Building work | Bricklaying
Pudsey - LS28
Enquiry from: Pete W
Start Date: Immediate
Repair *** length of boundary wall that has been damaged by vehicle
Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For most conversions, the garage door is infilled and a solid wall with a couple of windows is put into the front or side of the house.
This solid wall will need foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the outer brickwork walls, they may require supplemental insulation. Normally, this is done with the addition of internal wall insulation like insulated plasterboard, or with the addition of an extra layer of brickwork to create a cavity wall. These options are again dependent on the existing garage foundations. In addition, if any of the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.
Contrary to numerous ideas, a bricklayer actually does greater than laying of blocks. There's even more to being a bricklayer than you can most likely consider. A solitary bricklaying jobs needs a wide selection of abilities. Let's take a look at these abilities!
This is not simply an cosmetic choice, as complementing existing brickwork is potentially a condition of planning permission or building regulations in your area. We will provide up to 4 Bricklayers pros locally, that will certainly use quotations for the work you want done. You'll get a property visit from specialists in Pudsey that'll aid you to pick the appropriate Bricklayers for your home prior to accomplishing the setup. Enter your postal code to start searching currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£5800
£4350
£2900
£1450
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Pudsey in March 2025
Requests for Bricklayers quotations in Pudsey in March 2025. 0% change from February 2025.
Requests for Bricklayers quotations in West Yorkshire in March 2025. 0% change from February 2025.
The market town of Pudsey in West Yorkshire can be found midway between Bradford and Leeds, in the West Riding of Yorkshire. The town has a population of 32,391 and gives its name to Pudsey Bear, linked with Children In Need. For any home improvements you are considering, be sure to only use vetted professionals in Pudsey to get the best price available.
Pudsey - LS28
Enquiry from: Pete W
Start Date: Immediate
Repair *** length of boundary wall that has been damaged by vehicle
Pudsey - LS28
Enquiry from: Natalie T
Start Date: Immediate
3x4 double storey extension in the same style as the current property, the ground floor to be 1metre bigger than the top floor. ideally just want a quote for bricklaying as we are planning on project ...
Dewsbury - WF12
Enquiry from: Irfan P
Start Date: Immediate
i want to learn quick ways bricklaying are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: lots of work do you require the bricks to ...
Wakefield - WF4
Enquiry from: Don B
Start Date: Less than one month
replace chimney cement cap and some pointing. property is bungalow are you the property owner: owner of the property property type: semi detached what type of work do you need to have done: roof work,...
Dewsbury - WF12
Enquiry from: Mohamed A
Start Date: Immediate
lean to on right side of semi detached ( double walls 1 brick 1 block with insulation between ) 10m long x 2m wide x 2.3m height - 3 0r 4 windows along with 2 dividing walls in side. in the rear 2m x...
Wakefield - WF2
Enquiry from: Sarah Y
Start Date: Immediate
hi, i need a 6 metre (length) by 1.5 (height) wall built on the driveway. the fence has come off and i would rather a sturdy wall than a fence. are you the property owner: owner of the property prope...
Dewsbury - WF12
Enquiry from: Irfan P
Start Date: Immediate
hi need bricky for amendment outside my big garage + 10/10 mitre kitchen extension need good bricky are you the property owner: owner of the property property type: terrace how much work would you say...
Dewsbury - WF12
Enquiry from: Richard H
Start Date: Immediate
the build of an outdoor kitchen. the kitchen is to be built under an exsisting timber frame. ideally looking for a u shape (3mtr x 3mtr x 3mtr). i have drawings of possible design. if you interested....
Mirfield - WF14
Enquiry from: Derek. P
Start Date: Immediate
Water coming in over lounge window( inside ) which I have been told is probably down to either a blocked or incorrectly installed drip tray, Would like quote for exactly what the problem is and what ...
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Pudsey.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today