Wooden Decking in Talybont

Request Wooden Decking Prices in Talybont

Home > Gardening & Landscaping Projects > Wooden decking > Talybont

Wooden Decking in Talybont

Wooden decking is an increasingly fashionable choice for providing outdoor seating areas in gardens. Because of the natural beauty of wood, they can be very elegant spaces that can be used year round with the addition of outside heating and lighting. Wooden decking is frequently fitted in locations in front of patio or French doors where they can create a seamless transition between interior and exterior spaces. Wooden decking is available in any size or shape to complement any area. Curved designs or large areas linked by pathways can produce a striking effect. Wooden decking is reasonably simple to install and causes minimal disruption, particularly in comparison to other possibilities like patio or paving. It can even be installed over the top of an existing patio. It is critical however to be certain that your wooden decking is structurally sound and able to take the weight of any furniture or plants that you want to use on the decking. There is a collection of types of wood that can be used in wooden decking. Normally decking is made of hardwood, but there are softwoods available that fulfil the durability requirements. As hardwood decking will demand maintenance, which generally entails yearly cleaning and staining for weather proofing, composite woods are becoming more popular for use in wooden decking as they are stronger and require much less maintenance.

Average Wooden decking cost in Talybont

The typical cost of Wooden decking is £1500. Costs can change based upon the materials and the firm hired. The upper price range can be as high as £1725. The material costs are commonly approximately £375

Average price per Wooden decking job in 2024

Avg. price low

Avg. price low
£1,125

Avg. price

Avg. price
£1,500

Avg. price high

Avg. price high
£1,725

£1900

£1425

£950

£475

£0

Prices based on actual Wooden decking costs for Talybont, as reported by local LeadsDoWork members.

Wooden decking installation cost in Talybont 2024

Labour cost £1,050
Material cost £375
Waste removal £75
Time frame: 1-4 days

Wooden decking searches in September 2024

Wooden decking Projects in Talybont in August 2024

78

Requests for quotations in Talybont in August 2024

0

Requests for Wooden decking quotations in Talybont in August 2024. 0% change from July 2024.

0

Requests for Wooden decking quotations in Gwynedd in August 2024. 0% change from July 2024.

Source: Numbers calculated based on the search volumes in major search engines

Wooden decking searches in cities and towns near Talybont August 2024

Talybont

Tal-y-Bont is a small town in Conwy County Borough, Wales as well as lies in the Conwy Valley, west of the River Conwy, on the B5106 road, 6 miles from the community of Conwy to the north, as well as 6 miles from Llanrwst to the south, and also in the neighborhood of Caerhun. It exists adjacent to the town of Dolgarrog to the south, as well as below the tiny negotiation of Llanbedr-y-Cennin to the west. The 'Bont' (the mutated kind of pont, Welsh for "bridge") in the name most likely refers to the bridge over the Afon Dulyn, a tributary of the close-by River Conwy, which runs through the village. Tal-y-Bont is the beginning point for the roadway to Llyn Eigiau and the southerly Carneddau mountains. Accessibility to the northern end of the Carneddau Range and also the Roman road over to Aberystwyth can additionally be attained by complying with the road up from Tal-y-Bont through Llanbedr-y-Cennin - which gets on the eastern edge of the Snowdonia National Forest - and also taking a left fork at the club, Ye Olde Bull Inn, in Llanbedr. Pedestrians can access peaks in the north end of the Carneddau Range such as Drum and Foel Fras, and then continue south eastern to get to Carnedd Llewelyn.

Looking for Wooden decking in Talybont?

Get free quotes from local carpenters

Get free quotes

Similar Customer Enquiries for Wooden decking in Talybont

28 Mar

Garden | Decking

Talybont - LL43

Enquiry from: Nigel M

Start Date: Immediate

Decking for static thaks

Post a similar request >

23 Apr

Garden | Decking

Blaenau Ffestiniog - LL41

Enquiry from: Terry L

Start Date: Immediate

Supply and fit wooden decking approx. 4m x 3.6m

Post a similar request >

22 May

Garden | Decking

Criccieth - LL52

Enquiry from: Hugh J

Start Date: Immediate

Are you the property owner: Owner of the property Property Type: Detached Time scale: Immediate Other Forms: None Please call to appoint

Post a similar request >

How it works

Tell us about your Wooden decking project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Carpenters in Talybont

Get free, no-obligation quotes from 4 verified Carpenters working in Talybont.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much is decking?
How much decking costs depends on the type of material you go for, how big you want your decking to be and where you live in the country. But typically, the cost of decking is between £1,200 - £1,800. The most popular material for decking is pre-treated softwood, which will set you back around £1,000 for 15m2. Hardwood is more expensive but is more durable, and will cost approximately £2,000 for the same amount. Homeowners are also beginning to choose composite decking, which is made from recycled plastic and wood fibres, and is low-maintenance and eco-friendly. This will cost around £1,600 for 15m2, while uPVC which is also a low-maintenance option costs around £600. People tend to choose composite over uPVC because it looks more like natural timber. If you’re a competent DIYer, you might want to have a go at laying decking yourself which will set you back around £1,000 for a standard softwood timber deck. We think it’s worth paying the extra £600 for a professional to lay your decking, since they will be able to do it much more quickly. If you do want to try it yourself, we recommend leaving at least a whole weekend open to do it, but it’s likely to take you longer. Factor in the possibility of having to take time off work to complete it and it might be more cost-effective to leave it to the pros.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
Placholder Image

Other Top Projects in Talybont

Are you a carpenter in Talybont?

We can help you get more Wooden decking work and boost your business.

Join today