Building work | Bricklaying
Caernarfon - LL55
Enquiry from: Gail S
Start Date: Immediate
New brick work to new steel work to front of property
Extensions will require brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For most conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of the property.
This solid wall requires foundations or lintel supports which might or might not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the exterior brickwork walls, they might require additional insulation. Normally, this is achieved by adding internal wall insulation like insulated plasterboard, or by adding a supplementary layer of brickwork to create a cavity wall. These options are again dependent on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbouring property, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.
Unlike numerous ideas, a bricklayer really does greater than laying of blocks. There's even more to being a bricklayer than you can probably think about. A solitary bricklaying jobs requires a broad range of skills. Let's take a look at these abilities!
This is not just an aesthetic choice, as coordinating with existing brickwork is possibly a condition of planning permission or building regulations in your area. We will offer as much as 4 Bricklayers pros in your area, who will certainly use quotations for the job you desire done. You'll get a property visit from experts in Wales that'll aid you to pick the ideal Bricklayers for your residence before carrying out the setup. Enter your postal code to begin looking now.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Wales in December 2024
Requests for Bricklayers quotations in Wales in December 2024. 0% change from November 2024.
Requests for Bricklayers quotations in United Kingdom in December 2024. 0% change from November 2024.
Caernarfon - LL55
Enquiry from: Gail S
Start Date: Immediate
New brick work to new steel work to front of property
Whitland - SA34
Enquiry from: Charles M
Start Date: 1 to 3 months
customer in the whitland area made an enquiry a couple of projects including bricklaying.call anytime and arrange an appointment to discuss. below is some details about this project: are you the prope...
Cardiff - CF24
Enquiry from: Rhys H
Start Date: Immediate
I need a base for a greenhouse to be secured with. I have placed a deposit on a greenhouse house with a company called Rhino. Prior to it being built it needs a base to secure it to the ground. I nee...
Merthyr Tydfil - CF48
Enquiry from: Michael Q
Start Date: Immediate
repair/reset brick gate post and reset gate hatch area = small gate entrance area are you the property owner: owner of the property property type: semi detached how much work would you say needs to be...
Newport - NP20
Enquiry from: Clare G
Start Date: Immediate
re pointing of side of house due to driving rain leaking through. are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: small job...
Cardiff - CF5
Enquiry from: Barry S
Start Date: 1 to 3 months
customer in cardiff area has requested that we arrange quotes for their building maintenance project.mr are considering various options and would like to discuss with a builder directly.please call to...
Neath - SA11
Enquiry from: Steven D
Start Date: Immediate
i want around 400 blocks laid on a single storey extension are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: small job do you...
Prestatyn - LL19
Enquiry from: WR J
Start Date: Immediate
mount metal bbq with flue in 2x2 meter wall to be erected on existing patio area do you require the bricks to be supplied too: yes are you the property owner: owner of the property property type: deta...
Holyhead - LL65
Enquiry from: John S
Start Date: Immediate
breeze block wall, base is soil are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: small job do you require the bricks to be ...
Cwmbran - NP44
Enquiry from: Philip P
Start Date: 1 to 3 months
door from garage to house. partition wall taken down. fitted wardrobe built. kitchen fitted. are you the property owner: owner of the property property type: semi detached what type of work do you nee...
Aberdare - CF44
Enquiry from: Jason L
Start Date: Immediate
had welder to secure. balcony gate to wall but the bricks were lose and broke up need bricks repaired under patio doors are you the property owner: owner of the property property type: other how much ...
Newtown - SY16
Enquiry from: Miles W
Start Date: Immediate
i need a doorway blocking up, a new larger doorway created, double door fitted and made good. are you the property owner: owner of the property property type: detached how much work would you say nee...
Port Talbot - SA12
Enquiry from: RHIANN H
Start Date: Immediate
repair wall in back garden or knockdown and completely rebuild. additional wall to be built opposite. are you the property owner: tenant (with permission) property type: terrace how much work would y...
Neath - SA10
Enquiry from: Liz H
Start Date: Immediate
removal of old conservatory air conditioning unit and re-bricking after removal are you the property owner: owner of the property property type: detached how much work would you say needs to be done: ...
Barry - CF62
Enquiry from: David W
Start Date: Immediate
i would like to get the front of my terraced house to look like it’s original look. the bricks have been painted over so i was thinking of using brick slips to achieve this. what i am looking for ...
Cardiff - CF3
Enquiry from: Sarah M
Start Date: Less than one month
customer in the cardiff area made an enquiry a couple of projects including building maintenance.call anytime and arrange an appointment to discuss. below is some details about this project: are you t...
Carmarthen - SA33
Enquiry from: Yvonne S
Start Date: Immediate
rebuild front driveway wall are you the property owner: owner of the property how much work would you say needs to be done: medium job do you require the bricks to be supplied too: no property type: ...
Penarth, Dinas Powys - CF64
Enquiry from: Terry H
Start Date: Immediate
wall at the side of the front entrance re-built. re-do pebbledash on front of the house and paint. are you the property owner: owner of the property property type: semi detached how much work would y...
Barry - CF62
Enquiry from: Matt H
Start Date: Immediate
single story build at rear approx 25 ft long340 cavity with patio doors in the middle with a 5ft window each side both ends to be keyed into existing wall are you the property owner: owner of the prop...
Pontypridd - CF37
Enquiry from: Ashley B
Start Date: 1 to 3 months
i have an extension kitchen/bathroom. i have found that a wooden beam at the back of the extension has rotted. i would like a price to repair/replace are you the property owner: owner of the property ...
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Wales.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.
Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.
Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today