Building work | Bricklaying
Torquay - TQ1
Enquiry from: David M
Start Date: Immediate
Convert old bathroom, toilet and bedroom into 1 large bathroom suite
Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For some conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of your home.
This brick wall will need foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into account. Depending on the current thickness of the outer brickwork walls, they might require additional insulation. This is usually done with the addition of interior wall insulation like insulated plasterboard, or with the addition of another layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. In addition, if any of the walls are shared with a neighbour, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.
In contrast to numerous ideas, a bricklayer actually does more than laying of blocks. There's more to being a bricklayer than you can most likely think of. A single bricklaying projects calls for a wide selection of abilities. Let's look at these skills!
This is not merely an aesthetic decision, as complementing existing brickwork might be a condition of planning permission or building regulations in your area. We will supply as much as 4 Bricklayers pros in your area, that will offer quotations for the job you want done. You'll get a home visit from experts in Torquay who'll assist you to pick the best Bricklayers for your home prior to carrying out the installment. Enter your postal code to start looking currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Torquay in October 2024
Requests for Bricklayers quotations in Torquay in October 2024. 0% change from September 2024.
Requests for Bricklayers quotations in Devon in October 2024. 0% change from September 2024.
Torquay possesses a populace of 63,988 and is a seaside town inside the ceremonial county of Devon in England's southwest. The town is placed 22 miles south of Exeter and is also inside the unitary authority of Torbay. A 2001 review affirmed the town's reputation as a retirement region, with 26% of the population aged over 60. No matter what home improvements you're looking for in the Torquay area, make sure you use vetted and respected business experts to get the right price and a top quality finish.
Torquay - TQ1
Enquiry from: David M
Start Date: Immediate
Convert old bathroom, toilet and bedroom into 1 large bathroom suite
Brixham - TQ5
Enquiry from: Des H
Start Date: Immediate
Concrete block walls =carport
Exmouth - EX8
Enquiry from: Raymond B
Start Date: Immediate
a blockwork retaining wall at the end of my garden replacing an old dilapidated wall. 9m long and 1.7 high. property type: detached how much work would you say needs to be done: medium job do you requ...
Budleigh Salterton - EX9
Enquiry from: Terri P
Start Date: Immediate
we need two brick pillars on our driveway (to mount new electric gates). we are keen the brickwork is in keeping with our house - built 1920s - probably designed by hatchard smith. are you the prope...
Brixham - TQ5
Enquiry from: Sandra B
Start Date: Immediate
patio outside wall unstable after the removal of recent ivy, the present wall has nothing stable to sit on and is crumbling are you the property owner: owner of the property property type: terrace do ...
Paignton - TQ3
Enquiry from: Shaun B
Start Date: Immediate
Dig out approx 180tonnes of soil & remove stairs leading up to property, build retaining walls with bare block work and construct new staircase leading up to property. I’ll gravel base of driveway m...
Newton Abbot - TQ12
Enquiry from: Martin B
Start Date: 1 to 3 months
Just a bricklayer needed got all the Materials xx xx Block and bricklay a U shape retainer wall 141inches long 130 inches with Are you the property owner: Tenant (with permissi...
Exmouth - EX8
Enquiry from: John S
Start Date: Immediate
need 5 metres of cavity trays fitting.... scaffolding in place, my bricky has been delayed.
Answer a few quick questions, so we can match you with professionals who can help.
Get free, no-obligation quotes from 4 verified Builders working in Torquay.
Compare customer reviews, services and prices, and choose the right professional for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.
Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.
Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.
We can help you get more Bricklayers work and boost your business.
Join today