Bricklaying in Cheadle

Obtain Bricklaying Prices in Cheadle

Home > General Building Projects > Bricklayers > Cheadle

Bricklaying in Cheadle

Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For some conversions, the garage door is infilled and a solid wall with one or two windows is put into the front or side of the house.

 

This brick wall will demand foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into account. Depending on the current thickness of the external brickwork walls, they'll require extra insulation. This is usually done with the addition of internal wall insulation like insulated plasterboard, or with the addition of an additional layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork will have to adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.

 

As opposed to several ideas, a bricklayer in fact does more than laying of bricks. There's more to being a bricklayer than you can most likely think about. A solitary bricklaying jobs needs a broad variety of abilities. Allow's have a look at these abilities!

  • Making use of damp resistant materials to seal structures.
  • Spreading out mortar in between joints and using them to act as a thick layer binding the blocks with each other in rows.
  • Checking out as well as working from specifications in addition to plans.
  • Collaborating with brick-cutting devices.
  • Taking charge as well as caring for concrete blocks or bricks, clay bricks and the likes.
  • Building and construction of scaffolding - subject to possession of some licenses in some states.

This is not only an visual decision, as matching existing brickwork could be a requirement of planning permission or building regulations in your area. We will supply approximately four Bricklayers pros locally, that will supply quotations for the work you want done. You'll obtain a home visit from professionals in Cheadle that'll aid you to choose the appropriate Bricklayers for your home prior to carrying out the installation. Enter your postal code to begin looking currently.

Average Bricklayers cost in Cheadle

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Cheadle, as reported by local LeadsDoWork members.

Bricklayers installation cost in Cheadle 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in November 2024

Bricklayers Projects in Cheadle in October 2024

889

Requests for quotations in Cheadle in October 2024

0

Requests for Bricklayers quotations in Cheadle in October 2024. 0% change from September 2024.

0

Requests for Bricklayers quotations in Cheshire in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Cheadle October 2024

Cheadle

Cheadle is a suburban town in the Metropolitan Borough of Stockport in Greater Manchester, England. Historically in Cheshire, it borders Cheadle Hulme, Gatley, Heald Green and Cheadle Heath within Stockport, and East Didsbury in Manchester. At the time of 2001 it enjoyed a population of 14,261.

Looking for Bricklayers in Cheadle?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Cheadle

12 Aug

Building work | Bricklaying

Cheadle - SK8

Enquiry from: Piers L

Start Date: Immediate

2m extension to brick patio. small job i have rhe bricks. labour only asap please? are you the property owner: owner of the property do you require the bricks to be supplied too: no how much work wou...

Post a similar request >

12 Nov

Building work | Bricklaying

Cheadle - SK8

Enquiry from: Ronald B

Start Date: Immediate

small garden type wall from gable end to front of driveway,approx 3 foot in height. are you the property owner: owner of the property property type: terrace property type: semi detached do you require...

Post a similar request >

20 Oct

Building work | Bricklaying

Cheadle - SK8

Enquiry from: Andy C

Start Date: Immediate

Blockwork from footings to dpc Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the bricks to be su...

Post a similar request >

25 Jan

Building work | Bricklaying

Cheadle - SK8

Enquiry from: Mike H

Start Date: Immediate

The top of a 5 foot wall to be bricked. The wall is approx. 20-25 metres long; a foot wide and will need about 3-4 bricks in height to complete. Already have a load of bricks and sand. Looking for bes...

Post a similar request >

14 Apr

Building work | Bricklaying

Cheadle - SK8

Enquiry from: J D

Start Date: Immediate

Front drive wall Homeowner Please contact to appoint

Post a similar request >

10 Sep

Building work | Bricklaying

Macclesfield - SK11

Enquiry from: Michal P

Start Date: Immediate

Bricklayers Lead Bricklayers Lead Bricklayers Lead

i have about 16 bricks that need to be replaced. they are at the bottom, almost all in a single row, a few elsewhere but still in the bottom row. also about 4-6 bricks that need repointing. i'm curiou...

