Bricklaying in Northwood

Request Bricklaying Prices in Northwood

Home > General Building Projects > Bricklayers > Northwood

Bricklaying in Northwood

Extensions will require brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For some conversions, the garage door is infilled and a solid wall with one or two windows is added to the front or side of your home.

 

This solid wall requires foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the exterior brickwork walls, they will require supplemental insulation. This is usually done with the addition of interior wall insulation like insulated plasterboard, or by adding another layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. In addition, if the walls are shared with a neighbour, the brickwork will have to adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the home.

 

Unlike many ideas, a bricklayer actually does more than laying of bricks. There's more to being a bricklayer than you can possibly think about. A solitary bricklaying projects calls for a large selection of abilities. Let's have a look at these skills!

  • Using moist resistant materials to secure foundations.
  • Spreading out mortar in between joints and applying them to act as a thick layer binding the bricks with each other in rows.
  • Checking out as well as functioning from requirements along with strategies.
  • Dealing with brick-cutting machines.
  • Taking charge and taking care of concrete blocks or bricks, clay bricks and the sort.
  • Construction of scaffolding - based on belongings of some licenses in some states.

This is not simply an cosmetic decision, as matching existing brickwork could be a requirement of planning permission or building regulations in your area. We will give up to four Bricklayers pros locally, that will provide quotes for the work you desire done. You'll obtain a home visit from specialists in Northwood that'll help you to pick the best Bricklayers for your residence prior to carrying out the installation. Enter your postal code to begin browsing now.

Average Bricklayers cost in Northwood

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Northwood, as reported by local LeadsDoWork members.

Bricklayers installation cost in Northwood 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in March 2025

Bricklayers Projects in Northwood in February 2025

365

Requests for quotations in Northwood in February 2025

0

Requests for Bricklayers quotations in Northwood in February 2025. 0% change from January 2025.

0

Requests for Bricklayers quotations in Middlesex in February 2025. 0% change from January 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Northwood February 2025

Northwood

Northwood is an elevated domestic settlement in the London Borough of Hillingdon adjacent Ruislip Woods National Nature Reserve and which shares a northern border with Hertfordshire. According to records compiled by the Office for National Statistics in 2008, the town has a permanent population of around 11068. A triangular region of Northwood including the old High Street, Chester Road and Hallowell Road is a place of Local Architectural Special Interest, which is a restriction to preserve the elaborate Victorian houses made from high quality brickwork. Dotted around the area are 22 noted buildings for their architecture. Northwood provides an abundance of social and leisure opportunities for its inhabitants. The town is home to a broad selection of independent and commercial chain services where citizens can shop, eat and consume. In 2012, a new community centre on the town's high street, replacing an older building, was officially opened by the regional MP Nick Hurd in September 2012. The new building was called the Kate Fassnidge Community Centre after the Uxbridge landowner who contributed some of her land to the borough, and replaced a run-down dining club that had originally been a Ritz cinema. Each May, one of the largest Scout Jumble sales in the nation is held by 1st Northwood on the land next to their headquarters, the Hogs Back. The Northwood Hills public house (formerly referred to as the Northwood Hills Hotel) opposite the underground station is accredited as where Sir Elton John first performed professionally. A photograph of the pub appears on one of his album covers. Northwood is additionally known as the location used for filming the Goods' and Leadbetters' homes and surrounding streets in the BBC TV situation comedy series 'The Good Life'. For all of your home remodelings, be sure to find dependable professionals in Northwood to make certain of quality.

Looking for Bricklayers in Northwood?

Get free quotes from local builders

Get free quotes

Bricklayers pros in Northwood

JM Fencing and Landscaping

89 review(s)
Based: in Farnham, GU10 1FD

Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening and Fencing. We pride ourselves in offering a prompt, efficient service and are always conscious of our customers needs. I alw...

Latest review

Sam L., RG14
5

Building work | Bricklaying in Newbury

Excellent - came on time, always very punctual. Did an excellent job, very tidy, cleaned up thoroughly afterwards. I wou...

