J Alexander Building and Maintenance
Based: in Barking, IG11 9JNLatest review
G., IG6
Building work | Bricklaying in Ilford
He is very keen
Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of the house.
This brick wall requires foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, so the new brickwork wall should take this into consideration. Depending on the current thickness of the external brickwork walls, they will require supplemental insulation. Normally, this is achieved with the addition of internal wall insulation like insulated plasterboard, or by adding a supplementary layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork will have to adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.
As opposed to several ideas, a bricklayer really does more than laying of blocks. There's more to being a bricklayer than you can most likely think of. A single bricklaying projects needs a wide variety of skills. Allow's look at these skills!
This is not merely an visual choice, as complementing existing brickwork is possibly a condition of planning permission or building regulations in your area. We will supply approximately four Bricklayers pros in your area, that will certainly provide quotations for the work you want done. You'll get a property visit from specialists in Dartford who'll help you to choose the appropriate Bricklayers for your home before accomplishing the installation. Enter your postal code to begin looking now.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Dartford in October 2024
Requests for Bricklayers quotations in Dartford in October 2024. 0% change from September 2024.
Requests for Bricklayers quotations in Kent in October 2024. 0% change from September 2024.
Dartford is a sizeable town in Kent and most renowned for being the gateway to London from the southeast, with both the Dartford bridge and Dartford Crossing connecting to the M25. The town about the edge of the capital city contains a populace of 85,911 with only 2.2% unemployed; lower than the nationwide average. For your personal property developments in the Dartford region, you'll want to employ reliable specialists in the town.
He is very keen
Dartford - DA2
Enquiry from: Kelly G
Start Date: Immediate
front garden wall rebuilt. measurements are 1 metre 800 length by 500 high with plymth 340 by 340 and 1 metre high. plus debris taken away property type: terrace how much work would you say needs to b...
London - SW16
Enquiry from: Mohamed H
Start Date: Immediate
removal of a load bearing wall to create a larger kitchen/diner and a 4m hole to be created in garden wall to accommodate bi fold doors. are you the property owner: owner of the property property type...
London - SW16
Enquiry from: Justin P
Start Date: Immediate
Our front garden wall requires rebuilding, it is short 9” thick, we would like a quote for both of the following options; option 1 rebuilt, rendered, painted white with two sets of black railings in...
London - SW9
Enquiry from: F
Start Date: Immediate
There are a couple of cracks in the front of the building that have been there for several years. I would like quotations on getting this repaired please
London - SW8
Enquiry from: P
Start Date: Immediate
Hi, Need a quote for a wall repair in the garden, had damp issues. Wall is 5m x 5m, no material will be provided, need it within next 3 weeks. Thanks!
Answer a few quick questions, so we can match you with professionals who can help.
Get free, no-obligation quotes from 4 verified Builders working in Dartford.
Compare customer reviews, services and prices, and choose the right professional for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.
As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.
It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.
Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
We can help you get more Bricklayers work and boost your business.
Join today