes from 4 verified Builders working in Merton.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

Placholder Image

Other Top Projects in Merton

Are you a builder in Merton?

We can help you get more Bricklayers work and boost your business.

Join today