Bricklaying in Wallingford

Compare Bricklaying Prices in Wallingford

Home > General Building Projects > Bricklayers > Wallingford

Bricklaying in Wallingford

Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For some conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of the home.

 

This brick wall will demand foundations or lintel supports which may or may not already be present under the existing door. Often the window will not be a full width to match the existing garage door, so the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they will likely require extra insulation. Normally, this is done by adding interior wall insulation like insulated plasterboard, or with the addition of an additional layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. In addition, if the walls are shared with a neighbouring property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.

 

In contrast to several beliefs, a bricklayer actually does more than laying of blocks. There's even more to being a bricklayer than you can most likely think about. A solitary bricklaying jobs requires a broad variety of abilities. Let's take a look at these abilities!

  • Using moist resistant materials to seal structures.
  • Spreading out mortar between joints as well as using them to act as a thick layer binding the bricks with each other in rows.
  • Reviewing as well as functioning from requirements along with strategies.
  • Collaborating with brick-cutting devices.
  • Taking charge and caring for cement blocks or blocks, clay bricks and the sort.
  • Construction of scaffolding - based on possession of some licenses in some states.

This is not only an visual decision, as coordinating with existing brickwork is possibly a requirement of planning permission or building regulations in your area. We will supply approximately four Bricklayers pros locally, that will use quotations for the work you want done. You'll obtain a home visit from experts in Wallingford that'll help you to pick the best Bricklayers for your house prior to accomplishing the setup. Enter your postcode to start looking currently.

Average Bricklayers cost in Wallingford

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Wallingford, as reported by local LeadsDoWork members.

Bricklayers installation cost in Wallingford 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in February 2025

Bricklayers Projects in Wallingford in January 2025

278

Requests for quotations in Wallingford in January 2025

0

Requests for Bricklayers quotations in Wallingford in January 2025. 0% change from December 2024.

0

Requests for Bricklayers quotations in Oxfordshire in January 2025. 0% change from December 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Wallingford January 2025

Wallingford

Wallingford is a historical market town as well as civil parish situated to the south of Oxford on the River Thames in England. Historically situated in the area of Berkshire, it was moved to Oxfordshire for the functions of administration in 1974. Wallingford is positioned 12 miles (19 kilometres) north of Reading, 13 miles (21 km) south of Oxford and also 11 miles (18 km) north west of Henley-on-Thames. The community's population was 11,600 in the 2011 census. The town has actually played an essential function in English background starting with the surrender of Stigand to William the Conqueror in 1066, which brought about his taking the throne as well as the creation of Wallingford Castle. The castle as well as the community enjoyed royal condition as well as grew for much of the Middle Ages. The Treaty of Wallingford, which finished a civil war called The Anarchy between King Stephen and Empress Matilda, was signed there. The community after that got in a period of decrease after the arrival of the Black Death and also befalling of favour with the Tudor monarchs before being contacted once more throughout the English Civil War. Wallingford held up as the last continuing to be Royalist stronghold in Berkshire before giving up after a 16-week siege. Fearing that Wallingford Castle could be made use of in a future uprising, Oliver Cromwell bought its damage. Ever since Wallingford has become a market community as well as centre of regional business. At the centre of the community is a big competitive market square with the battle memorial and also 17th century arcaded city center to the south, the Corn Exchange theatre to the eastern and countless search the sides. Off the square there are alleys and roads with more stores and a number of historic inns. Although it was a village, Wallingford as soon as had 14 churches; currently, there are three ancient churches within the Parish of St Mary-le-More as well as St Leonard, a modern Roman Catholic church, a Quaker Meeting House dating from 1724 and also Baptist, Methodist and community churches.

Looking for Bricklayers in Wallingford?

Get free quotes from local builders

Get free quotes

Bricklayers pros in Wallingford

JM Fencing and Landscaping

89 review(s)
Based: in Farnham, GU10 1FD

Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening and Fencing. We pride ourselves in offering a prompt, efficient service and are always conscious of our customers needs. I alw...

Latest review

Sam L., RG14
5

Building work | Bricklaying in Newbury

Excellent - came on time, always very punctual. Did an excellent job, very tidy, cleaned up thoroughly afterwards. I wou...

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Wallingford

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Wallingford.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Do bricklayers need a license?

Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.

As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.

It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.

Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

Placholder Image

Other Top Projects in Wallingford

Customer Reviews

Overall rating:


Wallingford Bricklayers installers are rated 4.7 out of 5 based on 5 reviews of 35 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Wallingford Bricklayers contractors

Are you a builder in Wallingford?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today