Bricklaying in Yorkshire & Humber

Get Bricklaying Prices in Yorkshire & Humber

Home > General Building Projects > Bricklayers > Yorkshire & Humber

Bricklaying in Yorkshire & Humber

Extensions will usually demand brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a solid wall with a couple of windows is put into the front or side of the house.

 

This solid wall requires foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the exterior brickwork walls, they might require additional insulation. This is usually done with the addition of interior wall insulation like insulated plasterboard, or by adding an additional layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbouring property, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.

 

As opposed to numerous beliefs, a bricklayer really does more than laying of blocks. There's more to being a bricklayer than you can possibly think of. A single bricklaying jobs calls for a wide selection of abilities. Let's look at these skills!

  • Utilizing wet resistant materials to seal structures.
  • Spreading out mortar in between joints and also using them to serve as a thick layer binding the bricks with each other in rows.
  • Reading and working from requirements along with strategies.
  • Collaborating with brick-cutting devices.
  • Taking charge and caring for concrete blocks or blocks, clay blocks and also the sort.
  • Building of scaffolding - subject to belongings of some licenses in some states.

This is not just an visual choice, as complementing existing brickwork is potentially a requirement of planning permission or building regulations in your area. We will offer as much as 4 Bricklayers pros locally, who will certainly provide quotations for the work you desire done. You'll receive a property visit from professionals in Yorkshire & Humber that'll aid you to select the best Bricklayers for your home prior to performing the installment. Enter your postal code to start searching now.

Average Bricklayers cost in Yorkshire & Humber

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£250

Avg. price

Avg. price
£2,750

Avg. price high

Avg. price high
£5,230

£5800

£4350

£2900

£1450

£0

Prices based on actual Bricklayers costs for Yorkshire & Humber, as reported by local LeadsDoWork members.

Bricklayers installation cost in Yorkshire & Humber 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in September 2024

Bricklayers Projects in Yorkshire & Humber in August 2024

127,455

Requests for quotations in Yorkshire & Humber in August 2024

0

Requests for Bricklayers quotations in Yorkshire & Humber in August 2024. 0% change from July 2024.

0

Requests for Bricklayers quotations in United Kingdom in August 2024. 0% change from July 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in counties near Yorkshire & Humber August 2024

Yorkshire & Humber

The Yorkshire and the Humber region of England is located in the of the northeast of the nation and features a population of 5.2 million. Of the 9 English regions, it rates as seventh for population with a density of 340 people per square kilometre. The Yorkshire and the Humber district has seven cities inside of its boundaries, including the large metropolitan locations of Leeds, Sheffield, Hull and York. With much modernisation through the entire district it's crucial to keep your property up-to-date. Work with vetted and trustworthy business professionals to get the best price and a quality finish.

Looking for Bricklayers in Yorkshire & Humber?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Yorkshire & Humber

11 Sep

Building work | Bricklaying

Grimsby - DN37

Enquiry from: Margaret A

Start Date: Immediate

Need a garden wall after hedge removal - approx 8 mtrs acroo and 0.75 mts deep. Can you quote? Please email do not phone as hearing issue post surgery.

Post a similar request >

10 Jan

Building work | Bricklaying

Harrogate - HG2

Enquiry from: Chris G

Start Date: 1 to 3 months

customer in harrogate area has requested that we arrange quotes for their bricklaying project.they are considering various options and would like to discuss with a builder directly.please call to disc...

Post a similar request >

25 Nov

Building work | Bricklaying

Leeds - LS26

Enquiry from: Stuart B

Start Date: 1 to 3 months

customer made an enquiry for bricklaying and confirmed on the quotatis site they would like quotes from a builder.mr lives in the leeds area and would like a call to discuss options.see below details ...

Post a similar request >

26 Jun

Building work | Bricklaying

Malton - YO17

Enquiry from: Charlie O

Start Date: Immediate

2 cracked patio slabs need replacing. photo available. property type: other how much work would you say needs to be done: minor works do you require the bricks to be supplied too: yes are you the pro...

Post a similar request >

30 Mar

Building work | Bricklaying

Bradford - BD10

Enquiry from: Heather S

Start Date: 1 to 3 months

mrs requested quotes for bricklaying from a builder around bradford. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below is wh...

Post a similar request >

19 Jan

Building work | Bricklaying

Barnsley - S70

Enquiry from: Robert C

Start Date: Immediate

small garden wall down drive

Post a similar request >

18 Jan

Building work | Bricklaying

Normanton - WF6

Enquiry from: Graham T

Start Date: Immediate

Bricklayers Lead

i need concrete bases for 1 or 2 sheds, 12' by 8' and 8' by 6', with a trench leading from the house (30ft away) to carry pipes and electrical cables. i also need a couple of l-shaped retaining walls,...

