Bricklaying in Bonnyrigg

Request Bricklaying Prices in Bonnyrigg

Home > General Building Projects > Bricklayers > Bonnyrigg

Bricklaying in Bonnyrigg

Extensions will usually demand brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For some conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of the house.

 

This solid wall will demand foundations or lintel supports which might or might not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they will likely require additional insulation. Normally, this is achieved with the addition of internal wall insulation like insulated plasterboard, or with the addition of an additional layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbour, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.

 

As opposed to many ideas, a bricklayer in fact does greater than laying of bricks. There's more to being a bricklayer than you can possibly consider. A single bricklaying tasks calls for a wide array of abilities. Let's look at these skills!

  • Using damp resistant materials to seal structures.
  • Spreading mortar in between joints and also applying them to work as a thick layer binding the bricks together in rows.
  • Reviewing and also functioning from specifications as well as plans.
  • Dealing with brick-cutting equipments.
  • Taking charge and also taking care of concrete blocks or blocks, clay blocks and the likes.
  • Building and construction of scaffolding - based on possession of some licenses in some states.

This is not just an aesthetic decision, as matching existing brickwork is potentially a requirement of planning permission or building regulations in your area. We will give approximately 4 Bricklayers pros in your area, that will supply quotes for the work you want done. You'll receive a property visit from specialists in Bonnyrigg who'll assist you to select the ideal Bricklayers for your house prior to executing the installation. Enter your postcode to begin searching currently.

Average Bricklayers cost in Bonnyrigg

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Bonnyrigg, as reported by local LeadsDoWork members.

Bricklayers installation cost in Bonnyrigg 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in February 2025

Bricklayers Projects in Bonnyrigg in January 2025

535

Requests for quotations in Bonnyrigg in January 2025

0

Requests for Bricklayers quotations in Bonnyrigg in January 2025. 0% change from December 2024.

0

Requests for Bricklayers quotations in Midlothian in January 2025. 0% change from December 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Bonnyrigg January 2025

Bonnyrigg

Bonnyrigg, a town in the county Midlothian, Scotland, is home to around 16,000 residents, with the measured permanent population estimates at approximately 15,850. It is situated 8 miles southeast of Edinburgh , which means the town is inside a well-connected settlement. Bonnyrigg is a town that's twinned with Saint-Cyr-l'Ecole, France, meaning that the town also has international links. Other variations of the town's name create discrepancies over the origins of the settlement, disputed across maps over different time periods; 'Bonnebrig' in William Roy's maps of 1750, 'Bannockrigg' in 1763 and in 1817 it was first referred to as Bonny Ridge, altering progressively into what the town is known as now. Bonnyrigg presently is positioned along the B704 and also the A6094, with both roads crossing at the Bonnyrigg Toll, turning it into a well accessible location to travel. A populated bus service has also reduced congestion and helped transport about the area. Even so, most notably and lately, the reopening of the Border Railway in 2015 has reconnected the town to the national rail network, at a station one mile away at Eskbank. Religion is a large part of the community spirit of Bonnyrigg, and is served by several denominations of the church; the Church of Scotland congregations may be located in Cockpen and the Carrington Parish Church to the south, but in addition the Bonnyrigg Parish Church in the town centre. However, the nearby Catholic church is 'Our Lady Of Consolation' near to the town centre. Bonnyrigg is also home to many nearby athletics clubs; Lasswade Rugby Football Club, founded in 1921, in addition to a golf course, Broomknowe, an 18-hole course with a par of 70. For all of your house improvements, make certain that you select reliable pros in Bonnyrigg to make sure you get the very best quality service.

Looking for Bricklayers in Bonnyrigg?

Get free quotes from local builders

Get free quotes

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Bonnyrigg

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Bonnyrigg.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Placholder Image

Other Top Projects in Bonnyrigg

Customer Reviews

Overall rating:


Bonnyrigg Bricklayers installers are rated 4.7 out of 5 based on 2 reviews of 21 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Bonnyrigg Bricklayers contractors
Garden wall construction with London Heather bricks in Crawley Published: 22/01/2025 Looking to complete a garden wall construction in Crawley? Learn about the materials, process, and cost-effective options for your bricklaying project. Read this article
Garden wall repair and repointing in West Bromwich Published: 23/11/2024 Repair of two garden walls and repointing of a third wall needed for a terrace home in West Bromwich. Includes supply of new bricks and waste removal. Learn more about the process and costs. Read this article
General maintenance and water damage repair in Downpatrick Published: 21/02/2025 Need general maintenance and water damage repair for an apartment in Downpatrick? Learn about the best repair methods and costs involved. Read this article

Are you a builder in Bonnyrigg?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today