- If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
- Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
- Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
- Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
- Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Borth
Borth, is a village as well as seaside hotel 7 miles (11 kilometres) north of Aberystwyth in Ceredigion, Mid Wales, on the Ceredigion Coast Path. The population was 1,399 in 2011. Borth has a sandy beach as well as is a vacation seaside resort. There is a youth hostel in the town and caravan as well as outdoor camping websites close by. In 2011 work commenced on the initial phase of the £12 million seaside protection plan along the Borth to Ynyslas coast, which was ended up in 2015.