Similar Customer Enquiries for Bricklayers in Northwood

07 Apr

Building work | Bricklaying

Northwood - HA6

Enquiry from: Deepa P

Start Date: Immediate

Wall to front of property call to appoint

Post a similar request >

07 Jan

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Mark A

Start Date: Immediate

mr requested quotes for building maintenance from a builder around welwyn. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below...

Post a similar request >

19 Aug

Building work | Bricklaying

High Wycombe - HP13

Enquiry from: Mohammad S

Start Date: Immediate

Bricklayers Lead

approximately 30 metres of block wall in rear garden with pillars for fence to slot in are you the property owner: owner of the property property type: detached how much work would you say needs to be...

Post a similar request >

25 Feb

Building work | Bricklaying

Windsor - SL4

Enquiry from: Richard C

Start Date: Immediate

new garden wall required to replace garden fence. 23m long x 2.3m high. mini digger access. other side of wall can be plain, due adjacent to commercial building. are you the property owner: owner of ...

Post a similar request >

08 Sep

Building work | Bricklaying

Windsor - SL4

Enquiry from: Murray H

Start Date: Immediate

job 1. take down and remove existing wall. replace with. 9" brick wall 12 ft long 4 ft height 1 pier on end .topped with brick on edge. heather's. approx 900 bricks. lay on existing good footing. job...

Post a similar request >

29 Aug

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Nicola H

Start Date: Immediate

repairs to rendered garden wall. garden wall and posts need topping with brick design following removal of wrought iron structures. are you the property owner: owner of the property property type: det...

Post a similar request >

01 Jun

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Trevor D

Start Date: Less than one month

customer made an online enquiry for bricklaying and confirmed on email they would like a call with a builder to discuss prices.please call to arrange an appointment to quote. are you the property owne...

Post a similar request >

26 May

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Andrew S

Start Date: Immediate

we have planning permission for a l-shaped wrap around ground floor only extension. would be interested in a quote for the footings and brickwork as well as knowing your availability. we are expecting...

Post a similar request >

05 May

Building work | Bricklaying

Chalfont St. Giles - HP8

Enquiry from: Angus M

Start Date: Immediate

we are the main contractor on the project to demolish and rebuild the above. we have a requirement for a blockwork contractor within the next 10 days we would like to it local are you the property ow...

Post a similar request >

03 Dec

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Monta B

Start Date: Immediate

hello, i am working for a company called property care specialists and we are starting works on this huge 4 bedroom house to fully renovate it and also build a new garage on a side of the house. we ar...

Post a similar request >

10 Oct

Building work | Bricklaying

Slough - SL2

Enquiry from: Nina H

Start Date: Immediate

various brick work needed are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to be supplied to...

Post a similar request >

22 Sep

Building work | Bricklaying

Chesham - HP5

Enquiry from: Michael H

Start Date: Immediate

build a new 9 inch garden wall approximately 50m long and 18 bricks high with pillars every 5m. i will clear the existing hedge and dig foundations and supply all materials but would like you to suppl...

Post a similar request >

20 May

Building work | Bricklaying

High Wycombe - HP10

Enquiry from: Anna R

Start Date: Immediate

garden retaining wall (eight bricks high) 7.5m x 5.5m to incorporate a small raised patio 2.5 x 2.3m. the wall is on a slope and the area is to be backfilled with soil for bedding plants. are you the...

Post a similar request >

22 Dec

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Julian F

Start Date: Immediate

I am in the process of building a house with a turn key builder. However there are certain jobs which are not covered, such as installing external steps, finalising the slab, building a drive, landsc...

Post a similar request >

25 Jun

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: John B

Start Date: Immediate

minor stitching under the rear bathroom upstairs window

Post a similar request >

31 May

Building work | Bricklaying

High Wycombe - HP15

Enquiry from: Stephen C

Start Date: 1 to 3 months

To install a metal handrail alongside 20 steps to my house and to repoint and recement some of the bricks on the steps and wall alongside (plus small area of repointing - about one quarter sq meter ...

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Northwood

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Northwood.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

What is the ratio of sand and cement for bricklaying?

When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.

Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.

Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Placholder Image

Other Top Projects in Northwood

Customer Reviews

Overall rating:


Northwood Bricklayers installers are rated 4.1 out of 5 based on 11 reviews of 84 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Northwood Bricklayers contractors

Are you a builder in Northwood?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today