Building work | Bricklaying
Liverpool - L31
Enquiry from: Sandra B
Start Date: Immediate
New shopfront wall approx 3 foot high
Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of the property.
This solid wall requires foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, so the new brickwork wall will need to take this into account. Depending on the current thickness of the exterior brickwork walls, they will require extra insulation. Normally, this is achieved with the addition of interior wall insulation like insulated plasterboard, or with the addition of another layer of brickwork to create a cavity wall. These options are again reliant on the existing garage foundations. In addition, if the walls are shared with a neighbour's property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.
Contrary to several ideas, a bricklayer in fact does more than laying of bricks. There's even more to being a bricklayer than you can possibly think of. A solitary bricklaying jobs requires a wide variety of abilities. Allow's look at these skills!
This is not just an cosmetic decision, as coordinating with existing brickwork is potentially a condition of planning permission or building regulations in your area. We will offer up to four Bricklayers pros locally, that will supply quotations for the job you desire done. You'll get a home visit from experts in Merseyside that'll aid you to choose the appropriate Bricklayers for your residence prior to performing the setup. Enter your postal code to begin looking currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Merseyside in October 2024
Requests for Bricklayers quotations in Merseyside in October 2024. 0% change from September 2024.
Requests for Bricklayers quotations in North West in October 2024. 0% change from September 2024.
Liverpool - L31
Enquiry from: Sandra B
Start Date: Immediate
New shopfront wall approx 3 foot high
Wirral - CH49
Enquiry from: Liam G
Start Date: Immediate
i am writing to see if this company is hiring any apprentices this september
Prenton - CH43
Enquiry from: Barry C
Start Date: Immediate
IAM a bricklayer 26years experience and just inquiring if you are looking for any bricklayers? I've got a full driving licence an own tools, thank you for taking the time to read this.
Ellesmere Port - CH66
Enquiry from: Nayde M
Start Date: Immediate
Garden wall for back garden.
Wirral - CH62
Enquiry from: Jennifer R
Start Date: Immediate
Driveway wall hit by car - needs rebuilding
Birkenhead - CH41
Enquiry from: Mike C
Start Date: Immediate
138 MTRS blockwork, block , mortar, insulation supplied. Job is in prenton. Rear extension, followed by double storey side extension in block, followed by sma*** storey extension in brickwork. Thanks ...
Neston - CH64
Enquiry from: Philip J
Start Date: Immediate
We have a single story extension that requires approx 8 coping stones going on top of a staggered wall. Would you be interesting in coming to have a look and give us a price? Thanks
Wirral - CH46
Enquiry from: Debbie O
Start Date: 1 to 3 months
customer has a general building project they are looking to have done, specially they want quotes for bricklaying. they are unsure of options so would like to discuss with a builder.confirmed interest...
Wirral - CH47
Enquiry from: Paul V
Start Date: Immediate
hi, i have a single garage that i want to extend with block. i will be doing the joinery etc - just need the brickwork doing, cheers, paul are you the property owner: owner of the property property ty...
Ellesmere Port - CH65
Enquiry from: Debbie A
Start Date: Immediate
repointing to part of small semi detached house how much work would you say needs to be done: lots of work property type: commercial
Wirral - CH46
Enquiry from: Adam P
Start Date: Immediate
our front garden wall is about to collapse and will require a new wall. are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: sm...
Wirral - CH62
Enquiry from: Claire J
Start Date: Immediate
Fix wobbly broken wall front garden
Wirral - CH63
Enquiry from: Ian C
Start Date: Immediate
we are currently doing some redevelopment work at bebington care home on heath road not far from wirral grammar school. there is some work installing steelwork so walls can be demolished. would ypu be...
Wirral - CH49
Enquiry from: Diane G
Start Date: Immediate
a single storey extension to the rear of property. are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: medium job do you requir...
Wirral - CH60
Enquiry from: Ray S
Start Date: Immediate
Hello there. I am wanting a low brick partition/garden wall knocked down and rebuilt. I am just looking for a quote. Many thanks.
Wirral - CH61
Enquiry from: Gary M
Start Date: Immediate
I'm looking at getting a wall built in my back garden. Also looking at getting a wall built and back filled and stabbing placed on top in the back garden. It will be easier for me to explain in perso...
Wirral - CH60
Enquiry from: Peter W
Start Date: Immediate
Building of 3 garden walls. 2m high, total length 110m. Type of brick/stone used to be discussed. Thank you. I look forward to hearing from you.
Wallasey - CH45
Enquiry from: Marc J
Start Date: Immediate
Hello, I'm contacting you on behalf of my mother. In short, the existing back fencing / small wall has started collapsing. I suggested (for her security etc) it might be better to replace with a bl...
Liverpool - L1
Enquiry from: Elizabeth L
Start Date: 1 to 3 months
strapping 2 2m long cracks 2mm deep from gutter to ground floor window and repointing. no subsidence indicated. removal of 4 square metres of damp rendering. re coating wall with masonry paint. remov...
Liverpool - L37
Enquiry from: Peter K
Start Date: Immediate
there are 2 pillars on garden wa*** high. these are leaning outwards towards the public footpath, with 3 ft wall about 4 ft long between the pillars. i think they need taking down and better footings ...
Answer a few quick questions, so we can match you with professionals who can help.
Get free, no-obligation quotes from 4 verified Builders working in Merseyside.
Compare customer reviews, services and prices, and choose the right professional for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.
As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.
It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.
Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
We can help you get more Bricklayers work and boost your business.
Join today