Bricklaying in Stafford

Find Bricklaying Prices in Stafford

Home > General Building Projects > Bricklayers > Stafford

Bricklaying in Stafford

Extensions will usually demand brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is put into the front or side of the property.

 

This brick wall will demand foundations or lintel supports which may or may not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into account. Depending on the current thickness of the external brickwork walls, they'll require supplemental insulation. Normally, this is done with the addition of interior wall insulation like insulated plasterboard, or with the addition of an extra layer of brickwork to create a cavity wall. These options are again dependent on the existing garage foundations. In addition, if any of the walls are shared with a neighbouring property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the house.

 

Contrary to numerous beliefs, a bricklayer really does greater than laying of blocks. There's more to being a bricklayer than you can probably think of. A solitary bricklaying jobs requires a large selection of abilities. Let's take a look at these abilities!

  • Making use of damp resistant materials to secure foundations.
  • Spreading mortar between joints and applying them to work as a thick layer binding the blocks with each other in rows.
  • Reading and also working from requirements as well as plans.
  • Working with brick-cutting devices.
  • Taking charge and also caring for concrete blocks or blocks, clay blocks as well as the likes.
  • Building and construction of scaffolding - subject to belongings of some licenses in some states.

This is not only an cosmetic decision, as coordinating with existing brickwork is potentially a condition of planning permission or building regulations in your area. We will give approximately four Bricklayers pros in your area, who will use quotes for the job you want done. You'll receive a property visit from professionals in Stafford that'll assist you to pick the ideal Bricklayers for your residence prior to carrying out the installment. Enter your postal code to start searching currently.

Average Bricklayers cost in Stafford

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Stafford, as reported by local LeadsDoWork members.

Bricklayers installation cost in Stafford 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in September 2024

Bricklayers Projects in Stafford in August 2024

2,305

Requests for quotations in Stafford in August 2024

0

Requests for Bricklayers quotations in Stafford in August 2024. 0% change from July 2024.

0

Requests for Bricklayers quotations in Staffordshire in August 2024. 0% change from July 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Stafford August 2024

Stafford

Stafford is the county town of Staffordshire and situated in the West Midlands district next to the M6 motorway. The town, having a populace of 55,700, is the fourth premier settlement within the county, behind Stoke, Tamworth and Newcastle under Lyme. For the property developments you're thinking of in the Stafford region, make sure you only make use of a vetted and reputable trade specialist in order to guarantee an excellent price for any work you wish concluded.

Looking for Bricklayers in Stafford?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Stafford

10 Aug

Building work | Bricklaying

Stafford - ST17

Enquiry from: Beth K

Start Date: 1 to 3 months

underpinning to right side corner of detached single garage and moving of a soak away drain to prevent further subsidence. are you the property owner: owner of the property property type: detached wha...

Post a similar request >

20 Nov

Building work | Bricklaying

Stafford - ST17

Enquiry from: Tara L

Start Date: Immediate

arch repair and repointing are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job do you require the bricks to be supplied to...

Post a similar request >

27 Jul

Building work | Bricklaying

Stafford - ST16

Enquiry from: Mike C

Start Date: Immediate

help to design (not essential) and then build outdoor kitchen area using reclaimed victorian bricks, to include plumbing for belfast sink and electric power and lighting, on a newly built patio area a...

Post a similar request >

28 Nov

Building work | Bricklaying

Stafford - ST17

Enquiry from: Aziz M

Start Date: Immediate

brick and block work to be used in extension project are you the property owner: tenant (with permission) property type: commercial how much work would you say needs to be done: medium job do you requ...

Post a similar request >

23 Oct

Building work | Bricklaying

Stafford - ST21

Enquiry from: Malcolm M

Start Date: Immediate

building a brick wall 25-30ft long, 4 bricks high to replace wooden sleepers enclosing soil borders against stone wall footings below fence panels. are you the property owner: owner of the property ho...

Post a similar request >

29 Mar

Building work | Bricklaying

Stafford - ST16

Enquiry from: Elliot B

Start Date: Immediate

Brick up half gagged door and fit window Are you the property owner: Owner of the property Property Type: Detached How much work would you say needs to be done: Medium job Do you require the bricks to...

Post a similar request >

18 Apr

Building work | Bricklaying

Walsall - WS3

Enquiry from: Barbara T

Start Date: Immediate

repair to front garden wall are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: small job do you require the bricks to be suppl...

Post a similar request >

12 Feb

Building work | Bricklaying

Wolverhampton - WV6

Enquiry from: Harmit P

Start Date: Immediate

single storey extension, build walls, roof. internal walls need knocking and steels to be put in are you the property owner: owner of the property property type: detached how much work would you say n...

Post a similar request >

08 Jul

Building work | Bricklaying

Burntwood - WS7

Enquiry from: Carol D

Start Date: 1 to 3 months

side and front pointing bottom and top render printed are you the property owner: owner of the property what type of work do you need to have done: brick work, painting time scale: 1-3 months do you h...

Post a similar request >

27 Jun

Building work | Bricklaying

Wolverhampton - WV6

Enquiry from: Amandeep K

Start Date: Immediate

underpinning a bay window are you the property owner: owner of the property what type of work do you need to have done: brick work do you have the materials you need in order for the job required to b...

Post a similar request >

19 Feb

Building work | Bricklaying

Cannock - WS12

Enquiry from: Ian S

Start Date: 1 to 3 months

Works limited to external landscape of building. To include building of a series of low garden walls to frontage, widening existing steps, building of 4no. brick piers (height of 1200mm). Making good ...

Post a similar request >

04 Jul

Building work | Bricklaying

Wolverhampton - WV11

Enquiry from: Joanne C

Start Date: 1 to 3 months

need bricklayers to complete works to a knew project which is apartment blocks we are paying £650 per thousand facing bricks 100mm blockwork £17.50 m2 paying extras for sundries Are you the prop...

Post a similar request >

08 Jun

Building work | Bricklaying

Wolverhampton - WV11

Enquiry from: Dawn P

Start Date: 1 to 3 months

Need garden wall building to 2 sides of the property. 3 foot in height. Are you the property owner: Owner of the property Property Type: Detached How much work would you say needs to be done: Medium ...

Post a similar request >

09 May

Building work | Bricklaying

Walsall - WS3

Enquiry from: Walter C

Start Date: Immediate

Pilers for the gate Are you the property owner: Owner of the property Do you require the bricks to be supplied too: No Time scale: Immediate

Post a similar request >

03 Oct

Building work | Bricklaying

Walsall - WS3

Enquiry from: Andrew T

Start Date: Immediate

I need 3 internal door lintels fitted ASAP Are you the property owner: Owner of the property Property Type: Terrace How much work would you say needs to be done: Small job Do you require the bricks t...

Post a similar request >

25 May

Building work | Bricklaying

Wolverhampton - WV6

Enquiry from: Lewis P

Start Date: Immediate

new garage build in reclaimed brick and tile job ready to start. Are you the property owner: Owner of the property Property Type: Detached How much work would you say needs to be done: Small job Do ...

Post a similar request >

24 Mar

Building work | Bricklaying

Wolverhampton - WV11

Enquiry from: June J

Start Date: Immediate

Home owner Would like a small wall built to separate patio from lawned area. Length approx 20 feet Supplied and Fitted Time scale immediate Contact to Appoint

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Stafford

Get free, no-obligation quotes from 4 verified Builders working in Stafford.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

Placholder Image

Other Top Projects in Stafford

Are you a builder in Stafford?

We can help you get more Bricklayers work and boost your business.

Join today