Post a similar request >

17 Aug

Building work | Bricklaying

Northwich - CW9

Enquiry from: Sylvia C

Start Date: Less than one month

Bricklayers Lead

remove old render, make good bricks and silicone/k render in buttermilk to sw wall of property are you the property owner: owner of the property what type of work do you need to have done: brick work ...

Post a similar request >

10 Oct

Building work | Bricklaying

Altrincham - WA15

Enquiry from: Alex B

Start Date: Immediate

37 meter boudry wall 100mm concrete blocks layed flat. we will do our own rendering concrete footing already done are you the property owner: owner of the property property type: detached how much wor...

Post a similar request >

05 Apr

Building work | Bricklaying

Stockport - SK12

Enquiry from: Alex H

Start Date: Immediate

brick crumbled whilst trying to install a bracket to the side of the house are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: ...

Post a similar request >

22 Feb

Building work | Bricklaying

Macclesfield - SK11

Enquiry from: Garry L

Start Date: Immediate

hello - i'm looking to get a brick layer to brick up the corner of my conservatory. i wonder whether you'd be interested in giving me a quote? i live in lower withington on the a535. many thanks garr...

Post a similar request >

09 Nov

Building work | Bricklaying

Crewe - CW4

Enquiry from: Zoe M

Start Date: Immediate

7ft high, brick perimeter wall about 50meters in length, to include concrete footing and removal of existing old fence. are you the property owner: owner of the property property type: detached how mu...

Post a similar request >

14 Oct

Building work | Bricklaying

Wilmslow - SK9

Enquiry from: David M

Start Date: Immediate

i need some work on an internal wall which we intend to have as exposed brick. the brickwork needs cleaned, some replaced and re pointed. i hope you can assist. are you the property owner: owner of t...

Post a similar request >

22 Aug

Building work | Bricklaying

Knutsford - WA16

Enquiry from: Christian M

Start Date: Immediate

chimney stack removal & make good of brickwork around it / exposed by removal. dig trench around house for applying 20 mm thick xps below dpc with bitumen paint applied over the render base coat belo...

Post a similar request >

05 Aug

Building work | Bricklaying

Crewe - CW4

Enquiry from: David D

Start Date: Immediate

two brick walls from roadside to two brick gateposts to support mainly solid wooden gates. each wall to be approx. 3 metres long, 1.5 metres high with flat coving on top of the walls and posts. envisa...

Post a similar request >

21 Jun

Building work | Bricklaying

Macclesfield - SK10

Enquiry from: Sara G

Start Date: Immediate

i was wondering if you could build a gate post for me. i have had a garage taken down and want to put gates up . i have got a post already on the other side and i also have all the bricks. are you the...

Post a similar request >

07 Jun

Building work | Bricklaying

Stockport - SK12

Enquiry from: Christine H

Start Date: Immediate

repairs to 2 garden walls are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: minor works do you require the bricks to be suppl...

Post a similar request >

27 Nov

Building work | Bricklaying

Wilmslow - SK9

Enquiry from: Jonas B

Start Date: Immediate

hi, after building a garage there are parts of two old boundary walls that needs rebuilding.one is a normal old brick wall and one is a very old stone wall are you the property owner: owner of the pr...

Post a similar request >

12 Nov

Building work | Bricklaying

Macclesfield - SK10

Enquiry from: Peter J

Start Date: Immediate

we are in progress of completing a new build and have several entrance and boundary walls building in brickwork and blockwork. are you the property owner: owner of the property property type: detached...

Post a similar request >

07 Sep

Building work | Bricklaying

Knutsford - WA16

Enquiry from: Chris W

Start Date: Immediate

i am looking for someone to rebuild a brick chamber. it was part taken down to change an under ground valve. the area around is full y exposed so access is not an issue.

Post a similar request >

01 Sep

Building work | Bricklaying

Macclesfield - SK11

Enquiry from: John J

Start Date: 1 to 3 months

repair dry wall at the front of the house

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Cheadle

Get free, no-obligation quotes from 4 verified Builders working in Cheadle.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

Placholder Image

Other Top Projects in Cheadle

Are you a builder in Cheadle?

We can help you get more Bricklayers work and boost your business.

Join today