Bricklaying in Ely

Find Bricklaying Prices in Ely

Home > General Building Projects > Bricklayers > Ely

Bricklaying in Ely

Extensions will require brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For many conversions, the garage door is infilled and a brick wall with one or two windows is put into the front or side of the home.

 

This brick wall will need foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the external brickwork walls, they'll require extra insulation. Normally, this is done by adding interior wall insulation like insulated plasterboard, or with the addition of a supplementary layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. In addition, if the walls are shared with a neighbour, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the house.

 

In contrast to several ideas, a bricklayer in fact does greater than laying of bricks. There's more to being a bricklayer than you can most likely consider. A single bricklaying projects needs a wide selection of abilities. Allow's take a look at these skills!

  • Utilizing moist resistant materials to seal foundations.
  • Spreading mortar in between joints and using them to work as a thick layer binding the bricks with each other in rows.
  • Reviewing and functioning from specifications as well as strategies.
  • Dealing with brick-cutting makers.
  • Taking charge and also caring for concrete blocks or bricks, clay bricks as well as the sort.
  • Construction of scaffolding - based on property of some licenses in some states.

This is not only an visual decision, as matching existing brickwork might be a requirement of planning permission or building regulations in your area. We will provide up to four Bricklayers pros in your area, who will offer quotes for the work you desire done. You'll get a property visit from experts in Ely that'll help you to select the best Bricklayers for your home before accomplishing the setup. Enter your postal code to start looking now.

Average Bricklayers cost in Ely

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Ely, as reported by local LeadsDoWork members.

Bricklayers installation cost in Ely 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in January 2025

Bricklayers Projects in Ely in December 2024

776

Requests for quotations in Ely in December 2024

0

Requests for Bricklayers quotations in Ely in December 2024. 0% change from November 2024.

0

Requests for Bricklayers quotations in Cambridgeshire in December 2024. 0% change from November 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Ely December 2024

Ely

Ely is a little city in Cambridgeshire, situated in a 23-square mile clay island. With a tiny populace of little more than 20,000 it's one of the smallest cities in England. Ely retains most of the architecture from the Norman period, with a lot of properties holding this dated look. There's also a variety of new properties all over the city and its suburbs as well. For any home improvements you need in Ely, be sure to make use of respected contractors and get the best finish possible.

Looking for Bricklayers in Ely?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Ely

21 Mar

Building work | Bricklaying

Ely - CB7

Enquiry from: Hannah D

Start Date: Immediate

Laying concrete blocks then block & beam and another 2 courses of blocks. House 20m x 10m

Post a similar request >

29 Apr

Building work | Bricklaying

Ely - CB7

Enquiry from: Mike W

Start Date: Immediate

install a pre-fabricated "gothic" style stone arch at a corner at the edge of our small garden (arch will be purchased by client from redwood stone folly & garden in somerset.) the arch is approximat...

Post a similar request >

30 Mar

Building work | Bricklaying

Ely - CB7

Enquiry from: Mike W

Start Date: Immediate

build two brick columns to frame a side gate to garden. set in firm foundation so columns are secure. are you the property owner: owner of the property property type: terrace how much work would you s...

Post a similar request >

16 May

Building work | Bricklaying

Newmarket - CB8

Enquiry from: David W

Start Date: Immediate

widen driveway entrance by approx 12 feet/ 3.6m, and insert new driveway gate posts, and replace brick pillar top. 1. remove brick pillar 50cm (l) 50cm (w) 110cm (h) and brick wall 100cm (l) 25cm (w)...

Post a similar request >

15 Jul

Building work | Bricklaying

Cambridge - CB24

Enquiry from: Robert W

Start Date: Less than one month

quote for labour only. lay 7 x 4m beams. infill with blocks. lay approx 80 slip bricks are you the property owner: owner of the property what type of work do you need to have done: brick work do you h...

Post a similar request >

14 Aug

Building work | Bricklaying

Bury St. Edmunds - IP28

Enquiry from: Rebecca M

Start Date: Immediate

some bricks missing from old exposed brick fireplace. would like to get this repaired. are you the property owner: owner of the property property type: semi detached how much work would you say needs ...

Post a similar request >

31 Jul

Building work | Bricklaying

March - PE15

Enquiry from: Lisa M

Start Date: 1 to 3 months

need a car garage built roughly 14.5 foot long x 13.5 feet wide with garage door - also would we need planing for this size - it would be going onto a concerete base that we would put down

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Ely

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Ely.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Do bricklayers need a license?

Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.

As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.

It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.

Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Placholder Image

Other Top Projects in Ely

Customer Reviews

Overall rating:


Ely Bricklayers installers are rated 5 out of 5 based on 2 reviews of 21 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Ely Bricklayers contractors

Are you a builder in Ely?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today