Bricklaying in West Calder

Get Bricklaying Prices in West Calder

Home > General Building Projects > Bricklayers > West Calder

Bricklaying in West Calder

Extensions will require brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is put into the front or side of the home.

 

This solid wall will require foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the exterior brickwork walls, they might require supplemental insulation. Normally, this is done with the addition of interior wall insulation like insulated plasterboard, or by adding another layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbour's property, the brickwork will have to adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the house.

 

Unlike numerous ideas, a bricklayer really does greater than laying of blocks. There's more to being a bricklayer than you can most likely consider. A solitary bricklaying tasks needs a broad range of abilities. Let's have a look at these abilities!

  • Making use of damp resistant materials to secure foundations.
  • Spreading out mortar between joints as well as applying them to work as a thick layer binding the bricks with each other in rows.
  • Reading and also functioning from specs along with strategies.
  • Dealing with brick-cutting makers.
  • Taking charge and caring for concrete blocks or bricks, clay bricks as well as the likes.
  • Construction of scaffolding - based on belongings of some licenses in some states.

This is not merely an cosmetic choice, as complementing existing brickwork is possibly a condition of planning permission or building regulations in your area. We will offer approximately four Bricklayers pros locally, that will certainly use quotes for the job you want done. You'll obtain a property visit from professionals in West Calder that'll help you to select the appropriate Bricklayers for your residence prior to carrying out the setup. Enter your postal code to begin searching currently.

Average Bricklayers cost in West Calder

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for West Calder, as reported by local LeadsDoWork members.

Bricklayers installation cost in West Calder 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in March 2025

Bricklayers Projects in West Calder in February 2025

126

Requests for quotations in West Calder in February 2025

0

Requests for Bricklayers quotations in West Calder in February 2025. 0% change from January 2025.

0

Requests for Bricklayers quotations in West Lothian in February 2025. 0% change from January 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near West Calder February 2025

West Calder

West Calder is a community in West Lothian, Scotland, located 4 miles west of Livingston. The town was a crucial centre for the oil shale economic climate in the 19th and also 20th Centuries. West Calder has its own train station. The surrounding towns that take the town's name in their address - Polbeth, Addiewell, Loganlea, Harburn and also Westwood - describe the location that this community incorporates, and they all have played a vital part in the background of the town in addition to West Lothian. It is likewise one of the most northward centre of the Dogs Trust, closely adhered to by the brand-new centre at Glasgow. The community is a 10-minute drive from Livingston, which is host to two big shopping centres.

Looking for Bricklayers in West Calder?

Get free quotes from local builders

Get free quotes

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in West Calder

Get free, no-obligation local bricklayers quotes from 4 verified builders working in West Calder.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

Placholder Image

Other Top Projects in West Calder

Customer Reviews

Overall rating:


West Calder Bricklayers installers are rated 4.7 out of 5 based on 2 reviews of 21 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All West Calder Bricklayers contractors

Are you a builder in West Calder?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today