Bricklaying in Newcastle-under-lyme

Request Bricklaying Prices in Newcastle-under-lyme

Home > General Building Projects > Bricklayers > Newcastle-under-lyme

Bricklaying in Newcastle-under-lyme

Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For some conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of the property.

 

This solid wall requires foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, so the new brickwork wall will need to take this into account. Depending on the current thickness of the exterior brickwork walls, they might require additional insulation. This is usually achieved by adding internal wall insulation like insulated plasterboard, or by adding an additional layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbouring property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.

 

Unlike many ideas, a bricklayer in fact does more than laying of bricks. There's even more to being a bricklayer than you can probably think of. A solitary bricklaying jobs calls for a vast variety of skills. Let's look at these skills!

  • Using moist resistant materials to seal structures.
  • Spreading mortar in between joints as well as using them to act as a thick layer binding the blocks together in rows.
  • Reading and working from specs as well as plans.
  • Working with brick-cutting makers.
  • Taking charge as well as taking care of cement blocks or bricks, clay bricks as well as the sort.
  • Building of scaffolding - based on possession of some licenses in some states.

This is not merely an aesthetic choice, as coordinating with existing brickwork could be a condition of planning permission or building regulations in your area. We will offer as much as four Bricklayers pros locally, that will supply quotes for the work you desire done. You'll obtain a property visit from professionals in Newcastle-under-lyme that'll assist you to select the appropriate Bricklayers for your home before carrying out the setup. Enter your postcode to start browsing now.

Average Bricklayers cost in Newcastle-under-lyme

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Newcastle-under-lyme, as reported by local LeadsDoWork members.

Bricklayers installation cost in Newcastle-under-lyme 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in September 2024

Bricklayers Projects in Newcastle-under-lyme in August 2024

4,062

Requests for quotations in Newcastle-under-lyme in August 2024

0

Requests for Bricklayers quotations in Newcastle-under-lyme in August 2024. 0% change from July 2024.

0

Requests for Bricklayers quotations in Staffordshire in August 2024. 0% change from July 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Newcastle-under-lyme August 2024

Newcastle-under-lyme

The market town of Newcastle-Upon-Lyme in Staffordshire has a populace of 73,944, not to be mistaken for the city of Newcastle-Upon-Tyne. The town can be found in the direction of the East of England in the West Midlands region and it has various homes, from traditional to contemporary. For the enhancements you wish to make to your Newcastle property or home, always use respectable experts to find the best finish that will add the most value.

Looking for Bricklayers in Newcastle-under-lyme?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Newcastle-under-lyme

05 Sep

Building work | Bricklaying

Newcastle - ST5

Enquiry from: Andrea F

Start Date: 1 to 3 months

Homeowner Please contact to appoint Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the bricks to...

Post a similar request >

27 Apr

Building work | Bricklaying

Stoke-on-Trent - ST9

Enquiry from: Steven H

Start Date: Immediate

i need a builder to build a single storey extension are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require t...

Post a similar request >

24 Jan

Building work | Bricklaying

Crewe - CW3

Enquiry from: John C

Start Date: Immediate

Bricklayers Lead

Building brick small inner porch wall 31 inches wide X 39 inches high wall beneath. Have bricks and mortar to hand.

Post a similar request >

10 Mar

Building work | Bricklaying

Stoke-on-Trent - ST1

Enquiry from: Chris E

Start Date: 1 to 3 months

Bricklayers Lead

raking out and pointing, external house wall are you the property owner: relative of owner property type: terrace what type of work do you need to have done: brick work do you have the materials you n...

Post a similar request >

15 Jan

Building work | Bricklaying

Stoke-on-Trent - ST1

Enquiry from: Thomas A

Start Date: Immediate

my garden wall is broken, which needs to be fixed are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job do you require the br...

Post a similar request >

27 Jul

Building work | Bricklaying

Stafford - ST16

Enquiry from: Mike C

Start Date: Immediate

help to design (not essential) and then build outdoor kitchen area using reclaimed victorian bricks, to include plumbing for belfast sink and electric power and lighting, on a newly built patio area a...

Post a similar request >

23 Oct

Building work | Bricklaying

Stafford - ST21

Enquiry from: Malcolm M

Start Date: Immediate

building a brick wall 25-30ft long, 4 bricks high to replace wooden sleepers enclosing soil borders against stone wall footings below fence panels. are you the property owner: owner of the property ho...

Post a similar request >

08 Sep

Building work | Bricklaying

Stoke-on-Trent - ST4

Enquiry from: Veena K

Start Date: Immediate

garden wall to be taken down and rebuild due to damage by car driving into it. are you the property owner: relative of owner property type: semi detached how much work would you say needs to be done: ...

Post a similar request >

22 May

Building work | Bricklaying

Stoke-on-Trent - ST10

Enquiry from: Peter W

Start Date: 1 to 3 months

Replace crumbling brickwork on boundary walls Are you the property owner: Owner of the property Property Type: Detached How much work would you say needs to be done: Medium job Do you require the bric...

Post a similar request >

29 Mar

Building work | Bricklaying

Stafford - ST16

Enquiry from: Elliot B

Start Date: Immediate

Brick up half gagged door and fit window Are you the property owner: Owner of the property Property Type: Detached How much work would you say needs to be done: Medium job Do you require the bricks to...

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Newcastle-under-lyme

Get free, no-obligation quotes from 4 verified Builders working in Newcastle-under-lyme.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.