Bricklaying in Swaffham

Discover Bricklaying Prices in Swaffham

Home > General Building Projects > Bricklayers > Swaffham

Bricklaying in Swaffham

Extensions will usually demand brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For most conversions, the garage door is infilled and a solid wall with one or two windows is put into the front or side of the property.

 

This brick wall will demand foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the exterior brickwork walls, they may require extra insulation. This is usually done by adding internal wall insulation like insulated plasterboard, or with the addition of an extra layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.

 

In contrast to numerous beliefs, a bricklayer actually does more than laying of bricks. There's more to being a bricklayer than you can possibly think about. A solitary bricklaying jobs requires a wide range of skills. Let's look at these abilities!

  • Making use of wet resistant materials to secure foundations.
  • Spreading out mortar between joints as well as applying them to act as a thick layer binding the bricks with each other in rows.
  • Checking out and functioning from requirements as well as strategies.
  • Working with brick-cutting equipments.
  • Taking charge and caring for concrete blocks or bricks, clay bricks as well as the sort.
  • Building of scaffolding - subject to ownership of some licenses in some states.

This is not just an aesthetic decision, as coordinating with existing brickwork could be a condition of planning permission or building regulations in your area. We will supply approximately four Bricklayers pros in your area, who will supply quotes for the work you want done. You'll receive a property visit from specialists in Swaffham that'll assist you to choose the best Bricklayers for your residence prior to carrying out the setup. Enter your postcode to start browsing currently.

Average Bricklayers cost in Swaffham

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Swaffham, as reported by local LeadsDoWork members.

Bricklayers installation cost in Swaffham 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in January 2025

Bricklayers Projects in Swaffham in December 2024

561

Requests for quotations in Swaffham in December 2024

0

Requests for Bricklayers quotations in Swaffham in December 2024. 0% change from November 2024.

0

Requests for Bricklayers quotations in Norfolk in December 2024. 0% change from November 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Swaffham December 2024

Swaffham

Swaffham is a market community as well as civil parish in the Breckland District and also English area of Norfolk. It is positioned 12 miles (19 kilometres) eastern of King's Lynn and 31 miles (50 kilometres) west of Norwich. The civil parish has an area of 11.42 sq mi (29.6 km2) and in the 2001 census had a population of 6,935 in 3,130 houses, which enhanced to 7,258, in 3,258 houses, at the 2011 census. For the objectives of city government, the parish drops within the district of Breckland. On the west side of Swaffham Market Place are a number of old structures which for several years housed the historical Hamond's Grade school, as a plaque on the wall surface of the primary structure explains. The Hamond's Grade school constructing more recently concerned act as the 6th form for the Hamond's High School, yet that use has considering that discontinued. Harry Carter, the grammar school's art instructor of the 1960s, was accountable for a great number of the sculpted village signs that are currently located in many of Norfolk's communities as well as villages, including Swaffham's very own sign commemorating the famous Pedlar of Swaffham, which is in the edge of the marketplace place simply opposite the old-fashioned's entrances. Carter was a far-off cousin of the archaeologist and also egyptologist Howard Carter that invested a lot of his youth in the town.

Looking for Bricklayers in Swaffham?

Get free quotes from local builders

Get free quotes

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Swaffham

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Swaffham.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

Placholder Image

Other Top Projects in Swaffham

Customer Reviews

Overall rating:


Swaffham Bricklayers installers are rated 4.7 out of 5 based on 4 reviews of 17 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Swaffham Bricklayers contractors

Are you a builder in Swaffham?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today