Bricklaying in North West

Compare Bricklaying Prices in North West

Home > General Building Projects > Bricklayers > North West

Bricklaying in North West

Extensions will require brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For most conversions, the garage door is infilled and a brick wall with a couple of windows is added to the front or side of the home.

 

This brick wall will demand foundations or lintel supports which may or may not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they will likely require extra insulation. This is usually done with the addition of internal wall insulation like insulated plasterboard, or by adding another layer of brickwork to create a cavity wall. These options are again reliant on the existing garage foundations. In addition, if any of the walls are shared with a neighbour, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.

 

In contrast to many beliefs, a bricklayer actually does more than laying of bricks. There's more to being a bricklayer than you can most likely consider. A solitary bricklaying jobs requires a wide variety of skills. Let's have a look at these skills!

  • Utilizing damp resistant materials to seal structures.
  • Spreading mortar between joints and also applying them to function as a thick layer binding the blocks with each other in rows.
  • Reading as well as working from requirements in addition to plans.
  • Dealing with brick-cutting equipments.
  • Taking charge as well as taking care of cement blocks or bricks, clay bricks and the likes.
  • Building of scaffolding - subject to possession of some licenses in some states.

This is not simply an aesthetic decision, as complementing existing brickwork is potentially a condition of planning permission or building regulations in your area. We will offer as much as four Bricklayers pros in your area, that will certainly provide quotations for the work you want done. You'll get a property visit from experts in North West that'll help you to pick the right Bricklayers for your residence prior to performing the installation. Enter your postcode to start browsing currently.

Average Bricklayers cost in North West

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for North West, as reported by local LeadsDoWork members.

Bricklayers installation cost in North West 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in January 2025

Bricklayers Projects in North West in December 2024

152,668

Requests for quotations in North West in December 2024

0

Requests for Bricklayers quotations in North West in December 2024. 0% change from November 2024.

0

Requests for Bricklayers quotations in United Kingdom in December 2024. 0% change from November 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in counties near North West December 2024

North West

The North West of England is one of England's 9 regions and carries a population of over 7 million people. This makes it the country's third largest region by population and gives it a population density of 497 people for every square kilometre. Within the region are the counties of Cumbria, Lancashire, Greater Manchester, Merseyside and Cheshire. The foremost cities of Manchester (553,000), Liverpool (498,000), and Preston (142,000), are the biggest city parts in the region. More than a third of the population live within the Greater Manchester area also. For home developments in the North East region of England, get quotes from reliable firms to ensure you get the best quality finish at a great price.

Looking for Bricklayers in North West?

Get free quotes from local builders

Get free quotes

Bricklayers pros in North West

JM Fencing and Landscaping

89 review(s)
Based: in Farnham, GU10 1FD

Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening and Fencing. We pride ourselves in offering a prompt, efficient service and are always conscious of our customers needs. I alw...

Latest review

Sam L., RG14
28th December 2020
5

Building work | Bricklaying in Newbury

Excellent - came on time, always very punctual. Did an excellent job, very tidy, cleaned up thoroughly afterwards. I wou...

Similar Customer Enquiries for Bricklayers in North West

17 Dec

Building work | Bricklaying

Manchester - M32

Enquiry from: Hayley W

Start Date: Immediate

Rebuild of the bottom garden wall. Quote initially with work to be carried out next year. Dimensions roughly 3.5x1.8metres

Post a similar request >

22 Oct

Building work | Bricklaying

Liverpool - L31

Enquiry from: Sandra B

Start Date: Immediate

New shopfront wall approx 3 foot high

Post a similar request >

17 Oct

Building work | Bricklaying

Stockport - SK3

Enquiry from: Ve G

Start Date: Immediate

the first course of brick on my single brick 21' garage, have crumbled because, they had render on them. i need the remaining brick smoothed and rendered with concrete if possible i have a short v...

Post a similar request >

21 Jul

Building work | Bricklaying

Kirkby Stephen - CA17

Enquiry from: Paul C

Start Date: Immediate

Take down a dry stone wall and build again Making room for a parking area.

