Bricklaying in Chalfont St Giles

Request Bricklaying Prices in Chalfont St Giles

Home > General Building Projects > Bricklayers > Chalfont St Giles

Bricklaying in Chalfont St Giles

Extensions will require brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of the property.

 

This solid wall will need foundations or lintel supports which might or might not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the outer brickwork walls, they'll require additional insulation. Normally, this is achieved by adding interior wall insulation like insulated plasterboard, or by adding a supplementary layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. In addition, if any of the walls are shared with a neighbouring property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.

 

Unlike lots of ideas, a bricklayer actually does greater than laying of bricks. There's even more to being a bricklayer than you can probably think about. A single bricklaying projects needs a broad selection of skills. Allow's look at these skills!

  • Utilizing wet resistant materials to seal foundations.
  • Spreading mortar between joints and also using them to function as a thick layer binding the blocks together in rows.
  • Reviewing and also functioning from specifications as well as plans.
  • Dealing with brick-cutting equipments.
  • Taking charge as well as taking care of cement blocks or bricks, clay bricks as well as the likes.
  • Building and construction of scaffolding - based on possession of some licenses in some states.

This is not merely an visual choice, as matching existing brickwork is possibly a requirement of planning permission or building regulations in your area. We will supply as much as four Bricklayers pros locally, that will offer quotations for the job you desire done. You'll receive a property visit from professionals in Chalfont St Giles that'll help you to choose the best Bricklayers for your home prior to accomplishing the installment. Enter your postcode to begin looking currently.

Average Bricklayers cost in Chalfont St Giles

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Chalfont St Giles, as reported by local LeadsDoWork members.

Bricklayers installation cost in Chalfont St Giles 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in January 2025

Bricklayers Projects in Chalfont St Giles in December 2024

191

Requests for quotations in Chalfont St Giles in December 2024

0

Requests for Bricklayers quotations in Chalfont St Giles in December 2024. 0% change from November 2024.

0

Requests for Bricklayers quotations in Buckinghamshire in December 2024. 0% change from November 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Chalfont St Giles December 2024

Chalfont St Giles

Chalfont St Giles is a town and civil parish within the Chiltern district in south eastern Buckinghamshire, England, on the edge of the Chilterns, 20.9 miles (33.6 kilometres) west-north-west of Charing Cross, central London, and near Seer Green, Jordans, Chalfont St Peter, Little Chalfont as well as Amersham. Chalfont means chalk springtime, in reference to the water carrying abilities of the local terrain. The village has a pond that is fed by the River Misbourne. In 2009, the village was granted the European Diploma of the Council of Europe in recognition of its initiatives to circulate the concept of European unity.

Looking for Bricklayers in Chalfont St Giles?

Get free quotes from local builders

Get free quotes

Bricklayers pros in Chalfont St Giles

JM Fencing and Landscaping

89 review(s)
Based: in Farnham, GU10 1FD

Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening and Fencing. We pride ourselves in offering a prompt, efficient service and are always conscious of our customers needs. I alw...

Latest review

Sam L., RG14
5

Building work | Bricklaying in Newbury

Excellent - came on time, always very punctual. Did an excellent job, very tidy, cleaned up thoroughly afterwards. I wou...

Similar Customer Enquiries for Bricklayers in Chalfont St Giles

05 May

Building work | Bricklaying

Chalfont St. Giles - HP8

Enquiry from: Angus M

Start Date: Immediate

we are the main contractor on the project to demolish and rebuild the above. we have a requirement for a blockwork contractor within the next 10 days we would like to it local are you the property ow...

Post a similar request >

07 Jan

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Mark A

Start Date: Immediate

mr requested quotes for building maintenance from a builder around welwyn. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below...

Post a similar request >

19 Aug

Building work | Bricklaying

High Wycombe - HP13

Enquiry from: Mohammad S

Start Date: Immediate

Bricklayers Lead

approximately 30 metres of block wall in rear garden with pillars for fence to slot in are you the property owner: owner of the property property type: detached how much work would you say needs to be...

Post a similar request >

12 Apr

Building work | Bricklaying

Aylesbury - HP22

Enquiry from: Paul H

Start Date: Immediate

part rebuild front retaining wall are you the property owner: owner of the property property type: detached how much work would you say needs to be done: small job do you require the bricks to be supp...

Post a similar request >

29 Aug

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Nicola H

Start Date: Immediate

repairs to rendered garden wall. garden wall and posts need topping with brick design following removal of wrought iron structures. are you the property owner: owner of the property property type: det...

Post a similar request >

12 Aug

Building work | Bricklaying

Marlow - SL7

Enquiry from: Yasemin G

Start Date: Immediate

2 storey extension build, brickwork and exterior plaster. are you the property owner: relative of owner property type: detached how much work would you say needs to be done: lots of work do you requir...

Post a similar request >

01 Jun

Building work | Bricklaying

Princes Risborough - HP27

Enquiry from: Christian C

Start Date: Immediate

the slab on the top of the chimney has broken on the corners and need repair. possible remove and re-brick. photo can be provided. are you the property owner: owner of the property property type: de...

Post a similar request >

01 Jun

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Trevor D

Start Date: Less than one month

customer made an online enquiry for bricklaying and confirmed on email they would like a call with a builder to discuss prices.please call to arrange an appointment to quote. are you the property owne...

Post a similar request >

26 May

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Andrew S

Start Date: Immediate

we have planning permission for a l-shaped wrap around ground floor only extension. would be interested in a quote for the footings and brickwork as well as knowing your availability. we are expecting...

Post a similar request >

03 Dec

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Monta B

Start Date: Immediate

hello, i am working for a company called property care specialists and we are starting works on this huge 4 bedroom house to fully renovate it and also build a new garage on a side of the house. we ar...

Post a similar request >

04 Aug

Building work | Bricklaying

Aylesbury - HP21

Enquiry from: Jack P

Start Date: Immediate

front porch extension & garden wall lights are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: medium job do you require the br...

Post a similar request >

20 May

Building work | Bricklaying

High Wycombe - HP10

Enquiry from: Anna R

Start Date: Immediate

garden retaining wall (eight bricks high) 7.5m x 5.5m to incorporate a small raised patio 2.5 x 2.3m. the wall is on a slope and the area is to be backfilled with soil for bedding plants. are you the...

Post a similar request >

22 Dec

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: Julian F

Start Date: Immediate

I am in the process of building a house with a turn key builder. However there are certain jobs which are not covered, such as installing external steps, finalising the slab, building a drive, landsc...

Post a similar request >

25 Jun

Building work | Bricklaying

Maidenhead - SL6

Enquiry from: John B

Start Date: Immediate

minor stitching under the rear bathroom upstairs window

Post a similar request >

31 May

Building work | Bricklaying

High Wycombe - HP15

Enquiry from: Stephen C

Start Date: 1 to 3 months

To install a metal handrail alongside 20 steps to my house and to repoint and recement some of the bricks on the steps and wall alongside (plus small area of repointing - about one quarter sq meter ...

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Chalfont St Giles

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Chalfont St Giles.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

Placholder Image

Other Top Projects in Chalfont St Giles

Customer Reviews

Overall rating:


Chalfont St Giles Bricklayers installers are rated 4.2 out of 5 based on 8 reviews of 58 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Chalfont St Giles Bricklayers contractors

Are you a builder in Chalfont St Giles?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today