Building work | Bricklaying
Whitley Bay - NE25
Enquiry from: Rob D
Start Date: Immediate
I need three to four layers of brickwork added to the top of my chimney using a brick matching that of our house.
Extensions will require brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For some conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of the house.
This solid wall will require foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, so the new brickwork wall should take this into account. Depending on the current thickness of the outer brickwork walls, they will require extra insulation. This is usually done by adding interior wall insulation like insulated plasterboard, or with the addition of an extra layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if any of the walls are shared with a neighbour, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.
Contrary to numerous ideas, a bricklayer actually does more than laying of blocks. There's more to being a bricklayer than you can possibly think about. A solitary bricklaying tasks calls for a broad array of abilities. Allow's look at these skills!
This is not just an aesthetic choice, as coordinating with existing brickwork is possibly a condition of planning permission or building regulations in your area. We will provide as much as 4 Bricklayers pros in your area, that will offer quotations for the work you desire done. You'll get a home visit from experts in Whitley Bay who'll help you to select the best Bricklayers for your residence before accomplishing the installation. Enter your postcode to start searching now.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Whitley Bay in November 2024
Requests for Bricklayers quotations in Whitley Bay in November 2024. 0% change from October 2024.
Requests for Bricklayers quotations in Tyne And Wear in November 2024. 0% change from October 2024.
The North Tyneside town on Whitley Bay is a seashore resort and popular holiday destination for those who are in the North East and Scotland. The town has a population of 36,544 and its golden sandy beach stretches from St Mary's Island to the Cullercoats. For house improvements in Whitley Bay, be sure to employ experts locally to ensure a competitive price.
Whitley Bay - NE25
Enquiry from: Rob D
Start Date: Immediate
I need three to four layers of brickwork added to the top of my chimney using a brick matching that of our house.
Whitley Bay - NE25
Enquiry from: Richard E
Start Date: Immediate
approximately 300 bricks to lay after storm blew existing wall over. site is clean and tidy ready for work to begin. bricks / sand and cement would need to be ordered are you the property owner: ow...
Whitley Bay - NE25
Enquiry from: Jon A
Start Date: Immediate
brick up garage form window opening. blocks and brick and other materials on site are you the property owner: owner of the property how much work would you say needs to be done: small job do you requi...
Chester le Street - DH3
Enquiry from: John O
Start Date: 1 to 3 months
brick gatepost repair/rebuild are you the property owner: owner of the property property type: detached what type of work do you need to have done: brick work do you have the materials you need in or...
Gateshead - NE9
Enquiry from: Gareth E
Start Date: Immediate
stone and mortar dividing wall in back yard has partially collapsed, need a quote to reinstate are you the property owner: owner of the property property type: terrace how much work would you say need...
Washington - NE38
Enquiry from: John A
Start Date: Immediate
remove old boundary fencing, replace with brick pillers and partcial fence panels. are you the property owner: owner of the property property type: detached how much work would you say needs to be don...
Washington - NE38
Enquiry from: Rita M
Start Date: Immediate
brickwork in arch over porch door has started to slip. porch is single storey with about 3 courses of brick over the arch and under a flat roof. i think the arch will need rebuilding. are you the prop...
Gateshead - NE9
Enquiry from: Kathleen K
Start Date: Immediate
replacing a stone wall with bricks. wall is the outside wall in a rear yard. are you the property owner: owner of the property do you require the bricks to be supplied too: yes how much work would yo...
Sunderland - SR5
Enquiry from: Erika L
Start Date: Immediate
front garden wall approx 20ft long are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to be su...
Chester le Street - DH3
Enquiry from: Sharon L
Start Date: Immediate
repair to internal bedroom wall are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: medium job do you require the bricks to be suppli...
Sunderland - SR3
Enquiry from: Alan T
Start Date: Less than one month
Alteration to external and internal wall on kitchen and roof to change shape layout of kitchen Are you the property owner: Owner of the property Property Type: Terrace Do you require the bricks to be ...
Sunderland - SR4
Enquiry from: DAVID J
Start Date: Less than one month
I am looking to improve the boarder wall at the front and back of my property, also i need a wall built between my property and the house next door at the front of my house. I would like metal railin...
Answer a few quick questions, so we can match you with professionals who can help.
Get free, no-obligation quotes from 4 verified Builders working in Whitley Bay.
Compare customer reviews, services and prices, and choose the right professional for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.
As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.
It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.
Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.
We can help you get more Bricklayers work and boost your business.
Join today