Bricklaying in Watford

Compare Bricklaying Prices in Watford

Home > General Building Projects > Bricklayers > Watford

Bricklaying in Watford

Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For many conversions, the garage door is infilled and a solid wall with one or two windows is added to the front or side of your home.

 

This brick wall will require foundations or lintel supports which may or may not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the external brickwork walls, they may require supplemental insulation. Normally, this is done by adding interior wall insulation like insulated plasterboard, or by adding a supplementary layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the home.

 

In contrast to lots of beliefs, a bricklayer in fact does greater than laying of bricks. There's more to being a bricklayer than you can most likely think of. A single bricklaying jobs calls for a wide variety of abilities. Allow's have a look at these skills!

  • Making use of wet resistant materials to secure structures.
  • Spreading mortar in between joints and also using them to serve as a thick layer binding the blocks together in rows.
  • Reading and functioning from requirements in addition to strategies.
  • Dealing with brick-cutting machines.
  • Taking charge and also caring for cement blocks or bricks, clay bricks and the likes.
  • Building and construction of scaffolding - based on property of some licenses in some states.

This is not simply an cosmetic decision, as complementing existing brickwork might be a requirement of planning permission or building regulations in your area. We will offer up to 4 Bricklayers pros locally, that will certainly supply quotes for the job you want done. You'll receive a home visit from specialists in Watford who'll help you to pick the right Bricklayers for your home before carrying out the installation. Enter your postcode to begin looking currently.

Average Bricklayers cost in Watford

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Watford, as reported by local LeadsDoWork members.

Bricklayers installation cost in Watford 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in September 2024

Bricklayers Projects in Watford in August 2024

3,979

Requests for quotations in Watford in August 2024

0

Requests for Bricklayers quotations in Watford in August 2024. 0% change from July 2024.

0

Requests for Bricklayers quotations in Hertfordshire in August 2024. 0% change from July 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Watford August 2024

Watford

The town and borough of Watford, in Hertfordshire, is only eighteen miles north west of central London and inside the M25 boundaries. However, the borough is kept independent from the Greater London region, but its sizeable population of 80,000 nevertheless provides it a density of 9,600 individuals per square mile. Included in the Watford postcode district are nearby areas Croxley Green, Rickmansworth, Carpenders Park and South Oxhey. To get the best house enhancement quotes from respected companies in Watford, you'll want to make use of our totally free and effortless service.

Looking for Bricklayers in Watford?

Get free quotes from local builders

Get free quotes

Bricklayers pros in Watford

JM Fencing and Landscaping

89 review(s)
Based: in Farnham, GU10 1FD

Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening and Fencing. We pride ourselves in offering a prompt, efficient service and are always conscious of our customers needs. I alw...

Latest review

Sam L., RG14
5

Building work | Bricklaying in Newbury

Excellent - came on time, always very punctual. Did an excellent job, very tidy, cleaned up thoroughly afterwards. I wou...

Similar Customer Enquiries for Bricklayers in Watford

30 Dec

Building work | Bricklaying

Watford - WD25

Enquiry from: Maria M

Start Date: 1 to 3 months

30foot breeze block wall to build have blocks already Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Medium job Do you req...

Post a similar request >

16 Feb

Building work | Bricklaying

Watford - WD25

Enquiry from: John C

Start Date: Immediate

Extension around 110m2 of block required Please contact to appoint

Post a similar request >

19 Aug

Building work | Bricklaying

High Wycombe - HP13

Enquiry from: Mohammad S

Start Date: Immediate

Bricklayers Lead

approximately 30 metres of block wall in rear garden with pillars for fence to slot in are you the property owner: owner of the property property type: detached how much work would you say needs to be...

Post a similar request >

05 May

Building work | Bricklaying

Chalfont St. Giles - HP8

Enquiry from: Angus M

Start Date: Immediate

we are the main contractor on the project to demolish and rebuild the above. we have a requirement for a blockwork contractor within the next 10 days we would like to it local are you the property ow...

Post a similar request >

07 Dec

Building work | Bricklaying

Berkhamsted - HP4

Enquiry from: David B

Start Date: Immediate

i need a quote for an insurance claim. the end of a low wall along my drive has been dislodged and needs to be re-instated. this is a small job - only about a dozen bricks but with a power cable for a...

Post a similar request >

10 Oct

Building work | Bricklaying

Slough - SL2

Enquiry from: Nina H

Start Date: Immediate

various brick work needed are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to be supplied to...

Post a similar request >

22 Sep

Building work | Bricklaying

Chesham - HP5

Enquiry from: Michael H

Start Date: Immediate

build a new 9 inch garden wall approximately 50m long and 18 bricks high with pillars every 5m. i will clear the existing hedge and dig foundations and supply all materials but would like you to suppl...

Post a similar request >

20 May

Building work | Bricklaying

High Wycombe - HP10

Enquiry from: Anna R

Start Date: Immediate

garden retaining wall (eight bricks high) 7.5m x 5.5m to incorporate a small raised patio 2.5 x 2.3m. the wall is on a slope and the area is to be backfilled with soil for bedding plants. are you the...

Post a similar request >

31 May

Building work | Bricklaying

High Wycombe - HP15

Enquiry from: Stephen C

Start Date: 1 to 3 months

To install a metal handrail alongside 20 steps to my house and to repoint and recement some of the bricks on the steps and wall alongside (plus small area of repointing - about one quarter sq meter ...

Post a similar request >

03 Sep

Building work | Bricklaying

Berkhamsted - HP4

Enquiry from: S

Start Date: Immediate

Bricklayer required to complete a double garage project - rear wall and side wall each 6m long by 2.7m high (bungalow) with 100mm cavity. Mixed London yellow stock bricks external and standard block i...

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Watford

Get free, no-obligation quotes from 4 verified Builders working in Watford.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Placholder Image

Other Top Projects in Watford

Are you a builder in Watford?

We can help you get more Bricklayers work and boost your business.

Join today