Post a similar request >

05 Dec

Building work | Bricklaying

Sheffield - S26

Enquiry from: Catherine M

Start Date: Immediate

it's a guess but i think the lintels have stopped load bearing on at least three possibly 4 windows. the lintels would need replacing and the brick work around them replacing/repairing/repointing. ar...

Post a similar request >

04 Nov

Building work | Bricklaying

Hartlepool - TS26

Enquiry from: Sarah D

Start Date: Immediate

new front garden wall we will be knocking the old wall down we have all the bricks ready job will be ready to go are you the property owner: owner of the property property type: semi detached how much...

Post a similar request >

30 Oct

Building work | Bricklaying

Dewsbury - WF12

Enquiry from: Irfan P

Start Date: Immediate

i want to learn quick ways bricklaying are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: lots of work do you require the bricks to ...

Post a similar request >

06 Oct

Building work | Bricklaying

Wakefield - WF4

Enquiry from: Don B

Start Date: Less than one month

replace chimney cement cap and some pointing. property is bungalow are you the property owner: owner of the property property type: semi detached what type of work do you need to have done: roof work,...

Post a similar request >

20 Sep

Building work | Bricklaying

Scunthorpe - DN17

Enquiry from: Teresa T

Start Date: Immediate

i need one of my driveway posts moving to widen my drive then a bit of cementing down the grass side are you the property owner: relative of owner property type: other how much work would you say need...

Post a similar request >

08 Sep

Building work | Bricklaying

Pudsey - LS28

Enquiry from: Pete W

Start Date: Immediate

Repair *** length of boundary wall that has been damaged by vehicle

Post a similar request >

03 Sep

Building work | Bricklaying

Barnsley - S71

Enquiry from: Karen G

Start Date: Immediate

Bricklayers Lead Bricklayers Lead

to knock out and make safe for in wall electric fire. the electric work is done.think it will need a lentil and som brick work. are you the property owner: owner of the property property type: semi d...

Post a similar request >

01 Aug

Building work | Bricklaying

Dewsbury - WF12

Enquiry from: Mohamed A

Start Date: Immediate

lean to on right side of semi detached ( double walls 1 brick 1 block with insulation between ) 10m long x 2m wide x 2.3m height - 3 0r 4 windows along with 2 dividing walls in side. in the rear 2m x...

Post a similar request >

19 Jul

Building work | Bricklaying

Sheffield - S6

Enquiry from: Nagore O

Start Date: Immediate

Bricklayers Lead

hi! we were wondering if you can come and do a small job in our drive. we had a small car accident and some brick felt from a wall. it needs rebuilding. we are 167 dykes hall road. please let us know....

Post a similar request >

17 May

Building work | Bricklaying

Stockton-on-tees - TS17

Enquiry from: Dawn S

Start Date: Immediate

looks like it needs pointing all round are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to b...

Post a similar request >

28 Feb

Building work | Bricklaying

York - YO30

Enquiry from: Mark M

Start Date: Immediate

1) part of my back garden brick wall needs correcting. the last tradesman did a terrible job and was not honest about his bricklaying abilities. part of it needs taking down and correcting. then i wan...

Post a similar request >

18 Feb

Building work | Bricklaying

Brough - HU15

Enquiry from: Jaishree H

Start Date: Immediate

need brickwall construction around the house are you the property owner: owner of the property property type: detached how much work would you say needs to be done: lots of work do you require the bri...

Post a similar request >

06 Feb

Building work | Bricklaying

Hull - HU5

Enquiry from: Geoffrey C

Start Date: Immediate

Bricklayers Lead Bricklayers Lead

i need a pillar of 9 bricks building either side of an existing fire surround that's 18 bricks in total all 18 bricks are cut to size already and just need laying and pointing up are you the property ...

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Yorkshire & Humber

Get free, no-obligation quotes from 4 verified Builders working in Yorkshire & Humber.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Do bricklayers need a license?

Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.

As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.

It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.

Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.

Placholder Image

Other Top Projects in Yorkshire & Humber

Customer Reviews

Overall rating:


Yorkshire & Humber Bricklayers installers are rated 4.6 out of 5 based on 2 reviews of 40 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Yorkshire & Humber Bricklayers contractors

Are you a builder in Yorkshire & Humber?

We can help you get more Bricklayers work and boost your business.

Join today