Bricklaying in Holywood

Obtain Bricklaying Prices in Holywood

Home > General Building Projects > Bricklayers > Holywood

Bricklaying in Holywood

Extensions will require brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of your home.

 

This solid wall will need foundations or lintel supports which may or may not already be present under the existing door. Often the window will not be a full width to match the existing garage door, so the new brickwork wall will need to take this into account. Depending on the current thickness of the exterior brickwork walls, they will require supplemental insulation. Normally, this is achieved by adding internal wall insulation like insulated plasterboard, or by adding an extra layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbouring property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.

 

As opposed to numerous ideas, a bricklayer really does greater than laying of blocks. There's more to being a bricklayer than you can most likely think of. A solitary bricklaying jobs calls for a broad array of abilities. Let's look at these abilities!

  • Utilizing wet resistant materials to secure structures.
  • Spreading mortar between joints and using them to serve as a thick layer binding the bricks with each other in rows.
  • Reviewing and also functioning from specifications along with plans.
  • Dealing with brick-cutting equipments.
  • Taking charge and also caring for concrete blocks or bricks, clay blocks and the likes.
  • Construction of scaffolding - based on belongings of some licenses in some states.

This is not merely an aesthetic decision, as coordinating with existing brickwork is potentially a condition of planning permission or building regulations in your area. We will supply up to 4 Bricklayers pros in your area, who will certainly offer quotes for the work you desire done. You'll get a home visit from specialists in Holywood who'll help you to select the ideal Bricklayers for your residence prior to performing the setup. Enter your postal code to begin looking currently.

Average Bricklayers cost in Holywood

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Holywood, as reported by local LeadsDoWork members.

Bricklayers installation cost in Holywood 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in November 2024

Bricklayers Projects in Holywood in October 2024

295

Requests for quotations in Holywood in October 2024

0

Requests for Bricklayers quotations in Holywood in October 2024. 0% change from September 2024.

0

Requests for Bricklayers quotations in County Down in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Holywood October 2024

Holywood

Holywood is a town in the urban region of Belfast in County Down, Northern Ireland. It is a civil parish and townland comprising 755 acres resting on the coast of Belfast Lough, between Belfast and Bangor. Holywood Urban Area is labelled as a medium town within the Belfast Metropolitan Urban Area (BMUA) by the Northern Ireland Statistics and Research Agency, with the 2001 Census recording a permanent population of 12037. Within this population, around 20 per cent are aged under 16 years of age and 21 per cent were aged 60 and over. 50.6 per cent of the population is male and 49.4 percent is female. The railway line from Belfast to Holywood arrived in 1848, and this brought about rapid development. This development, in conjunction with that of close-by towns and villages along the coastal strip to Bangor, required the development of the Holywood Bypass in the early 1970s. The town is a popular residential region and is noted for its fashionable shops, boutiques, arts and crafts. Holywood is most well-known for its maypole at the crossroads in the centre of town. Its origin stays rather uncertain, however, in accordance with local tradition, it derives from 1700, when a Dutch ship is said to have run aground on the shore close by, and the crew put up the broken mast to demonstrate their gratitude of the help offered to them by the townsfolk. The maypole continues to be in routine use for dancing at the annual May Day fair. The town also holds an annual jazz and blues festival. There are a number of sporting possibilities in Holywood, being home to football clubs, golf clubs, cricket clubs and a sports association. For all your home upgrades, make certain to make use of dependable experts in Holywood to make certain of quality.

Looking for Bricklayers in Holywood?

Get free quotes from local builders

Get free quotes

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Holywood

Get free, no-obligation quotes from 4 verified Builders working in Holywood.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What is the ratio of sand and cement for bricklaying?

When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.

Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.

Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Placholder Image

Other Top Projects in Holywood

Are you a builder in Holywood?

We can help you get more Bricklayers work and boost your business.

Join today