Wooden Decking in Lifton

Find Wooden Decking Prices in Lifton

Home > Gardening & Landscaping Projects > Wooden decking > Lifton

Wooden Decking in Lifton

Wooden decking is an increasingly prevalent option for providing outdoor seating areas in gardens. Due to the natural beauty of wood, they can be very fashionable spaces that can be used year round by using external heating and lighting. Wooden decking is usually fitted in locations in front of patio or French doors where they can create a smooth transition between inside and outside spaces. Wooden decking can come in virtually any size or shape to fit any area. Curved designs or large areas connected by pathways can create a stunning effect. Wooden decking is reasonably quick to install and causes minimal disruption, particularly when compared to alternate options like patio or paving. It can even be installed over the top of an existing patio. It is essential however to make sure that your wooden decking is structurally sound and capable of taking the weight of any furniture or plants that you would like to use on the decking. There is a array of varieties of wood that can be used in wooden decking. Normally decking is made of hardwood, but there are softwoods available that fulfil the durability specifications. As hardwood decking will need maintenance, which commonly requires yearly cleaning and staining for weather proofing, composite woods have become popular for use in wooden decking because they are stronger and require far less maintenance.

Average Wooden decking cost in Lifton

The typical cost of Wooden decking is £1500. Costs can change based upon the materials and the firm hired. The upper price range can be as high as £1725. The material costs are commonly approximately £375

Average price per Wooden decking job in 2024

Avg. price low

Avg. price low
£1,125

Avg. price

Avg. price
£1,500

Avg. price high

Avg. price high
£1,725

£1900

£1425

£950

£475

£0

Prices based on actual Wooden decking costs for Lifton, as reported by local LeadsDoWork members.

Wooden decking installation cost in Lifton 2024

Labour cost £1,050
Material cost £375
Waste removal £75
Time frame: 1-4 days

Wooden decking searches in November 2024

Wooden decking Projects in Lifton in October 2024

85

Requests for quotations in Lifton in October 2024

0

Requests for Wooden decking quotations in Lifton in October 2024. 0% change from September 2024.

0

Requests for Wooden decking quotations in Devon in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Wooden decking searches in cities and towns near Lifton October 2024

Lifton

Lifton is a town and also civil parish in Devon, South West England near the convergence of the rivers Wolf and also Lyd, 1 1/4 miles southern of the A30 trunk roadway and also very near the boundary in between Devon and also Cornwall. The town belongs to the electoral ward of Thrushel. The population of the surrounding Thrushel ward (which includes the town of Thrushelton to the east of Lifton) at the 2011 census was 1680. The village was bypassed by the A30 in 1993, and also today, abnormally for such a tiny area, Lifton is a post town and also has several young people football groups. It also has the 1st Lifton Sea Scouts.

Looking for Wooden decking in Lifton?

Get free quotes from local carpenters

Get free quotes

Wooden decking pros in Lifton

A1 FENCING & DECKING

15 review(s)
Based: in Plymouth, PL4 6NL

All types of domestic and garden and security fencing catered for free quotations no job too big or small

Latest review

Jeanne M., PL12
5

Garden | Decking in Saltash

The installation of the decking was very good but they did not clear up any of the mess afterwards so no stars for this

How it works

Tell us about your Wooden decking project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Carpenters in Lifton

Get free, no-obligation quotes from 4 verified Carpenters working in Lifton.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
Placholder Image

Other Top Projects in Lifton

Are you a carpenter in Lifton?

We can help you get more Wooden decking work and boost your business.

Join today