Building work | Bricklaying
Torquay - TQ1
Enquiry from: David M
Start Date: Immediate
Convert old bathroom, toilet and bedroom into 1 large bathroom suite
Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For some conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of your home.
This brick wall will need foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into account. Depending on the current thickness of the outer brickwork walls, they might require additional insulation. This is usually done with the addition of interior wall insulation like insulated plasterboard, or with the addition of another layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. In addition, if any of the walls are shared with a neighbour, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.
In contrast to numerous ideas, a bricklayer actually does more than laying of blocks. There's more to being a bricklayer than you can most likely think of. A single bricklaying projects calls for a wide selection of abilities. Let's look at these skills!
This is not merely an aesthetic decision, as complementing existing brickwork might be a condition of planning permission or building regulations in your area. We will supply as much as 4 Bricklayers pros in your area, that will offer quotations for the job you want done. You'll get a home visit from experts in Torquay who'll assist you to pick the best Bricklayers for your home prior to carrying out the installment. Enter your postal code to start looking currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Torquay in March 2025
Requests for Bricklayers quotations in Torquay in March 2025. 0% change from February 2025.
Requests for Bricklayers quotations in Devon in March 2025. 0% change from February 2025.
Torquay possesses a populace of 63,988 and is a seaside town inside the ceremonial county of Devon in England's southwest. The town is placed 22 miles south of Exeter and is also inside the unitary authority of Torbay. A 2001 review affirmed the town's reputation as a retirement region, with 26% of the population aged over 60. No matter what home improvements you're looking for in the Torquay area, make sure you use vetted and respected business experts to get the right price and a top quality finish.
Torquay - TQ1
Enquiry from: David M
Start Date: Immediate
Convert old bathroom, toilet and bedroom into 1 large bathroom suite
Brixham - TQ5
Enquiry from: Des H
Start Date: Immediate
Concrete block walls =carport
Exmouth - EX8
Enquiry from: Raymond B
Start Date: Immediate
a blockwork retaining wall at the end of my garden replacing an old dilapidated wall. 9m long and 1.7 high. property type: detached how much work would you say needs to be done: medium job do you requ...
Budleigh Salterton - EX9
Enquiry from: Terri P
Start Date: Immediate
we need two brick pillars on our driveway (to mount new electric gates). we are keen the brickwork is in keeping with our house - built 1920s - probably designed by hatchard smith. are you the prope...
Brixham - TQ5
Enquiry from: Sandra B
Start Date: Immediate
patio outside wall unstable after the removal of recent ivy, the present wall has nothing stable to sit on and is crumbling are you the property owner: owner of the property property type: terrace do ...
Paignton - TQ3
Enquiry from: Shaun B
Start Date: Immediate
Dig out approx 180tonnes of soil & remove stairs leading up to property, build retaining walls with bare block work and construct new staircase leading up to property. I’ll gravel base of driveway m...
Newton Abbot - TQ12
Enquiry from: Martin B
Start Date: 1 to 3 months
Just a bricklayer needed got all the Materials xx xx Block and bricklay a U shape retainer wall 141inches long 130 inches with Are you the property owner: Tenant (with permissi...
Exmouth - EX8
Enquiry from: John S
Start Date: Immediate
need 5 metres of cavity trays fitting.... scaffolding in place, my bricky has been delayed.
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Torquay.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.
Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!
• Using damp resistant materials to seal foundations.
• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.
• Reading and working from specifications as well as plans.
• Working with brick-cutting machines.
• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.
• Construction of scaffolding - subject to possession of some licenses in some states.
A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.
A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:
• Ability to work at heights and outdoors
• Enjoy practical work
• Technical aptitude
• Good hand-eye coordination
• Independent and yet a team player too
• Top physical fitness
• Attitude and attendance.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today