Bricklaying in Bridgend

Get Bricklaying Prices in Bridgend

Home > General Building Projects > Bricklayers > Bridgend

Bricklaying in Bridgend

Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For some conversions, the garage door is infilled and a solid wall with a couple of windows is put into the front or side of the property.

 

This brick wall will require foundations or lintel supports which might or might not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the external brickwork walls, they will likely require extra insulation. This is usually done with the addition of interior wall insulation like insulated plasterboard, or by adding an additional layer of brickwork to create a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.

 

Contrary to lots of ideas, a bricklayer in fact does more than laying of bricks. There's even more to being a bricklayer than you can most likely consider. A solitary bricklaying jobs requires a vast range of abilities. Let's look at these abilities!

  • Making use of wet resistant materials to secure structures.
  • Spreading out mortar between joints as well as applying them to serve as a thick layer binding the bricks with each other in rows.
  • Reading as well as working from specs as well as strategies.
  • Dealing with brick-cutting makers.
  • Taking charge and also taking care of concrete blocks or bricks, clay bricks and the likes.
  • Building and construction of scaffolding - subject to ownership of some licenses in some states.

This is not merely an aesthetic decision, as matching existing brickwork could be a requirement of planning permission or building regulations in your area. We will provide as much as 4 Bricklayers pros locally, that will provide quotations for the work you want done. You'll obtain a property visit from professionals in Bridgend that'll aid you to pick the ideal Bricklayers for your home prior to executing the installation. Enter your postcode to start looking now.

Average Bricklayers cost in Bridgend

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Bridgend, as reported by local LeadsDoWork members.

Bricklayers installation cost in Bridgend 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in January 2025

Bricklayers Projects in Bridgend in December 2024

1,359

Requests for quotations in Bridgend in December 2024

0

Requests for Bricklayers quotations in Bridgend in December 2024. 0% change from December 2024.

0

Requests for Bricklayers quotations in Mid Glamorgan in December 2024. 0% change from December 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Bridgend December 2024

Bridgend

Bridgend is a town in the historical county of Glamorgan, which includes a populace of 39,429. The Welsh town has seen lots of improvement recently along with a 1,500-home sustainable village is expected to be built imminently. If you're considering any home developments in the future, be certain to only work with vetted professionals from the area to guarantee the very best price and high quality finish.

Looking for Bricklayers in Bridgend?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Bridgend

22 Apr

Building work | Bricklaying

Bridgend - CF31

Enquiry from: Simon R

Start Date: Immediate

block work retaining wall, blocks laid flat. stone bricks to line existing wall. are you the property owner: owner of the property property type: detached how much work would you say needs to be done...

Post a similar request >

02 Apr

Building work | Bricklaying

Bridgend - CF31

Enquiry from: Des Q

Start Date: 1 to 3 months

customer requested quotes for bricklaying from a builder around bridgend. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below ...

Post a similar request >

09 Oct

Building work | Bricklaying

Bridgend - CF31

Enquiry from: THOA T

Start Date: Immediate

brick layer needed for rebuild of a new chimney are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: medium job do you require the bri...

Post a similar request >

27 Apr

Building work | Bricklaying

Bridgend - CF31

Enquiry from: Wayne W

Start Date: Immediate

Demolish and rebuild garage and hardstand

Post a similar request >

01 Jun

Building work | Bricklaying

Bridgend - CF31

Enquiry from: John O

Start Date: Immediate

Customer would like a garden wall built and some slabs laying.

Post a similar request >

06 Sep

Building work | Bricklaying

Bridgend - CF35

Enquiry from: O

Start Date: Immediate

Kitchen to be built 3m X 4m. Concreat blocks. Are you the property owner: Owner of the property Property Type: Terrace How much work would you say needs to be done: Medium job Do you require the brick...

Post a similar request >

24 Jul

Building work | Bricklaying

Neath - SA11

Enquiry from: Steven D

Start Date: Immediate

i want around 400 blocks laid on a single storey extension are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: small job do you...

Post a similar request >

24 Feb

Building work | Bricklaying

Port Talbot - SA12

Enquiry from: RHIANN H

Start Date: Immediate

repair wall in back garden or knockdown and completely rebuild. additional wall to be built opposite. are you the property owner: tenant (with permission) property type: terrace how much work would y...

Post a similar request >

03 Apr

Building work | Bricklaying

Neath - SA11

Enquiry from: Graham D

Start Date: Immediate

Replace old walls in the front garden Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Medium job Do you require the bricks ...

Post a similar request >

05 Jun

Building work | Bricklaying

Neath - SA11

Enquiry from: Gary C

Start Date: Immediate

We need the height of a red block wall increased by about 5 blocks to provide privacy between us and the neighbours. Will need to remove and replace screen blocks on top. Length about 15 metres. Can s...

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Bridgend

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Bridgend.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Do bricklayers need a license?

Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.

As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.

It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.

Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.

Placholder Image

Other Top Projects in Bridgend

Customer Reviews

Overall rating:


Bridgend Bricklayers installers are rated 0 out of 5 based on 0 reviews of 19 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Bridgend Bricklayers contractors

Are you a builder in Bridgend?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today