Bricklaying in Ossett

Compare Bricklaying Prices in Ossett

Home > General Building Projects > Bricklayers > Ossett

Bricklaying in Ossett

Extensions will usually demand brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For many conversions, the garage door is infilled and a brick wall with one or two windows is put into the front or side of the home.

 

This brick wall will demand foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the outer brickwork walls, they might require supplemental insulation. This is usually achieved with the addition of internal wall insulation like insulated plasterboard, or with the addition of a supplementary layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork will have to adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the house.

 

As opposed to lots of beliefs, a bricklayer actually does greater than laying of bricks. There's even more to being a bricklayer than you can possibly think about. A solitary bricklaying projects requires a vast array of abilities. Allow's have a look at these skills!

  • Using moist resistant materials to seal structures.
  • Spreading out mortar in between joints and also using them to function as a thick layer binding the blocks together in rows.
  • Reading as well as working from requirements as well as strategies.
  • Working with brick-cutting equipments.
  • Taking charge and taking care of cement blocks or blocks, clay blocks and also the sort.
  • Construction of scaffolding - subject to property of some licenses in some states.

This is not just an aesthetic decision, as coordinating with existing brickwork could be a condition of planning permission or building regulations in your area. We will supply approximately four Bricklayers pros locally, that will certainly supply quotations for the job you want done. You'll receive a home visit from professionals in Ossett who'll help you to choose the appropriate Bricklayers for your house before carrying out the installment. Enter your postal code to begin looking currently.

Average Bricklayers cost in Ossett

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Ossett, as reported by local LeadsDoWork members.

Bricklayers installation cost in Ossett 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in January 2025

Bricklayers Projects in Ossett in December 2024

734

Requests for quotations in Ossett in December 2024

0

Requests for Bricklayers quotations in Ossett in December 2024. 0% change from November 2024.

0

Requests for Bricklayers quotations in West Yorkshire in December 2024. 0% change from November 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Ossett December 2024

Ossett

Ossett is a market town within the metropolitan district of the City of Wakefield in West Yorkshire. Generally a town located in the West Riding of Yorkshire, it is positioned near junction 40 of the M1 motorway, in between Dewsbury, found to the west, and Wakefield, which is located to the east of the town. Measurements suggest that the town is equidistance in between the west and east coasts of England. Its recorded population in the 2001 Census was 21076, and the West Yorkshire Police predicted the population to be at 21284 in 2007. The nearness of the town to the M1 motorway has permitted a progressing affluence in the town, capturing the attention of both industry and commuters to Leeds, enabling the improvement of an old industrial town that experienced virtually Thirty Years of financial decrease. Ossett is also noted for holding some of the lowest crime rates in West Yorkshire. There are at present 4 functioning mills in the town, involved with recycled cloths, the production of carpet tiles, felts for the bed mattress making and horticultural business and fabric mill waste. The town also has 2 real ale breweries. There are a number of noteworthy features and landmarks in the town. Trinity Church, consecrated in 1865, is 226 feet tall, which, as a consequence, is a landmark that can be seen for miles around. There is a red call box in the town centre which is a Grade II listed structure, and there is a landmark water tower. For all your house upgrades, make sure to make use of dependable professionals in Ossett to make certain of quality.

Looking for Bricklayers in Ossett?

Get free quotes from local builders

Get free quotes

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Ossett

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Ossett.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Placholder Image

Other Top Projects in Ossett

Customer Reviews

Overall rating:


Ossett Bricklayers installers are rated 4.5 out of 5 based on 3 reviews of 18 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Ossett Bricklayers contractors

Are you a builder in Ossett?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today