Bricklaying in Exeter

Obtain Bricklaying Prices in Exeter

Home > General Building Projects > Bricklayers > Exeter

Bricklaying in Exeter

Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a brick wall with one or two windows is put into the front or side of the home.

 

This solid wall requires foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the external brickwork walls, they will likely require supplemental insulation. This is usually done with the addition of interior wall insulation like insulated plasterboard, or with the addition of an extra layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. In addition, if the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.

 

As opposed to numerous beliefs, a bricklayer really does greater than laying of bricks. There's even more to being a bricklayer than you can possibly think of. A solitary bricklaying jobs calls for a broad range of abilities. Let's take a look at these skills!

  • Making use of wet resistant materials to seal structures.
  • Spreading mortar between joints and also applying them to work as a thick layer binding the blocks with each other in rows.
  • Checking out as well as working from specifications along with plans.
  • Working with brick-cutting devices.
  • Taking charge and taking care of concrete blocks or blocks, clay bricks as well as the sort.
  • Construction of scaffolding - subject to belongings of some licenses in some states.

This is not only an visual choice, as matching existing brickwork is possibly a condition of planning permission or building regulations in your area. We will supply approximately 4 Bricklayers pros in your area, that will certainly supply quotes for the work you desire done. You'll get a property visit from specialists in Exeter that'll assist you to pick the best Bricklayers for your house prior to accomplishing the setup. Enter your postcode to start browsing currently.

Average Bricklayers cost in Exeter

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Exeter, as reported by local LeadsDoWork members.

Bricklayers installation cost in Exeter 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in November 2024

Bricklayers Projects in Exeter in October 2024

5,296

Requests for quotations in Exeter in October 2024

0

Requests for Bricklayers quotations in Exeter in October 2024. 0% change from September 2024.

0

Requests for Bricklayers quotations in Devon in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Exeter October 2024

Exeter

Exeter is found the county of Devon, to the south west of England with a population just over 111,000. Current structures in Exeter capture loads of the UK's well known eras, from the Celtic and Saxon periods, to the Georgian and Victorian. With a wide range of properties there's always the necessity for improving and we have got specialists to suit all trades.

Looking for Bricklayers in Exeter?

Get free quotes from local builders

Get free quotes

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Exeter

Get free, no-obligation quotes from 4 verified Builders working in Exeter.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

What is the ratio of sand and cement for bricklaying?

When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.

Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.

Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

Placholder Image

Other Top Projects in Exeter

Are you a builder in Exeter?

We can help you get more Bricklayers work and boost your business.