Bricklaying in West Molesey

Obtain Bricklaying Prices in West Molesey

Home > General Building Projects > Bricklayers > West Molesey

Bricklaying in West Molesey

Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For some conversions, the garage door is infilled and a brick wall with a couple of windows is put into the front or side of the home.

 

This brick wall will require foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the exterior brickwork walls, they will likely require additional insulation. This is usually achieved with the addition of interior wall insulation like insulated plasterboard, or with the addition of another layer of brickwork to create a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork will have to adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the house.

 

As opposed to many beliefs, a bricklayer really does greater than laying of bricks. There's even more to being a bricklayer than you can probably think of. A single bricklaying jobs needs a wide range of abilities. Let's take a look at these abilities!

  • Utilizing moist resistant materials to secure foundations.
  • Spreading mortar in between joints and also using them to serve as a thick layer binding the bricks with each other in rows.
  • Reviewing as well as working from specs along with plans.
  • Collaborating with brick-cutting makers.
  • Taking charge and also caring for cement blocks or blocks, clay bricks as well as the sort.
  • Building of scaffolding - subject to ownership of some licenses in some states.

This is not merely an cosmetic choice, as coordinating with existing brickwork might be a condition of planning permission or building regulations in your area. We will provide approximately four Bricklayers pros in your area, who will provide quotations for the work you want done. You'll receive a property visit from professionals in West Molesey who'll aid you to pick the ideal Bricklayers for your house prior to executing the installation. Enter your postcode to begin searching currently.

Average Bricklayers cost in West Molesey

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for West Molesey, as reported by local LeadsDoWork members.

Bricklayers installation cost in West Molesey 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in January 2025

Bricklayers Projects in West Molesey in December 2024

1,219

Requests for quotations in West Molesey in December 2024

0

Requests for Bricklayers quotations in West Molesey in December 2024. 0% change from November 2024.

0

Requests for Bricklayers quotations in Surrey in December 2024. 0% change from November 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near West Molesey December 2024

West Molesey

West Molesey is a big village in in the rural district of Molesey on the edge of Greater London in England. It lies on the southerly bank of the River Thames in the northeast of the district of Elmbridge in Surrey. As of 1933, the Urban District of East and West Molesey came to be an area in the Esher Urban District, and in 1974, after the City Government Act of 1972 came into result, the area merged with the Walton as well as Weybridge Urban District to create the new district of Elmbridge. The town can be located around 11.7 miles and 13.5 miles from Charing Cross as well as following to the various other huge town, East Molesey, and it is a part of the capital's adjoining suburban areas that creates the Greater London Urban Area. According to the 2011 Census, it is a location with a long-term population of around 19,088. Before 1200, the prefixes East as well as West Molesey were not made use of, and there was just one parish based around what is understood today as East Molesey. Issue was voiced by regional citizens for several months in between 2015 and 2016 when it was seen that there went to the very least 30 unclaimed equines ashore, and also two of the horses were eliminated by a van. There is a variety of leisure as well as social opportunities to be located in the town. West Molesey shares a high street with East Molesey, and there are numerous members' clubs, including 'The Europa', 'The Lord Hotham', 'The Cannon' as well as 'The Royal Oak'. West Molesey is additionally residence to Molesey F.C., which currently plays in the Combined Counties League Premier Division. For all of your residence upgrades, see to it to use trustworthy experts in West Molesey to ensure of high quality.

Looking for Bricklayers in West Molesey?

Get free quotes from local builders

Get free quotes

Bricklayers pros in West Molesey

JM Fencing and Landscaping

89 review(s)
Based: in Farnham, GU10 1FD

Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening and Fencing. We pride ourselves in offering a prompt, efficient service and are always conscious of our customers needs. I alw...

Latest review

Sam L., RG14
5

Building work | Bricklaying in Newbury

Excellent - came on time, always very punctual. Did an excellent job, very tidy, cleaned up thoroughly afterwards. I wou...

TC Construction

3 review(s)
Based: in Surrey, SM7 3HG

Are you looking for a driveway that offers something different? With expertise in high quality surfacing, TC Construction can help you get the look that you want. Domestic and commercial asphalting service With more than 30 years of experience,...

Latest review

Brian C., KT4
4

Building work | Bricklaying in Worcester Park

They were quick to communicate and came to look at the job quickly which is great

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in West Molesey

Get free, no-obligation local bricklayers quotes from 4 verified builders working in West Molesey.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

Placholder Image

Other Top Projects in West Molesey

Customer Reviews

Overall rating:


West Molesey Bricklayers installers are rated 4.1 out of 5 based on 16 reviews of 85 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All West Molesey Bricklayers contractors

Are you a builder in West Molesey?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today