Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.