Bricklaying in Cwmbran

Obtain Bricklaying Prices in Cwmbran

Home > General Building Projects > Bricklayers > Cwmbran

Bricklaying in Cwmbran

Extensions will usually demand brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a solid wall with a couple of windows is put into the front or side of the home.

 

This solid wall requires foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the external brickwork walls, they will likely require additional insulation. Normally, this is done with the addition of internal wall insulation like insulated plasterboard, or with the addition of a supplementary layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. In addition, if the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.

 

Contrary to many ideas, a bricklayer in fact does greater than laying of blocks. There's even more to being a bricklayer than you can most likely think about. A solitary bricklaying projects requires a large range of skills. Allow's take a look at these abilities!

  • Using wet resistant materials to secure foundations.
  • Spreading out mortar in between joints and applying them to act as a thick layer binding the blocks with each other in rows.
  • Reviewing as well as working from specifications in addition to strategies.
  • Dealing with brick-cutting machines.
  • Taking charge as well as caring for cement blocks or blocks, clay blocks and the likes.
  • Building of scaffolding - subject to property of some licenses in some states.

This is not only an cosmetic decision, as complementing existing brickwork is potentially a requirement of planning permission or building regulations in your area. We will offer up to 4 Bricklayers pros locally, that will provide quotations for the work you desire done. You'll obtain a property visit from professionals in Cwmbran that'll assist you to select the right Bricklayers for your house prior to executing the setup. Enter your postal code to start looking currently.

Average Bricklayers cost in Cwmbran

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Cwmbran, as reported by local LeadsDoWork members.

Bricklayers installation cost in Cwmbran 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in January 2025

Bricklayers Projects in Cwmbran in December 2024

3,217

Requests for quotations in Cwmbran in December 2024

0

Requests for Bricklayers quotations in Cwmbran in December 2024. 0% change from December 2024.

0

Requests for Bricklayers quotations in Gwent in December 2024. 0% change from December 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Cwmbran December 2024

Cwmbran

Cwmbran is a new town in Wales, accompanied by a populace of 47,254. This will make it the sixth biggest urban region within Wales and covers around 3,000 acres of land. With plenty of modern day housing it's crucial that you keep property value. The easiest way to do this is simply by checking quotes from local experts in the region for house improvements you could be considering for your Cwmbran household.

Looking for Bricklayers in Cwmbran?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Cwmbran

13 Jul

Building work | Bricklaying

Cwmbran - NP44

Enquiry from: Philip P

Start Date: 1 to 3 months

door from garage to house. partition wall taken down. fitted wardrobe built. kitchen fitted. are you the property owner: owner of the property property type: semi detached what type of work do you nee...

Post a similar request >

14 Aug

Building work | Bricklaying

Cwmbran - NP44

Enquiry from: Terry B

Start Date: Immediate

base for a 8'x6' greenhouse on existing concrete hardstanding approx 8" high using grey brick already on site. this is to make the internal height suitable for me (@ 6'2") without having to bend when ...

Post a similar request >

27 Apr

Building work | Bricklaying

Cwmbran - NP44

Enquiry from: Paz P

Start Date: Immediate

Still assessing the work involved in our extension, however majority of the work required is blockwork. Approx. 120m2 of cavity work (plus foundation block work) to include both skins/insulation et...

Post a similar request >

01 Aug

Building work | Bricklaying

Cardiff - CF5

Enquiry from: Barry S

Start Date: 1 to 3 months

customer in cardiff area has requested that we arrange quotes for their building maintenance project.mr are considering various options and would like to discuss with a builder directly.please call to...

Post a similar request >

10 May

Building work | Bricklaying

Pontypridd - CF37

Enquiry from: Ashley B

Start Date: 1 to 3 months

i have an extension kitchen/bathroom. i have found that a wooden beam at the back of the extension has rotted. i would like a price to repair/replace are you the property owner: owner of the property ...

Post a similar request >

14 Apr

Building work | Bricklaying

Pontypridd - CF37

Enquiry from: Steve D

Start Date: Immediate

built walls, steps and path in the sloping garden are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: medium job do you require...

Post a similar request >

01 Apr

Building work | Bricklaying

Cardiff - CF5

Enquiry from: Michelle C

Start Date: Immediate

a wooden shed knocked down and replaced with brick length of the side of house to the end of garden. door at front, double on side. are you the property owner: owner of the property property type: ter...

Post a similar request >

20 Feb

Building work | Bricklaying

Caerphilly - CF83

Enquiry from: COLIN Y

Start Date: Less than one month

repair a brick wall Are you the property owner: Owner of the property Property Type: Terrace How much work would you say needs to be done: Small job Do you require the bricks to be supplied too: No Ti...

Post a similar request >

09 Jun

Building work | Bricklaying

Pontypridd - CF38

Enquiry from: Bert N

Start Date: 1 to 3 months

To build a small attached extension to house Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the b...

Post a similar request >

13 Dec

Building work | Bricklaying

Ebbw Vale - NP23

Enquiry from: Graham G

Start Date: Immediate

Pine end pointing

Post a similar request >

07 Apr

Building work | Bricklaying

Tredegar - NP22

Enquiry from: Paul F

Start Date: Immediate

Wants a front wall call to appoint

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Cwmbran

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Cwmbran.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

Do bricklayers need a license?

Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.

As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.

It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.

Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Placholder Image

Other Top Projects in Cwmbran

Customer Reviews

Overall rating:


Cwmbran Bricklayers installers are rated 5 out of 5 based on 1 reviews of 21 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Cwmbran Bricklayers contractors

Are you a builder in Cwmbran?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today