Bricklaying in Nantwich

Discover Bricklaying Prices in Nantwich

Home > General Building Projects > Bricklayers > Nantwich

Bricklaying in Nantwich

Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of your home.

 

This brick wall requires foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the external brickwork walls, they might require extra insulation. This is usually achieved by adding interior wall insulation like insulated plasterboard, or with the addition of a supplementary layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the home.

 

Contrary to numerous beliefs, a bricklayer in fact does more than laying of bricks. There's more to being a bricklayer than you can most likely think of. A single bricklaying jobs calls for a wide array of skills. Let's look at these skills!

  • Using moist resistant materials to secure structures.
  • Spreading out mortar between joints as well as applying them to function as a thick layer binding the blocks with each other in rows.
  • Reviewing and also functioning from specs along with plans.
  • Dealing with brick-cutting makers.
  • Taking charge and also taking care of cement blocks or blocks, clay blocks as well as the likes.
  • Construction of scaffolding - based on belongings of some licenses in some states.

This is not only an aesthetic decision, as matching existing brickwork might be a requirement of planning permission or building regulations in your area. We will offer up to four Bricklayers pros locally, who will certainly supply quotes for the work you want done. You'll get a home visit from professionals in Nantwich who'll help you to choose the right Bricklayers for your house prior to accomplishing the installment. Enter your postcode to begin searching currently.

Average Bricklayers cost in Nantwich

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Nantwich, as reported by local LeadsDoWork members.

Bricklayers installation cost in Nantwich 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in April 2025

Bricklayers Projects in Nantwich in March 2025

1,413

Requests for quotations in Nantwich in March 2025

0

Requests for Bricklayers quotations in Nantwich in March 2025. 0% change from February 2025.

0

Requests for Bricklayers quotations in Cheshire in March 2025. 0% change from February 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Nantwich March 2025

Nantwich

Nantwich is a market town and civil parish in the Borough of Cheshire East and the county of Cheshire, England. It is located on the Cheshire Plain, on the shores of the River Weaver. The Shropshire Union Canal passes through to the west of the town on an embankment, transversing the A534 by using an iron aqueduct, with the basin being a common mooring for visitors to the town. Nantwich is about four miles south-west of Crewe and 20 miles south-east of Chester. According to the 2011 census, Nantwich has a permanent population of about 17424 and is host to a wide range of several gatherings held throughout the year. The International Cheese Awards are completed in Nantwich as a part of Nantwich Show, which is an annual farming showcase held at the Dorfold Hall estate in July. The 83000 square foot marquee which contains the awards has actually had up to 4425 different cheese entries from about 26 nations. Another noteworthy event incorporating food is the yearly Nantwich Food Festival, which occurs in the town centre over the first weekend in September. Revived as a free-entry event in 2010, the festival draws lots of artisan producers from both the area and further afield, and delivers chef demonstrations, family activities and entertainment. It attracts about 30000 visitors a year. The town is known for having the most extensive collection of historic structures in the county. Many of the listed buildings can be located in the town centre, set within the 38 hectares (94 acres) of conservation area, which largely follows the boundaries of the late medieval and early post-medieval town. For all of your house upgrades, make sure to make use of dependable professionals in Nantwich to make certain of quality.

Looking for Bricklayers in Nantwich?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Nantwich

01 Jul

Building work | Bricklaying

Nantwich - CW5

Enquiry from: Julia L

Start Date: Immediate

we need a reliable builder to build a single storey extension in the style of a garden room. are you the property owner: owner of the property property type: detached how much work would you say need...

Post a similar request >

20 Nov

Building work | Bricklaying

Nantwich - CW5

Enquiry from: Catherine H

Start Date: Immediate

front (garden) wall needs re-building, having been partially demolished by a truck. initially i need a quote for their insurers. are you the property owner: owner of the property property type: semi ...

Post a similar request >

24 Apr

Building work | Bricklaying

Tarporley - CW6

Enquiry from: Jeff N

Start Date: Immediate

new build house one wing blockwork ecternal for timber cladding and one wing handmade cheshire brick. please give jeff norris a call on ***. thanks are you the property owner: owner of the property p...

