Bricklaying in Dukinfield

Find Bricklaying Prices in Dukinfield

Home > General Building Projects > Bricklayers > Dukinfield

Bricklaying in Dukinfield

Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For some conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of the property.

 

This brick wall will require foundations or lintel supports which might or might not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the external brickwork walls, they will likely require supplemental insulation. This is usually achieved by adding interior wall insulation like insulated plasterboard, or with the addition of a supplementary layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbouring property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.

 

In contrast to many beliefs, a bricklayer in fact does greater than laying of blocks. There's even more to being a bricklayer than you can most likely consider. A single bricklaying projects needs a large variety of abilities. Allow's have a look at these abilities!

  • Using wet resistant materials to seal structures.
  • Spreading out mortar between joints and using them to work as a thick layer binding the blocks together in rows.
  • Checking out and working from specifications as well as plans.
  • Collaborating with brick-cutting machines.
  • Taking charge as well as taking care of cement blocks or blocks, clay bricks as well as the likes.
  • Building of scaffolding - subject to property of some licenses in some states.

This is not simply an visual decision, as matching existing brickwork might be a requirement of planning permission or building regulations in your area. We will provide as much as four Bricklayers pros in your area, who will provide quotes for the job you want done. You'll get a home visit from professionals in Dukinfield who'll help you to pick the ideal Bricklayers for your home before accomplishing the setup. Enter your postcode to begin browsing currently.

Average Bricklayers cost in Dukinfield

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Dukinfield, as reported by local LeadsDoWork members.

Bricklayers installation cost in Dukinfield 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in September 2024

Bricklayers Projects in Dukinfield in August 2024

581

Requests for quotations in Dukinfield in August 2024

0

Requests for Bricklayers quotations in Dukinfield in August 2024. 0% change from July 2024.

0

Requests for Bricklayers quotations in Cheshire in August 2024. 0% change from July 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Dukinfield August 2024

Dukinfield

Dukinfield is a town in Tameside, Greater Manchester, England. It is located on the south bank of the River Tame opposite Ashton under Lyne, being 6.3 miles east of Manchester. The town broadened from being simply a small town with much open land. Its advancement took place predominately because of the Industrial Revolution, where it ended up being the site of both coal mining and cotton production. The pasture and meadow land were completely wiped out, with the construction of two cotton mills prior to 1794, and then seven by 1825. The largest mills, being built towards the latter end of the 19th century, were Tower, Tame Valley, River, Park Road and Queen Mills, which featured four or five storeys, sizeable windows, ornate towers, engine houses and high chimneys. There were additionally a variety of collieries opening throughout the 19th century, such as the Dukinfield Colliery, which was 1020 feet deep to the coal seam and was linked to the upcast ventilation shaft. According to the 2011 Census, Dukinfield has a population of 19306. The population density is 9922 inhabitants per square mile, with a 100 to 93.9 female-to-male ratio. The town continues to have a higher proportion of people operating in making compared with other areas in in the area, being at 24.4 per cent. 19.3 per cent of the population worked in retail and wholesale, 10 per cent in health and social services, 9.5 per cent in residential or commercial property and service services, 6.5 percent in transportation and communications, and 3.4 percent in hotels and dining establishments. There are a lot of opportunities for locals to go shopping in both independent and commercial chain stores. For all of your home upgrades, make certain to make usage of reliable contractors in Dukinfield to make certain of quality.

Looking for Bricklayers in Dukinfield?

Get free quotes from local builders

Get free quotes

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Dukinfield

Get free, no-obligation quotes from 4 verified Builders working in Dukinfield.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Placholder Image

Other Top Projects in Dukinfield

Are you a builder in Dukinfield?

We can help you get more Bricklayers work and boost your business.

Join today