Bricklaying in Ramsgate

Find Bricklaying Prices in Ramsgate

Home > General Building Projects > Bricklayers > Ramsgate

Bricklaying in Ramsgate

Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of the property.

 

This solid wall requires foundations or lintel supports which may or may not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into account. Depending on the current thickness of the outer brickwork walls, they may require additional insulation. Normally, this is achieved with the addition of internal wall insulation like insulated plasterboard, or by adding an additional layer of brickwork to create a cavity wall. These options are again reliant on the existing garage foundations. In addition, if any of the walls are shared with a neighbour, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.

 

As opposed to several ideas, a bricklayer actually does more than laying of bricks. There's more to being a bricklayer than you can possibly think of. A solitary bricklaying projects requires a large selection of abilities. Let's have a look at these skills!

  • Making use of damp resistant materials to secure structures.
  • Spreading out mortar in between joints and using them to function as a thick layer binding the blocks together in rows.
  • Checking out and also functioning from specifications in addition to strategies.
  • Collaborating with brick-cutting equipments.
  • Taking charge and caring for concrete blocks or blocks, clay blocks and also the sort.
  • Construction of scaffolding - subject to property of some licenses in some states.

This is not simply an cosmetic decision, as matching existing brickwork is possibly a condition of planning permission or building regulations in your area. We will offer as much as 4 Bricklayers pros in your area, that will certainly use quotations for the job you desire done. You'll obtain a property visit from experts in Ramsgate who'll assist you to choose the best Bricklayers for your residence prior to carrying out the installment. Enter your postcode to start looking currently.

Average Bricklayers cost in Ramsgate

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Ramsgate, as reported by local LeadsDoWork members.

Bricklayers installation cost in Ramsgate 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in February 2025

Bricklayers Projects in Ramsgate in January 2025

873

Requests for quotations in Ramsgate in January 2025

0

Requests for Bricklayers quotations in Ramsgate in January 2025. 0% change from December 2024.

0

Requests for Bricklayers quotations in Kent in January 2025. 0% change from December 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Ramsgate January 2025

Ramsgate

Ramsgate is a town in the Thanet area of east Kent, situated in South East England having a populace of 39,639. Ramsgate is a seaside town and a part of the historical confederation of Cinque Ports. As a result, Ramsgate's main attraction is the coast and industries include tourism and fishing. For any property upgrades you may well be considering soon, don't forget to make use of reputable businesses in Ramsgate to get the best price for the work you need completed.

Looking for Bricklayers in Ramsgate?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Ramsgate

19 Sep

Building work | Bricklaying

Ramsgate - CT11

Enquiry from: Marian P

Start Date: Immediate

Repointing along the ground level of a side wall and raising of an existing air brick, also adding an extra air brick further along.

Post a similar request >

08 Jul

Building work | Bricklaying

Ramsgate - CT11

Enquiry from: Gerard B

Start Date: 1 to 3 months

repointing work on end of terrace house are you the property owner: owner of the property property type: terrace what type of work do you need to have done: brick work do you have the materials you n...

Post a similar request >

18 Jul

Building work | Bricklaying

Herne Bay - CT6

Enquiry from: Phil K

Start Date: Immediate

2 brick pillars for heavy driveway gates approximat*** 1inch square *** 6inch high, reinforced.

Post a similar request >

01 Nov

Building work | Bricklaying

Herne Bay - CT6

Enquiry from: Angela W

Start Date: Immediate

step needs sorting out very disabled daughter needs to use entrance but the door keeps catching the bricks so difficult for her need help please are you the property owner: owner of the property prope...

Post a similar request >

20 May

Building work | Bricklaying

Canterbury - CT1

Enquiry from: Jo T

Start Date: Immediate

finish an incompleted job to get a garden office to roof height in order for phase 2 carpentry electrics etc to begin. current bricklayer has left the job with a day's work still to do. are you the p...

Post a similar request >

15 May

Building work | Bricklaying

Sandwich - CT13

Enquiry from: Chibuike E

Start Date: Immediate

brick up external leaf of new porch extension 2m by 4m are you the property owner: owner of the property property type: detached how much work would you say needs to be done: small job do you require ...

Post a similar request >

29 Mar

Building work | Bricklaying

Broadstairs - CT10

Enquiry from: Kevin H

Start Date: Immediate

Rebuild front garden wall with Flint insert Are you the property owner: Owner of the property Property Type: Detached How much work would you say needs to be done: Small job Do you require the brick...

Post a similar request >

24 Mar

Building work | Bricklaying

Canterbury - CT2

Enquiry from: Michael F

Start Date: Immediate

Require standard size outside door bricked up approx 130 bricks Are you the property owner: Owner of the property Property Type: Detached How much work would you say needs to be done: Minor works Do ...

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Ramsgate

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Ramsgate.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Placholder Image

Other Top Projects in Ramsgate

Customer Reviews

Overall rating:


Ramsgate Bricklayers installers are rated 0 out of 5 based on 0 reviews of 11 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Ramsgate Bricklayers contractors
Garden wall construction with London Heather bricks in Crawley Published: 22/01/2025 Looking to complete a garden wall construction in Crawley? Learn about the materials, process, and cost-effective options for your bricklaying project. Read this article
Garden wall repair and repointing in West Bromwich Published: 23/11/2024 Repair of two garden walls and repointing of a third wall needed for a terrace home in West Bromwich. Includes supply of new bricks and waste removal. Learn more about the process and costs. Read this article
General maintenance and water damage repair in Downpatrick Published: 21/02/2025 Need general maintenance and water damage repair for an apartment in Downpatrick? Learn about the best repair methods and costs involved. Read this article

Are you a builder in Ramsgate?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today