Building work | Bricklaying
Barnsley - S70
Enquiry from: Robert C
Start Date: Immediate
small garden wall down drive
Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of the property.
This solid wall will demand foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the exterior brickwork walls, they may require extra insulation. Normally, this is achieved with the addition of internal wall insulation like insulated plasterboard, or with the addition of an additional layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if any of the walls are shared with a neighbouring property, the brickwork will have to adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the house.
Contrary to lots of ideas, a bricklayer actually does more than laying of blocks. There's even more to being a bricklayer than you can most likely consider. A solitary bricklaying projects needs a broad array of skills. Allow's have a look at these abilities!
This is not just an cosmetic decision, as matching existing brickwork could be a requirement of planning permission or building regulations in your area. We will give as much as four Bricklayers pros in your area, that will certainly use quotes for the work you want done. You'll get a home visit from professionals in Barnsley that'll help you to select the best Bricklayers for your house prior to performing the setup. Enter your postcode to start browsing currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Barnsley in October 2024
Requests for Bricklayers quotations in Barnsley in October 2024. 0% change from September 2024.
Requests for Bricklayers quotations in South Yorkshire in October 2024. 0% change from September 2024.
Barnsley is a town in the South Yorkshire district, lying on the River Deane and local to the cities of Sheffield and Leeds. The borough as a whole is known for a populace of 218,000, with the town holding one third of the total. The town of Barnsley is undergoing lots of change in the last few years as the area starts a modernisation project. To keep your Barnsley household up-to-date, ensure to use vetted experts from the area to get the right cost and a top quality finish.
Barnsley - S70
Enquiry from: Robert C
Start Date: Immediate
small garden wall down drive
Barnsley - S71
Enquiry from: Karen G
Start Date: Immediate
to knock out and make safe for in wall electric fire. the electric work is done.think it will need a lentil and som brick work. are you the property owner: owner of the property property type: semi d...
Sheffield - S6
Enquiry from: Nagore O
Start Date: Immediate
hi! we were wondering if you can come and do a small job in our drive. we had a small car accident and some brick felt from a wall. it needs rebuilding. we are 167 dykes hall road. please let us know....
Sheffield - S2
Enquiry from: Tara S
Start Date: 1 to 3 months
customer in the sheffield area made an enquiry a couple of projects including building maintenance.call anytime and arrange an appointment to discuss. below is some details about this project: are you...
Sheffield - S3
Enquiry from: SRK S
Start Date: Immediate
require 2x bricklayers for brick and block work immediate start excellent pay rates double storey extension basically a shoe box. are you the property owner: owner of the property property type: detac...
Sheffield - S3
Enquiry from: Raffi A
Start Date: Immediate
slabs need refitting ready to put back in are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: small job do you require the bric...
Sheffield - S6
Enquiry from: Zara T
Start Date: 1 to 3 months
sleeper wall approx 2ft high by 12ft across needs removal of 2 brick high mess that some one attempted to build have bricks but may consider changing them
Sheffield - S2
Enquiry from: Leo N
Start Date: 1 to 3 months
Hi, I am requiring a bricklayer for an extension and also a out house in the back garden. I have got lots of jobs that need doing but require a reliable builder... Are you the property owner: Own...
Answer a few quick questions, so we can match you with professionals who can help.
Get free, no-obligation quotes from 4 verified Builders working in Barnsley.
Compare customer reviews, services and prices, and choose the right professional for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.
Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.
Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
We can help you get more Bricklayers work and boost your business.
Join today