Post a similar request >

19 Jul

Building work | Bricklaying

Preston - PR3

Enquiry from: John E

Start Date: Immediate

to demolish 11 m2 of 9" brick wall (built 1981) - presently leaning - and to clean-off bricks and rebuild in english garden wall bond. the site is located near the withy trees in fulwood

Post a similar request >

12 Jul

Building work | Bricklaying

Wirral - CH49

Enquiry from: Liam G

Start Date: Immediate

i am writing to see if this company is hiring any apprentices this september

Post a similar request >

10 Jul

Building work | Bricklaying

Prenton - CH43

Enquiry from: Barry C

Start Date: Immediate

IAM a bricklayer 26years experience and just inquiring if you are looking for any bricklayers? I've got a full driving licence an own tools, thank you for taking the time to read this.

Post a similar request >

21 May

Building work | Bricklaying

Ellesmere Port - CH66

Enquiry from: Nayde M

Start Date: Immediate

Garden wall for back garden.

Post a similar request >

10 May

Building work | Bricklaying

Preston - PR2

Enquiry from: John E

Start Date: Immediate

leaning wall (between garages) needs to be taken down and rebuilt plumb. are you the property owner: owner of the property property type: other how much work would you say needs to be done: small job...

Post a similar request >

10 Apr

Building work | Bricklaying

Wirral - CH62

Enquiry from: Jennifer R

Start Date: Immediate

Driveway wall hit by car - needs rebuilding

Post a similar request >

28 Mar

Building work | Bricklaying

Birkenhead - CH41

Enquiry from: Mike C

Start Date: Immediate

138 MTRS blockwork, block , mortar, insulation supplied. Job is in prenton. Rear extension, followed by double storey side extension in block, followed by sma*** storey extension in brickwork. Thanks ...

Post a similar request >

31 Oct

Building work | Bricklaying

Neston - CH64

Enquiry from: Philip J

Start Date: Immediate

We have a single story extension that requires approx 8 coping stones going on top of a staggered wall. Would you be interesting in coming to have a look and give us a price? Thanks

Post a similar request >

26 Sep

Building work | Bricklaying

Wirral - CH46

Enquiry from: Debbie O

Start Date: 1 to 3 months

customer has a general building project they are looking to have done, specially they want quotes for bricklaying. they are unsure of options so would like to discuss with a builder.confirmed interest...

Post a similar request >

10 Sep

Building work | Bricklaying

Macclesfield - SK11

Enquiry from: Michal P

Start Date: Immediate

Bricklayers Lead Bricklayers Lead Bricklayers Lead

i have about 16 bricks that need to be replaced. they are at the bottom, almost all in a single row, a few elsewhere but still in the bottom row. also about 4-6 bricks that need repointing. i'm curiou...

Post a similar request >

23 Aug

Building work | Bricklaying

Wirral - CH47

Enquiry from: Paul V

Start Date: Immediate

hi, i have a single garage that i want to extend with block. i will be doing the joinery etc - just need the brickwork doing, cheers, paul are you the property owner: owner of the property property ty...

Post a similar request >

17 Aug

Building work | Bricklaying

Northwich - CW9

Enquiry from: Sylvia C

Start Date: Less than one month

Bricklayers Lead

remove old render, make good bricks and silicone/k render in buttermilk to sw wall of property are you the property owner: owner of the property what type of work do you need to have done: brick work ...

Post a similar request >

08 Aug

Building work | Bricklaying

Chester - CH3

Enquiry from: James B

Start Date: Immediate

repointing, small job half a day. are you the property owner: owner of the property property type: commercial how much work would you say needs to be done: small job do you require the bricks to be s...

Post a similar request >

14 Jul

Building work | Bricklaying

Ellesmere Port - CH65

Enquiry from: Debbie A

Start Date: Immediate

repointing to part of small semi detached house how much work would you say needs to be done: lots of work property type: commercial

Post a similar request >

05 Jul

Building work | Bricklaying

Wirral - CH46

Enquiry from: Adam P

Start Date: Immediate

our front garden wall is about to collapse and will require a new wall. are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: sm...

Post a similar request >

22 Jun

Building work | Bricklaying

Wirral - CH62

Enquiry from: Claire J

Start Date: Immediate

Fix wobbly broken wall front garden

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in North West

Get free, no-obligation local bricklayers quotes from 4 verified builders working in North West.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

What is the ratio of sand and cement for bricklaying?

When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.

Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.

Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.

Placholder Image

Other Top Projects in North West

Customer Reviews

Overall rating:


North West Bricklayers installers are rated 4.2 out of 5 based on 17 reviews of 94 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All North West Bricklayers contractors

Are you a builder in North West?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today