Bricklaying in Wallingford

Compare Bricklaying Prices in Wallingford

Home > General Building Projects > Bricklayers > Wallingford

Bricklaying in Wallingford

Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For some conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of the home.

 

This brick wall will demand foundations or lintel supports which may or may not already be present under the existing door. Often the window will not be a full width to match the existing garage door, so the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they will likely require extra insulation. Normally, this is done by adding interior wall insulation like insulated plasterboard, or with the addition of an additional layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. In addition, if the walls are shared with a neighbouring property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.

 

In contrast to several beliefs, a bricklayer actually does more than laying of blocks. There's even more to being a bricklayer than you can most likely think about. A solitary bricklaying jobs requires a broad variety of abilities. Let's take a look at these abilities!

  • Using moist resistant materials to seal structures.
  • Spreading out mortar between joints as well as using them to act as a thick layer binding the bricks with each other in rows.
  • Reviewing as well as functioning from requirements along with strategies.
  • Collaborating with brick-cutting devices.
  • Taking charge and caring for cement blocks or blocks, clay bricks and the sort.
  • Construction of scaffolding - based on possession of some licenses in some states.

This is not only an visual decision, as coordinating with existing brickwork is possibly a requirement of planning permission or building regulations in your area. We will supply approximately four Bricklayers pros locally, that will use quotations for the work you want done. You'll obtain a home visit from experts in Wallingford that'll help you to pick the best Bricklayers for your house prior to accomplishing the setup. Enter your postcode to start looking currently.

Average Bricklayers cost in Wallingford

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Wallingford, as reported by local LeadsDoWork members.

Bricklayers installation cost in Wallingford 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in March 2025

Bricklayers Projects in Wallingford in February 2025

278

Requests for quotations in Wallingford in February 2025

0

Requests for Bricklayers quotations in Wallingford in February 2025. 0% change from January 2025.

0

Requests for Bricklayers quotations in Oxfordshire in February 2025. 0% change from January 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Wallingford February 2025

Wallingford

Wallingford is a historical market town as well as civil parish situated to the south of Oxford on the River Thames in England. Historically situated in the area of Berkshire, it was moved to Oxfordshire for the functions of administration in 1974. Wallingford is positioned 12 miles (19 kilometres) north of Reading, 13 miles (21 km) south of Oxford and also 11 miles (18 km) north west of Henley-on-Thames. The community's population was 11,600 in the 2011 census. The town has actually played an essential function in English background starting with the surrender of Stigand to William the Conqueror in 1066, which brought about his taking the throne as well as the creation of Wallingford Castle. The castle as well as the community enjoyed royal condition as well as grew for much of the Middle Ages. The Treaty of Wallingford, which finished a civil war called The Anarchy between King Stephen and Empress Matilda, was signed there. The community after that got in a period of decrease after the arrival of the Black Death and also befalling of favour with the Tudor monarchs before being contacted once more throughout the English Civil War. Wallingford held up as the last continuing to be Royalist stronghold in Berkshire before giving up after a 16-week siege. Fearing that Wallingford Castle could be made use of in a future uprising, Oliver Cromwell bought its damage. Ever since Wallingford has become a market community as well as centre of regional business. At the centre of the community is a big competitive market square with the battle memorial and also 17th century arcaded city center to the south, the Corn Exchange theatre to the eastern and countless search the sides. Off the square there are alleys and roads with more stores and a number of historic inns. Although it was a village, Wallingford as soon as had 14 churches; currently, there are three ancient churches within the Parish of St Mary-le-More as well as St Leonard, a modern Roman Catholic church, a Quaker Meeting House dating from 1724 and also Baptist, Methodist and community churches.

Looking for Bricklayers in Wallingford?

Get free quotes from local builders

Get free quotes

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Wallingford

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Wallingford.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

Placholder Image

Other Top Projects in Wallingford

Customer Reviews

Overall rating:


Wallingford Bricklayers installers are rated 4.7 out of 5 based on 4 reviews of 34 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Wallingford Bricklayers contractors
Garden wall construction with London Heather bricks in Crawley Published: 22/01/2025 Looking to complete a garden wall construction in Crawley? Learn about the materials, process, and cost-effective options for your bricklaying project. Read this article
Garden wall repair and repointing in West Bromwich Published: 23/11/2024 Repair of two garden walls and repointing of a third wall needed for a terrace home in West Bromwich. Includes supply of new bricks and waste removal. Learn more about the process and costs. Read this article
Leaking flat roof repair for extension in Wirral Published: 01/03/2025 Need a leaking flat roof repaired in Wirral? Learn about the best solutions, costs, and how to prevent future water ingress. Read this article

Are you a builder in Wallingford?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today