Building work | Bricklaying
Tredegar - NP22
Enquiry from: Paul F
Start Date: Immediate
Wants a front wall call to appoint
Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with a couple of windows is put into the front or side of the home.
This solid wall will demand foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they will likely require extra insulation. Normally, this is done with the addition of interior wall insulation like insulated plasterboard, or by adding an extra layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbouring property, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.
As opposed to many beliefs, a bricklayer in fact does greater than laying of bricks. There's more to being a bricklayer than you can probably think of. A single bricklaying projects calls for a vast selection of skills. Allow's look at these abilities!
This is not simply an aesthetic decision, as matching existing brickwork is potentially a condition of planning permission or building regulations in your area. We will provide as much as 4 Bricklayers pros locally, who will certainly provide quotations for the job you desire done. You'll obtain a home visit from professionals in Tredegar that'll assist you to choose the best Bricklayers for your house before accomplishing the setup. Enter your postcode to start searching now.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Tredegar in March 2025
Requests for Bricklayers quotations in Tredegar in March 2025. 0% change from February 2025.
Requests for Bricklayers quotations in Gwent in March 2025. 0% change from February 2025.
The community and neighborhood of Tredegar remains on the Sirhowy River in the county Borough of Blaenau Gwent in southeast Wales. Located within the historic boundaries of Monmouthshire, it became an early centre of the Industrial Revolution in South Wales. According to the 2011 Census, Tredegar has a long-term population of around 15,103. The town's name can be interpreted as 'tref deg erw' which is believed to translate as 'ten acres ranch'. From a very early time, the community's advancement was helped by its closeness to several natural deposits had within the Sirhowy Valley, such as iron ore, coal for the manufacturing of coke, power from the fast-flowing Sirhowy River and also wood for buildings, pit props and also fuel. Thus, the Sirhowy Valley was a well established woody valley by 1700, including a number of ranches and also a couple of iron jobs. The official growth of iron works occurred from the center of the 18th century, when The Sirhowy Iron Works was built in 1750. Over time, it was offered and acquired to various other proprietors, that created it as the very first coal discharged furnace, which demanded utilizing males to dig coal. Various other firms were quickly to comply with, as shown by the Tredegar Iron Company, established in 1800. There are a variety of spots found in the town. Erected in 1818 as your home of Samuel Homfray, whose Iron and Coal Works were the leading neighborhood companies, Bedwellty House is a Grade II listed residence as well as gardens. The Town Clock is one more noteworthy function of the community, which controls the horizon of the southerly component of the community centre. For all of your residence upgrades, make certain to take advantage of reliable specialists in Tredegar to make sure of quality.
Tredegar - NP22
Enquiry from: Paul F
Start Date: Immediate
Wants a front wall call to appoint
Merthyr Tydfil - CF48
Enquiry from: Michael Q
Start Date: Immediate
repair/reset brick gate post and reset gate hatch area = small gate entrance area are you the property owner: owner of the property property type: semi detached how much work would you say needs to be...
Aberdare - CF44
Enquiry from: Jason L
Start Date: Immediate
had welder to secure. balcony gate to wall but the bricks were lose and broke up need bricks repaired under patio doors are you the property owner: owner of the property property type: other how much ...
Pontypridd - CF37
Enquiry from: Ashley B
Start Date: 1 to 3 months
i have an extension kitchen/bathroom. i have found that a wooden beam at the back of the extension has rotted. i would like a price to repair/replace are you the property owner: owner of the property ...
Pontypridd - CF37
Enquiry from: Steve D
Start Date: Immediate
built walls, steps and path in the sloping garden are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: medium job do you require...
Pontypridd - CF38
Enquiry from: Bert N
Start Date: 1 to 3 months
To build a small attached extension to house Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the b...
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Tredegar.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today