Post a similar request >

24 Jan

Building work | Bricklaying

Crewe - CW3

Enquiry from: John C

Start Date: Immediate

Bricklayers Lead

Building brick small inner porch wall 31 inches wide X 39 inches high wall beneath. Have bricks and mortar to hand.

Post a similar request >

28 Oct

Building work | Bricklaying

Whitchurch - SY13

Enquiry from: Tony T

Start Date: Immediate

Gable end rebuilding on the property, already removed.

Post a similar request >

19 May

Building work | Bricklaying

Crewe - CW2

Enquiry from: Kay E

Start Date: Immediate

front garden wall is collapsing on the corner. the coping stones also need replacing. w,all is about 1 meter high are you the property owner: owner of the property property type: semi detached how muc...

Post a similar request >

10 Mar

Building work | Bricklaying

Stoke-on-Trent - ST1

Enquiry from: Chris E

Start Date: 1 to 3 months

raking out and pointing, external house wall are you the property owner: relative of owner property type: terrace what type of work do you need to have done: brick work do you have the materials you n...

Post a similar request >

15 Jan

Building work | Bricklaying

Stoke-on-Trent - ST1

Enquiry from: Thomas A

Start Date: Immediate

my garden wall is broken, which needs to be fixed are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job do you require the br...

Post a similar request >

19 Oct

Building work | Bricklaying

Crewe - CW1

Enquiry from: Nitescu M

Start Date: Immediate

build a 10 layer of bricks for a conservatory need a brick man asap are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: small j...

Post a similar request >

04 Oct

Building work | Bricklaying

Stoke-on-Trent - ST7

Enquiry from: Matthew I

Start Date: Immediate

i require a window bricking and insulating on the bathroom before we have a bathroom refit in november. are you the property owner: owner of the property property type: detached how much work would yo...

Post a similar request >

31 Mar

Building work | Bricklaying

Crewe - CW2

Enquiry from: Denis C

Start Date: Immediate

repair of wall and pillar. bricks and caps intact. wall section 1.4m long, 0.4 high, 0.3 wide. pillar 1m high. are you the property owner: owner of the property do you require the bricks to be supplie...

Post a similar request >

19 Nov

Building work | Bricklaying

Sandbach - CW11

Enquiry from: Tim W

Start Date: Immediate

new 4 bed house to be built from reclaimed brick. some architectural features. start asap. are you the property owner: owner of the property property type: detached how much work would you say needs ...

Post a similar request >

08 Sep

Building work | Bricklaying

Stoke-on-Trent - ST4

Enquiry from: Veena K

Start Date: Immediate

garden wall to be taken down and rebuild due to damage by car driving into it. are you the property owner: relative of owner property type: semi detached how much work would you say needs to be done: ...

Post a similar request >

05 Sep

Building work | Bricklaying

Newcastle - ST5

Enquiry from: Andrea F

Start Date: 1 to 3 months

Homeowner Please contact to appoint Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the bricks to...

Post a similar request >

22 May

Building work | Bricklaying

Stoke-on-Trent - ST6

Enquiry from: Peter P

Start Date: Less than one month

build 9 inch block wall at front of property aprox 13ft long by 4ft high on original footings

Post a similar request >

02 Feb

Building work | Bricklaying

Stoke-on-Trent - ST6

Enquiry from: Jenny M

Start Date: Immediate

Remove soil pipe An put outside property and knock out walls in kitchen

Post a similar request >

29 Mar

Building work | Bricklaying

Crewe - CW2

Enquiry from: Carl M

Start Date: Immediate

Remove old steel cladding wall replace with brick and wooden panel Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Medium...

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Nantwich

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Nantwich.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

Placholder Image

Other Top Projects in Nantwich

Customer Reviews

Overall rating:


Nantwich Bricklayers installers are rated 4.6 out of 5 based on 2 reviews of 8 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Nantwich Bricklayers contractors

Are you a builder in Nantwich?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today